RO/DI N+1 Proposal
Freddie Quinto/Vic Gumban
Edwine Ang/ Johnny Lim
Maxim Confidential
Project Summary
The Proposal aims to provide redundancy to
- $ 242,000.00
Background
The Batangas Plant started operations 2007.
Facilities support was designed for Modules
Conclusion
Based on the failure mode table, it could be evinced that without the N+1 unit for the Generator,
RO/DI and Substation, these critical utility for Production would impair Plant wide operation that
could result to an adverse effect of the quality of product, service and cycle time to our customers.
We cannot deliver more output since we do not have flexibility. It is highly recommended to have an
N+1 for these critical Machine/system.
4
N+ 1 Equipment Plan
RODI System
Failure Mode
RODI System
Options
The RO/DI system is the critical utility for the Dicing saw machines
to produce the WLP product. It is also the critical utility for the
Corpane machine of the Module Operation. Any out of spec quality
due to D.I. water will cause an adverse effect on the product that
we built for our customers.
Recommendation
The N+1 unit is recommended to ensure 100% DI water quality at
Point of use.
HYPOCHLORITE
RAW WATER
TANK MOTOR
RO PRODUCT VESSEL
ANTI-SCALANT
CIP LINE
5 MICRON
FILTER
DE-GASSIFIER
0.2MICRON
FILTER
RETURN
92 gpm X 30 m TDH
3 KW Motor
RO PRODUCT
TANK MOTOR
UV LIGHT
RO CIP
TANK
DE-GASSIFIER
MOTOR
RO RECOVERY
DI BED
DI BED
TOC reduction
UNIT
RO PRODUCT VESSEL
FILTER
DRAIN
TO PRODUCTION
RO REJECT VESSEL
RO RECOVERY
RAW
WATER
LINE
RAW
WATER
TANK
DRAIN
DUAL
FILTER
TANK
300 l anthracite
0.8 -1mm
900 liters Silica
Sand 0.5-6mm
1,200 l granular
Activated carbon
GEC830, mesh size
8 X 30
92 gpm , 10.4 m/hr
Filtration velocity
5 MICRON
FILTER
92 gpm X 30 m TDH
3 KW Motor
RO
PRODUCT
TANK
75 gpm X 50 m TDH
3 KW Motor
ARIEL
8
Proposed system
9
RO/DI unit
Installation cost
Lighting Cost
Plumbing works
Roofing and Fence
Total
:
:
:
:
:
:
$ 181,000.00
$ 17,000.00
$ 3,000.00
$ 7,000.00
$ 34,000.00
$ 242,000.00
10
Existing RO/DI
System
Proposed
New RO/DI
System
Proposed
2MVA
Transformer
Proposed
Redundant
LVSG
Proposed
New Genset
Location
11