You are on page 1of 3

**Barangay Ordinance on Piggery Septic Tank Installation**

*Article 1: Title*

This ordinance shall be known as the "Barangay Piggery Septic Tank Installation Ordinance."

*Article 2: Purpose*

The purpose of this ordinance is to regulate and ensure the proper waste management practices in
piggeries within the barangay, aiming to prevent environmental pollution and safeguard public health.

*Article 3: Septic Tank Requirement*

3.1 All piggeries within the barangay are required to install and maintain an adequate septic tank system
for the proper disposal of pig waste.

3.2 The septic tank must comply with the standards set by the local health and environmental
authorities.

*Article 4: Design and Construction Standards*

4.1 The design and construction of septic tanks must adhere to established engineering standards for
effective waste treatment.

4.2 The capacity of the septic tank shall be proportional to the number of pigs and should accommodate
waste generated within the piggery.

*Article 5: Location and Setback Requirements*

5.1 The septic tank should be strategically located to minimize environmental impact and maintain a safe
distance from water sources, residential areas, and public spaces.

5.2 Minimum setback requirements from property lines and water bodies shall be observed during
septic tank installation.

*Article 6: Regular Maintenance*

6.1 Piggery owners are responsible for the regular maintenance and desludging of their septic tanks to
prevent overflow or leakage.

6.2 The frequency of maintenance activities shall be in accordance with the recommendations of the
local health authorities.
*Article 7: Inspections*

7.1 The barangay health officer or designated personnel shall conduct periodic inspections to ensure
compliance with septic tank regulations.

7.2 Non-compliance may result in penalties, suspension, or revocation of the piggery operation permit.

*Article 8: Permitting Process*

8.1 Piggery owners must secure a permit from the barangay office before establishing or modifying a
septic tank.

8.2 Permit applications should include detailed plans and specifications of the septic tank system.

*Article 9: Penalties*

9.1 Violation of any provision of this ordinance may result in fines, suspension of operations, or other
penalties determined by the barangay authorities.

9.2 Repeat offenses may lead to more severe penalties, including the revocation of the piggery operation
permit.

*Article 10: Education and Awareness*

10.1 The barangay shall conduct educational campaigns to raise awareness among piggery owners
regarding the importance of proper septic tank management.

10.2 Informational materials and workshops shall be organized to provide guidance on best practices for
waste disposal.

*Article 11: Implementation*

11.1 The Barangay Captain, in coordination with the barangay officials and health officers, shall oversee
the effective implementation of this ordinance.

11.2 This ordinance shall take effect fifteen (15) days after its approval.

Passed this ______ day of ________________, 20____.

____________________________
Barangay Captain

You might also like