o OBJECTIVES

o COURSE OUTLINE

o DETAILED SYLLABUS

o LESSON PLAN

NUST Institute of Civil Engineering/Engr Muhammad 2


Ammar
SURVEYING I (CE-
128)

OBJECTIVES

NUST Institute of Civil Engineering/Engr Muhammad 3


Ammar
SURVEYING I (CE-
128)
OBJECTIVES

o To enable students to understand theory


and practical of surveying

o To develop skills to use the modern


survey instruments

NUST Institute of Civil Engineering/Engr Muhammad 4


Ammar
SURVEYING I (CE-
128)

COURSE OUTLINE

NUST Institute of Civil Engineering/Engr Muhammad 5


Ammar
SURVEYING I (CE-
128)
COURSE OUTLINE
o COURSE TITLE: SURVEYING I

o COURSECODE: CE 128

o CREDIT HRS: 3
THEORY: 2
PRAC: 1

o NO. OF WEEKS: 18

o INSTRUCTOR: ENGR MUHAMMAD


NUSTAMMAR
Institute of Civil Engineering/Engr 6
Muhammad Ammar
SURVEYING I (CE-
128)
SCHEDULE
o WEEK # 01: General Introduction to Survey (Lec
1)

o WEEK # 02: Distance Measurement &


Chain/Compass Surveying (Lec 2)

o WEEK # 03: Plane Table Surveying (Lec 3)

o WEEK # 04: Traversing (Lec 4)

o WEEK # 05: Traversing (Lec 5)

o WEEK # 06: Traversing (Lec 6)


NUST Institute of Civil Engineering/Engr 7
Muhammad Ammar
SURVEYING I (CE-
o WEEK # 07: Leveling (Lec 7)
128)

o WEEK # 08: Leveling (Lec 8)

o WEEK # 09: Leveling (Lec 9)

o WEEK # 10: Contouring (Lec 10)

o WEEK # 11: Contouring (Lec 11)

o WEEK # 12: Computation of Areas (Lec 12)

o WEEK # 13: Computation of Volumes (Lec 13)

NUST Institute of Civil Engineering/Engr 8


Muhammad Ammar
SURVEYING I (CE-
128)
o WEEK # 14: Modern Instruments in Survey (Lec
14)

o WEEK # 15: Modern Instruments in Survey (Lec


15)

o WEEK # 16: Practical Survey Training (SURVEY


WEEK)

NUST Institute of Civil Engineering/Engr 9


Muhammad Ammar
SURVEYING I (CE-
128)
DISTRIBUTION OF MARKS
o THEORY
4 x Quiz 15 Marks
2 x Assignment 05
Marks
2 x One Hour Test (OHT)
30 Marks
1 x Final Exam
50 Marks

o PRACTICAL*
Practical Work/Projects 60 Marks
Final (Viva) 30 Marks
* Details will be conveyed to you before the start of survey week
Performance
NUST in field work/attendance
Institute of Civil Engineering/Engr Muhammad
10 10
Marks
Ammar
SURVEYING I (CE- 128)
RECOMMENDED BOOKS

o Surveying Principles and Applications by


Kavanagh

o Surveying and Leveling Vol. 1 by Kanetkar

o Surveying for Construction by Irvine (Reference


Book)

o Surveying Theory and Practice by Davis; McGraw


Hill (Reference Book)

NUST Institute of Civil Engineering/Engr Muhammad 11


Ammar
SURVEYING I (CE-
128)

DETAILED SYLLABUS

NUST Institute of Civil Engineering/Engr Muhammad 12


Ammar
SURVEYING I (CE-
128)
DETAILED SYLLABUS
1. GENERAL INTRODUCTION: Definition of survey, principle
of survey, types of survey, classification of survey,
instruments used in survey, precision and accuracy,
accuracy ratio, scale and its construction, distance
measurement and use of instrument for distance
measurement, errors, distance measured by tape and
errors involved, methods of chain surveying and errors
involved.

2. PLANE TABLE SURVEYING: Part and accessories of plane


table, setting and orientation, methods of plane tabling.

3. TRAVERSING: Methods of traversing, bearings and


NUST Institute of Civil Engineering/Engr Muhammad 13
calculation of angles from bearings, traversing with
Ammar
SURVEYING I (CE-
128)
4. LEVELING: Definitions, types of levels, Staff, principles
of leveling, reduction of levels, profile leveling,
curvature, refraction, effect of curvature and
refraction, corrections, barometric leveling,
hypsometry, errors in leveling.

5. CONTOURING: Definitions, characteristics & uses,


locating contours, interpolation of contours, setting
grade stake for sewers.

6. COMPUTATION OF AREAS: introduction, determination


of areas, computation of areas from plans, trapezoidal
rule, simpson rule

NUST Institute of Civil Engineering/Engr 14


Muhammad Ammar
SURVEYING I (CE-
128)
8. COMPUTATION OF VOLUMES: measurement of volumes
from cross-sections and various formulas for
computation of volumes, determination of capacity of
reservoir.

9. MODERN METHODS IN SURVEYING: principles of EDMI,


EMD characteristics, total station, Global Position
System.

NUST Institute of Civil Engineering/Engr Muhammad 15


Ammar
SURVEYING I (CE-
128)

LESSON PLAN

NUST Institute of Civil Engineering/Engr Muhammad 16


Ammar
SURVEYING I (CE-
128)
LECTURE # 01: INTRODUCTION TO SURVEY
1.Definition: - Surveying is the art of making such measurements as will determine
the relative positions of distinctive features on the surface of the earth in order that the
shape and extent of any portion of earth`s surface may be ascertained and delineated on
a map or plan. It is essentially a process of determining positions of points in a horizontal
plane. OR
Surveying is the art and science of measuring distances, angles & positions, on or near
the surface of the earth.
Leveling is art of determining the position of point in vertical plane.
2.Object of Survey: -
The primary object of surveying is the preparation of a plan or map.
A plan is therefore, the projected representation to some scale, of the ground
and the object on the horizontal plane which is represented by the plane of the
paper on which the plan is drawn. The representation is called a map, if the
scale is small, while it is called a plan, if the scale is large, e.g. a map of UK, a
plan of a building.
The science of surveying has been developing from the very initial stage of
human civilization according to his requirement. Earliest surveys were
performed only for the purpose of demarcating its boundaries of plots of land.
NUST Institute of Civil Engineering/ Engr Muhammad 17
Ammar
SURVEYING I (CE-
128)
Due to advancement in technology, the science of surveying has also attained
its due importance. In the absence of accurate maps, it is impossible to lay out
the alignments of roads, railways, canals, tunnels, transmission power lines, &
microwave or television relaying towers.
Detailed map of the sites of engineering projects are necessary, therefore,
surveying is the first step in the execution of any project

3. Types of Surveys:- (1) Plane Surveying and (2) Geodetic Surveying

Plane surveying: In plane surveying the curvature of the earth is not taken into
account, as the surveys extend over small areas. In dealing with plane surveys,
the knowledge of plane geometry & trigonometry is only required. Surveys
covering an area up to 260 sq. km may be treated as plane surveys because
the difference in length between the arc & the subtended chord on the earth
surface for a distance of 18.2km is only 0.1m.
Scope & Use of Plane Surveying: Plane Surveys are carried out for
engineering projects on sufficiently large scale. They are used for the layout of
highways, railways, canals, fixing boundary pillars, construction of bridges etc.
For majority of engineering projects, plane surveying is the first step to execute
them.
NUST Institute of Civil Engineering/ Engr Muhammad 18
Ammar
SURVEYING I (CE-
128)
Geodetic Surveying: The surveys in which curvature of the earth is taken into
account & higher degree of accuracy in linear as well as angular observations is
achieved are known as Geodetic Surveying. As the surveys extend over large
areas, lines connecting any two points are on the surface of the earth are
treated as arcs. A knowledge of spherical trigonometry is necessary for making
measurements for the geodetic surveys.
Scope & Use of Geodetic Surveying: Geodetic Surveys are conducted with
highest degree of accuracy to provide widely spaced control points on the
earths surface for subsequent plane surveys. In Pakistan, Geodetic Surveys
are usually carried out by the survey of Pakistan.
4. Classification Surveys may be classified in a variety of ways:
a. Classification based upon the nature of the field of survey:
(1) Land Surveys.
(2) Hydrographic Surveys.
(3) Astronomical Surveys.

b. Classification based upon the object of survey:


(1) Archaeological Surveys for unearthing relics of antiquity
(2) Geological Surveys for determining different strata in the earths crust.
NUST Institute of Civil Engineering/ Engr Muhammad 19
Ammar
SURVEYING I (CE-
(3) 128)
Mine Surveys for exploring mineral wealth such as gold, coal, etc.
(4) Military Surveys for determining points for strategic importance both
offensive and defensive.
(5) Engineering Surveys for determination of quantities for designing
engineering works.

c. Classification based upon the methods employed in survey:


(1) Triangulation Surveys.
(2) Traverse Surveys.

d. Classification based upon the instrument employed:


(1) Chain Surveys.
(2) Theodolite Surveys.
(3) Tachometric Surveys.
(4) Compass Surveys
(5) Plane Table Surveys.
(6) Photogrammetric Surveys.

NUST Institute of Civil Engineering/ Engr Muhammad 20


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 21


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 22


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 23


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 24


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 25


Ammar
SURVEYING I (CE-
6.
128)
Land surveys may be further sub-divided into the following classes:
(a) Topographical Surveys for determining the natural features of a
country such as hills, valleys. Rivers, nallas, takes, woods, towns, villages etc.
(b) Cadastral surveys in which additional details such as boundaries of
fields, houses and other properties, path ways, are determined.
(c) City Surveys for laying out plots and constructing streets, water supply
systems, and sewers.

7. Engineering Surveys may be further sub-divided into:


(i) Reconnaissance surveys for determining the feasibility and rough cost
of the scheme.
(ii) Preliminary surveys for collecting more precise data to choose the
best location for the work and to estimate the exact quantities and costs
(iii) Location surveys for setting out the work on the ground.

8. Principles of Surveying: - The two fundamental principles upon which


various survey methods are based are:

NUST Institute of Civil Engineering/ Engr Muhammad 26


Ammar
SURVEYING I (CE-
128)
1. To work from the whole to the part: The main principle of
surveying is to work from the whole to the part. To achieve this in actual practice, a
sufficient number of primary control points are established with higher precision in &
around the area to be detail surveyed. Minor control points in between the primary
control points are then established with less precise method. Further details are
surveyed with the help of these minor control points by adopting any one of the survey
methods. The main idea of working from the whole to the part is to prevent
accumulation of error & to localize minor errors within the framework of the control
points. On the other hand, if survey is carried from the part to the whole, the errors
would expand to greater magnitudes & the scale of the survey will be distorted beyond
control.

2. Location of a point by measurement from two control points:


The control points are selected in the area & the distance between them is measured
accurately. The line is then plotted to a convenient scale on a drawing sheet. The
location of the required point may then be plotted by making two measurements from
the given control points as follow:
Let A & B be two given control points. Any other point, say D can be located
with reference to these points, by any one of the following method:
NUST Institute of Civil Engineering/ Engr Muhammad 27
Ammar
SURVEYING I (CE-
128)
Rectangular coordinates by the perpendicular dD and the distance Ad. The
distance Bd may be measured instead of Ad (fig--)

Trilateration: by the two distances AD and BD (fig--)

Polar coordinates: the angle BAD measured at A and the distance AD.
Instead, by angle DBA measured at B and the distance BD (fig--)

Triangulation: by the two angles BAD and ABD measured at A and B (fig---)

NUST Institute of Civil Engineering/ Engr Muhammad 28


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 29


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 30


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 31


Ammar
SURVEYING I (CE-
128)
Plain Scale: On a plain scale it is possible to read only two dimensions such as
meters and decimeters, units and tenths etc.

Example: Draw a scale 1cm = 4m to read to a meter and show on it 47m.


Const: Draw a line 20 cm long and divide it into eight equal parts. Subdivide the
first division from the left into 10 equal parts each subdivision reading 1 meter. Place the
zero between the subdivided part and the undivided part and mark the figures counting
from zero in both dir. To read 47m place one leg of the dividers at 40 and the other at 7.

10. Stages of Survey Operations: The entire work of a survey operation may be
divided into three distinct stages:
1. Field work-Reconnaissance, Observations, Field Records
2. Office work-Drafting, Computing, Designing
3. Care & adjustment of the instruments

11. Accuracy Of Surveyed Quantities:


Surveyors primary objective is to achieve accuracy in their measurements.
Survey is of little value if it is not accurate.
In surveying, the most common task is to find the 3D positions of a series of
NUST Institute of Civil Engineering/ Engr Muhammad 32
Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 33


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 34


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 35


Ammar
SURVEYING I (CE-
128)
points, the x, y & z coordinates. Physical measurements are therefore
required in the form of linear, angular & height dimensions. There will be
error in these quantities which must be eliminated, discounted or distributed.

a). Classification of Errors:

Gross: They are simply mistakes. They arise mainly due to the
inexperience, ignorance or carelessness of the surveyor. These errors
cannot be accommodated & observations have to be repeated.
Examples: reading the tape wrongly, recording a wrong dimension when
booking, turning the wrong screw on an instrument.

Systematic: These are errors which arise unavoidably in surveying & follow
some fixed law. Their sources are well known. A simple example is
illustrated by the temp error in tape measurements. A tape is only correct at
a certain standard temp; therefore if the ambient temp on a certain day is
higher or lower than standard, the tape will expand or contract & cause an
error which will be the same no matter how often the line is measured.

NUST Institute of Civil Engineering/ Engr Muhammad 36


Ammar
SURVEYING I (CE-
128)
Constant: These are errors which do not vary at any time, in other words,
they have the same sign, either positive or negative. As an illustration,
consider the nature of the dimensions required for plotting on maps & plans.
These must be horizontal & if no attention is paid to the slope of the ground
when making a measurement, the dimension so obtained will be too long.
No matter how often the measurement is made or how many other slopes
are measured, the results will always be too long.
Likewise, if a tape has stretched through continuous use, any resultant
measurements will always be too short.
Constant errors are well known & appropriate corrections are applied
to obtain the correct result.

Accidental/Random: These are the small errors which inevitably remain


after the others have been eliminated. There are three main causes:
Imperfections of human sight & touch (human errors), Imperfections of the
instruments being used at the time & Changing atmospheric conditions.
A good example arises in the measurement of an angle using an
instrument called a theodolite.

NUST Institute of Civil Engineering/ Engr Muhammad 37


Ammar
SURVEYING I (CE-
128)
b). Accuracy & Precision: Accuracy & Precision are not synonymous. The
difference is illustrated in the following example:
A line of survey is measured six times & all six measurements lie
within an error band of 2mm. However, the tape when checked, is found to
have stretched by 10mm through continuous use.
The results of the six measurements are precise in that they have little
scatter but they are not accurate because each is in error by 10mm.
In surveying, accuracy is defined by specifying the limits between
which the error of a measured quantity may lie, for example, the accuracy of
the measured building might be (20.54 0.01) metres.

Accuracy Ratio: The accuracy ratio of a measurement or series of


measurements is the ratio of error of closure to the distance measured. The
error of closure is the difference between the measured location & the
theoretically correct location.
To illustrate, a distance was measured & found to be 250.56 ft. The
distance was previously known to be 250.50 ft. The error is 0.06 ft in a
distance of 250.50 ft.

NUST Institute of Civil Engineering/ Engr Muhammad 38


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 39


Ammar
SURVEYING I (CE-
128)
accuracy ratio = 0.06/250.50 = 1/4175 = 1/4200

The accuracy ratio is expressed as a fraction whose numerator is unity &


whose denominator is rounded to the closest 100 units.

NUST Institute of Civil Engineering/ Engr Muhammad 40


Ammar
SURVEYING I (CE-
128)
LECTURE: DISTANCE MEASUREMENT
Two main methods of determining the distances between points on the surface of the
earth.

Direct Measurement: distances are actually measured on the surface of the earth by
means of chains, tapes etc.

Computative Measurement: Distances are determined by calculations indirectly by


using the field data as in triangulation, tacheometry etc.

Instruments for Measuring Distances:


1). Chain-Gunters Chain (66ft), Engineers Chain(100ft), Metric Chain(20/30m)
2). Steel Band
3). Tapes-Cloth/Linen Tape, Metallic Tape, Steel Tape, Invar Tape

Arrows/Chain Pins: 10 arrows generally accompany a chain, used to mark the end
of each chain during the process of chaining.
NUST Institute of Civil Engineering/ Engr Muhammad 41
Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 42


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 43


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 44


Ammar
SURVEYING I (CE-
128)
Instruments for Marking Stations:
1). Pegs 3). Ranging Poles 5). Plumb Bobs
2). Ranging Rods 4). Offset Rod

Ranging a Line: The process of marking a number of intermediate points on a survey


line joining two stations in the field so that the length between them may be measured
correctly, is known as ranging.
Ranging may be classified as DIRECT RANGING & INDIRECT RANGING

Direct Ranging: When intermediate ranging rods are placed along the chain line, by
direct observation from either end station, the process is known as direct ranging.

Line Ranger: It is a small reflecting instrument used for fixing intermediate points on
a chain line.

Indirect Ranging: When end stations are not intervisible & the intermediate ranging
rods are placed in line by interpolation or by reciprocal ranging or by running an auxiliary
line (or random line), the process is known as Indirect Ranging.

NUST Institute of Civil Engineering/ Engr Muhammad 45


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 46


Ammar
SURVEYING I (CE-
Degree of Accuracy in Chaining: 128)
For comparison of precision of chaining when line
of different lengths are measured under dissimilar conditions, it is the usual practice to
express the error as ratio (1:n), which is called the chaining ratio. It is the ratio of the
error to the distance measured.
EXAMPLE: 1/1500, 1/5000 etc. By this is meant an error of 1 unit in 1500 units,
or an error of 1 unit in 5000 units
The limits of errors under different conditions are as follows:
1). For ordinary measurements with a steel band on flat ground & with careful
work: 1 in 2000.
2). For ordinary measurements with a carefully tested chain on fairly level
ground & with reasonable care: 1 in 1000.
3). Under average conditions: 1 in 500.
4). For measurements over rough or somewhat hilly ground: 1 in 250.

Error in Measurement due to Incorrect Chain Length: If the chain is too long, the
measured distance will be less & if the chain is too short, the measured distance will be more.
a. The true length of line = L / L x measured length of line
Where L = the incorrect length of a chain or tape
And L = the true length of a chain or tape
Note : Use plus sign when the chain is too long and minus sign when it is too short
NUST Institute of Civil Engineering/ Engr Muhammad 47
Ammar
SURVEYING I (CE-
b. The true area of a plot of128)
a land = (L/L) x Measured area of the plot
2

c. The true volume of an excavation = (L/L)3 x Measured volume of the


excavation

Examples on Correction of Distance and Area:

1. The length of a line measured with a 20 m chain was found to be 634.4 m. It was
afterwards found that the chain was 0.05 m too long. Find the true length of the line.
Solution:
True length of line = L/L x measured length of line.
L = 20.05 m.
L = 20 m.
Measured length = 634.4 m.
Therefore, True length of the line = 20.05/20x 634.4
= 635.00 m.

NUST Institute of Civil Engineering/ Engr Muhammad 48


Ammar
SURVEYING I (CE-
128)
2. The length of a line measured by means of a 20 m chain was found to be 610.2 m
known to be 612.0 m. What was the actual length of the chain?
Solution:
Since the measured length of the line is less than its true length, the chain was too long.
Now true length of the line = L/L x measured length.
True length of the line = 612.0 m.
Measured length of the line = 610.2 m.
L = 20.0 m.
:. 612.0 = L/20.0 x 610.2
:. L = 612.0x20.0/610.2=20.066 m.

3. A 20 m chain was found to be 0.05 m too long after chaining 1400 m. It was found to
be 0.1 m too long after chaining 2200 m. If the chain was correct before commencement
of the work find the true distance.
Solution:
a. Since the chain was correct i.e. 20 m long at the beginning and was 20.05 m
long after chaining 1400 m, the increase in length was gradual.
:. Mean elongation = 0+0.05/2=0.025 m.
:. True distance = 20.025/20 x 1400 = 1401.75m.
NUST Institute of Civil Engineering/ Engr Muhammad 49
Ammar
SURVEYING I (CE-
b. 128)
The remaining distance (2200-1400) = 800 m was measured with the same
chain. If was 0.05 m too long at the commencement of chaining and 0.10 m too long at
the end of chaining.
:. Mean elongation = 0.05+0.10/2 = 0.075 m.
True distance = 20.075/20 x 800 = 803.00m.
where, total true distance = 1401.75 + 803.00 m.
= 2204.75 m.

CHAINING ON SLOPING GROUNDS:


1). Chaining on the surface of a sloping ground gives the sloping distance.
2). For plotting the surveys, horizontal distances are required.
3). It is therefore, necessary either to reduce the sloping distances to horizontal
equivalents or to measure the horizontal distances between the stations directly.
4).Two methods for getting the horizontal distance between two stations on a
sloping ground:
DIRECT METHOD & INDIRECT METHOD

NUST Institute of Civil Engineering/ Engr Muhammad 50


Ammar
SURVEYING I (CE-
128) Fig. DIRECT
METHOD:
Horizontal distances
are measured on the
ground in short
horizontal lengths.
Also known as
Stepping Method.

NUST Institute of Civil Engineering/ Engr Muhammad 51


Ammar
SURVEYING I (CE-
128)

Fig. INDIRECT METHOD: Measuring the slope


angle with a CLINOMETER

Fig. INDIRECT METHOD: Measuring


the slope angle from Difference in
Elevations

NUST Institute of Civil Engineering/ Engr Muhammad 52


Ammar
SURVEYING I (CE-
128)

Fig. INDIRECT METHOD: Hypotenusal


Allowance Correction Method

NUST Institute of Civil Engineering/ Engr Muhammad 53


Ammar
SURVEYING I (CE-
ERRORS IN CHAINING: 128)
1). Cumulative Errors
2). Compensative Errors

o CUMULATIVE ERRORS: The errors which occur in the same direction & tend to
accumulate, or to add up are called Cumulative Errors. Such errors make the apparent
measurements always either too long or too short.

a). Positive Cumulative Errors: Those errors which make the measured lengths more
than the actuals are known as positive cumulative errors. These are caused in the
following situations:
i). The length of the chain or tape is shorter than its standard length.
ii). The slope correction ignored while measuring along the sloping ground.
iii). The sag correction, if not applied, when the chain or tape is suspended at
its ends.
iv). Due to incorrect alignment.
v). Due to working in windy weather.

NUST Institute of Civil Engineering/ Engr Muhammad 54


Ammar
SURVEYING I (CE-
b). Negative Cumulative Errors: The128)
errors which make the measured lengths less
than the actuals are known as negative cumulative errors. These are caused in the
following situations:
i). The length of the chain or tape is greater than its standard length.

o COMPENSATING ERRORS: The errors which are liable to occur in either direction &
tend to compensate are called compensating errors. These are caused in the following
situations:
i). Incorrect holding of the chain
ii). The chain is not uniformly calibrated throughout its length
iii). Refinement is not made in plumbing during stepping method

COMMON MISTAKES IN CHAINING:


i). Displacement of the arrows
ii). Failure to observe the zero point of the tape
iii). Adding or omitting a full chain length
iv). Reading from the wrong end of the chain
v). Reading numbers wrongly/ Reading wrong meter marks
vi). Wrong recording in the field book
viii). Calling numbers wrongly
NUST Institute of Civil Engineering/ Engr Muhammad 55
Ammar
SURVEYING I (CE-
128)
CORRECTIONS FOR LINEAR MEASUREMENTS:
i). Correction for standard length
ii).

NUST Institute of Civil Engineering/ Engr Muhammad 56


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 57


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 58


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 59


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 60


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 61


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 62


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 63


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 64


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 65


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 66


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 67


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 68


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 69


Ammar
SURVEYING I (CE-
128)

NUST Institute of Civil Engineering/ Engr Muhammad 70


Ammar

You might also like