You are on page 1of 53

Jamil R EL BANNA

CADER SITE
RBS 6201
RBS 6201 1DUG and 1 DUW
Insert DUW 30 01 beside the first 1 DUW 20 01
3 DUG 8+8+6 900 MHZ
Primary cable IDL DUW to secondary
IDL DUW 2
HOW TO INSTALL SECOUND DUW FOR
RBS 6201
• 2- DUW 30 01 – 3*RUS 02 B8
• 1-DUG 20 01 TRX - RUS 01 B8
• 2-DUG 20 01 8 TRX – RUS 01 B8
• 3DUG320 01 6 TRX – RUS 01 B8
• Make IDB for 3 DUG and install it
• Configuration the DUG as antenna sharing
IDB for 3 DUG
Check Ex alarm at site be for you start
Run hyper terminal

For math the second DUW 30 -01


1-reload –
2- mount_c2
3-formathd /c2 -- y
4-formathd /d -y
5-File format to clean the C and D
6-reload
7-ip config
8- install c and d that remove from the first one
9-reload
1-Copy package C and D for the DUW 20 -01 for safety and copy them
to new packge
2- Make CV be for you start and name as you like ( be for U900)
3- Let the RNC look to you the site cell
4-Make export and delete
5-change the file cabinet.xml that you make export to it from stranded
to Extended
6- Go to cabinet equipment configuration install the cabinet.xml file
plug in the cable and turn on the second DUW it will make red for
less them one minute and blue them green
Note you don’t need the site.xml file

7-Install site.xml file from the new hard ware for U900
Make CV Be for U 900
Export and delete
Make sure that the cell was locked
from RNC
Step on cv
Go to cabinet and change it from
standerd to Extended
• <ClimateSystem
• climateSystem=“Standard"
• />
• </Cabinet>
• <ClimateSystem
• climateSystem=“Extended"
• />
• </Cabinet> cabinet.xml
Cabinet equipment configuration
The second DUW must be of
Plug in the idl cable primary must be at
first DUW secondary for second DUW
Radio building block be for add
We must use RBB11-1A because
the IDB at OMT RBB11-1A
Radio building block be for add
Next to end
Next
Press yes
Begun to install
After pressing continue the element
manger will go of
• The Element manger will go of after press
continue wait about 3 minute and enter it
again you will see 2 DUW
You can see 2DUW but passive not
ready until finished the sync
In this time you can change the hyper
terminal to the first duw to see the
procedager
Sync start
INSTALL THE SITE
NEXT –NEXT NEXT TO FINISHED
FINISHED INSTALL THE SITE HARD
WARE
Ex alarm for the site
All the DUG must having no alarm

You might also like