WTT Next generation developed based on project requirement for Integration &
CR parameter implementation tracker.
Cronos functionality & WTT (old) functionality are merged into one tracker
become WTT Next Generation
• Regional Project Initiated the Ticket Create, start with fill in the form that available for
the engineer field with status : PRE OPEN
Create for TICKET
Normal in ENGINEER • Shift Leader Assign to NIC Team Member On Duty
PART
• When in dash Board of NIC TEAM will received the ticket that dispatch by Shift Leader
Team, with status ASSIGNED, next process are from ASSIGNED IN PROGRESS
Process next Step in Closed
OSS TEAM that already
dispatch from SL • Next after the OSS team done their Job do the Update status in CRONOS
• If OSS Team shift finished and Ticket still in progress/Open, they ask SL to Handover
OSS Team/SL Hand
Ticket to next shift/closed ticket
Over to next Shift
Q&A