a case study
STRUCTURAL HEALTH
MONITORING
RENU SAHU
DR. MEENA MURMU
(17243010)
SHUBHAM BAKSHI
(17243012)
Objective of building assessment
Preliminary assessment –
visual, rapid and low cost assessment
procedure.
Detailed assessment –
Time consuming ,cost consuming and slow
process.
Preliminary investigation
Steps –
1.Collection of information.
2.Visual inspection of condition and recording distress.
3.Evaluation of safety against performance criteria.
Information needed-
Complete record of building design details, drawing.
Details of any repair or retrofitting done. load details.
if above information is not available detailed
assessment is conducted.
Observations in visual investigation