You are on page 1of 1

RESULT INTER-RAT MLB

Trial InterRat Mlb Switch already executed on 17 May 2018, but after Average of L.IRATHO.E2W.Load.PrepAttOut (None) Average of L.IRATHO.E2W.Load.ExecAttOut (None)
execution counter related MLB Inter RAT not triggered. Parameter InterRat 1 1
0.9 0.9
Mlb Switch already activated. 0.8 0.8
0.7 0.7
0.6 0.6
0.5 0.5
0.4 0.4
0.3 0.3
0.2 0.2
0.1 0.1
0 0

Total Total

Number of load-based EUTRAN-to-WCDMA handover Number of load-based EUTRAN-to-WCDMA handover


preparation attempts execution attempts

Average of L.IRATHO.E2W.Load.ExecSuccOut (None) Average of L.RRCRedirection.E2W.Load (None)

1 1
0.9 0.9
0.8 0.8
0.7 0.7
0.6 0.6
0.5 0.5
0.4 0.4
0.3 0.3
0.2 0.2
0.1 0.1
0 0

Total Total

Number of successful load-based EUTRAN-to-WCDMA Number of load-based EUTRAN-to-WCDMA redirections


handover executions

You might also like