Step# 2: Unrestricted
number of FACH users.
I. FACH Congestion due to limited
number of users
What is the cons of having limitation in number of FACH users?
1. If D2F failed (due to max number of FACH users are reached) then UEs in the
CELL_DCH state, having little or no data to transmit, may continuously occupy the
dedicated channels and cell resource utilization may decrease as a result
2. If P2F failed then CELL_PCH UEs fail to perform data transmission or respond to
paging messages and finally enter the idle state, leading to PS service drops plus
paging failure.
3. If the number of UEs in the CELL_FACH state reaches the upper limit, cell updates
may fail, including those triggered by radio link setup failures. As a result, call
drops may occur.
Proposal
• Step#1: Increase number of FACH users from 30 to 60 (but take care of FACH
resource congestion) “FACH_60_USER_SWITCH-1”
Proposal cont….
Proposal
• Step#2: FACH FC “P2D and D2Idle”:
the RNC suspends RLC data transmission This function enables UEs in F2P transitions by means of
when triggering an F2D state transition. the CELL_PCH state to enter physical channel
The RNC keeps RLC data transmission the CELL_DCH state when the reconfiguration reduce FACH
suspended until the F2D state transition is amount of data to be bandwidth consumption,
complete or the UE returns to the transmitted exceeds the 4A because physical channel
CELL_FACH state. This ensures that user- threshold. This eliminates the reconfiguration messages
plane data is transmitted over the DCH need for P2F transitions prior generate 50% less air interface
whenever possible. to F2D transitions and traffic than RB reconfiguration
SET thereby improves the FACH messages.
URRCTRLSWITC PROCESSSWITCH3 resource utilization
RNC_F2D_RLC_SUSPEND_SWITCH-1. efficiency.
P2D (for DTCH congestion)
• When the DTCH is congested, RNC triggers P2D
transition. The trigger conditions and how
DTCH flow control is implemented are as follows:
• When a UE with PS services in the CELL_PCH state
initiates a cell update, a P2D transition is triggered if
the following conditions are met:
1. The PROCESSSWITCH2 parameter is set
to FACH_DTCH_CONGEST_P2D-1.
2. The UE is of Release 5 or a later version.
3. The DTCH is congested but the CCCH and DCCH are not.
4. In the cell update message triggered by PS data
transmission, the value of IE "Cell update cause" is "uplink
data transmission" or "paging response", and the
IE "Establishment cause" is not reported.
D2Idle
• The following describes how a D2Idle procedure is
triggered for UEs processing PS services when the DTCH is
congested:
• When PERFENH_DTCH_FACH_CONG_D2I_SWITCH is
selected under PerfEnhanceSwitch, the RNC initiates a D2F
transition request. If the DTCH is congested, the RNC
evaluates the measurement quantities (indicating the
traffic volume or throughput) contained in the uplink and
downlink 4B measurement reports. If the measurement
quantities are all 0, a D2Idle transition starts. If the
measurement quantities are not all 0, the UE remains in
the CELL_DCH state.
• DTCH flow control stops once the DTCH is no longer
congested.
Time Plan
P2D (for DTCH FACH Efficiency boost D2Idle
Congestion) – Data suspension
2
3
21/ /
11/11 13/11
13/11 15/11
15/11 18/11
11 1
1