You are on page 1of 29

Telecom O&M

UTILITY REVIEW

*Additional Notes 2
UPTIME TREND

UPTIME
100

99.9 99.89

99.8

99.72
99.7
99.67

99.6
99.53
99.5

99.4

99.3
Aug Sep Oct Nov
UPTIME TREND

Overall Exluding PE & Autorestore Vertiv


100
99.89
99.79
99.8
99.72
99.67 99.67
99.6 99.53
99.4499.47
99.41
99.4 99.31
99.28 99.25
99.2

99

98.8
Aug Sep Oct Nov
4
PM TREND
120.00%

99.00%
100.00% 95.00% 96.00%

80.00%

60.00% 55.00%

40.00%

20.00%

AUG SEPT OCT NOV


0.00%
PM DONE
SITES MAINTAINED 100% UPTIME

AUG’18 SEP’18 OCT’18 NOV’18

1400

1200

1000

800

1076 1076 1076 1076


600
761

400 495 463


378

200
Total Sites 100 % Uptime
Maintained

6
FF Sites ( More than twice)

700
651
601
600

500

400
330
300

217
200

100

0
Aug Sep Oct Nov
Site down due to “NO Fuel”

100

90

80

70

60

50 49

40

30 28
28

20

12
10
Aug Sep Oct Nov
Sites in Automation

540
530
530

520
514
510
502
500

490

480
472
470

460

450

440
Aug Sep Oct Nov
Sites without DG Batteries

300

250 244

200

156
150
120
100
100

50

0
Aug Sep Oct Nov
Sites with Problems in DG (Major and Minor)

180
168
160 155

140 132
120
108
100

80

60

40

20

0
Aug Sep Oct Nov
Sites with Problems in AC (Major and Minor)

8
8

4
4

2
2

0
0
Aug Sep Oct Nov
Sites with Problems in PP (Major or Minor)

100.005

100 99.999

99.995

99.99 99.99
99.99

99.985
99.982
99.98

99.975

99.97
Aug Sep Oct Nov
Sites on which B Checks carried out

100.005

100 99.999

99.995

99.99 99.99
99.99

99.985
99.982
99.98

99.975

99.97
Aug Sep Oct Nov
Fuel consumption/site

250

200 195

158
150 141

102
100

50

0
Aug Sep Oct Nov
EB consumption/site

3000

2572 2500
2500

2072
2000 1939

1500

1000

500

0
Aug Sep Oct Nov
ABOVE CPH SITES

600

500
500

400
Total DG Sites
Running above CPH
300 Report submitted
Rectification done
200 Linear (Rectification done )

100

8 0 8
0
Aug Sep Oct Nov

*Additional Notes 17
FIBER PERFORMANCE

*Additional Notes 18
TOTAL FIBER
3000
2818

Jul-17
2500
2162
Aug-17

2000 Month to HOTO

1500

1000
655 655
500
180
30
0
Intercity Intracity
19
Fiber Cuts trend

100.005

100 99.999

99.995

99.99 99.99
99.99

99.985
99.982
99.98

99.975

99.97
Aug Sep Oct Nov
MTTR Cuts trend

100.005

100 99.999

99.995

99.99 99.99
99.99

99.985
99.982
99.98

99.975

99.97
Aug Sep Oct Nov
EXPOSED FIBER/DUCT
3000
2818

2500

2000

Total length
1500
Duct Exposed
Aerial Cable
1000
655
500
0.267
0.132
2.95 3.62
0
Intercity Intra city
22
ROAD EXTENSION OR OTHER WORK
400
348
350

300

250 Total No's of Routes


211
200 Work on Routes

150 Linear (Work on


Routes)
100

50 28
10
0
Intercity Intra city

23
OTDR STATUS
140
122
120

100

80

Total Routes
60

40

20

0
Aug Sep Oct Nov

24
LSPM STATUS
30
26
25
23

20 19

15 14

10

0
Aug Sep Oct Nov

25
FIBER RECTIFICATION PLAN
12

10
10

8
Total Traces taken

6 Traces found
problematic
Planning for
4 Rectification
3 3

0
OTDR

26
ACTION TAKEN TO REDUCE CUTS

*Additional Notes 27
SUPPORT REQUIRED FOR UTILITIES & FIBER

*Additional Notes 28
THANK YOU

You might also like