You are on page 1of 18

METHODOLOGY FOR HEAVY OIL

1
REMOTE
OPERATION

COMBUSTION
IN SITU
SAGD-D/THAI

THERMAL
TECHNOLOGY
STEAM DRIVE

CICLIC STEAM
STIMULATION
COLD
PRODUCTION

•OOIP-RESERVES
Solution Identification •TECHNOLOGY
Develop detailed design •AREAL NET PAY DISTRIBUTION
•EXPLOITATION SCHEME

RESERVOIR CHARACTERIZATION
Reservoir Diagnosis Well Diagnosis
Screening for Prospects Screening for Prospects
Static Side Dynamic Side

2
WELL LOCATION
497600 498000 498400 498800 499200 499600 500000 500400 500800 501200 501600 502000 502400 502800 503200 503600 504000 504400 504800 505200 505600 506000 506400 506800 507200

CD-40

969600

969600
CN-102

969200

969200
CDB-58

968800

968800
CD-41 CN-136
968400

968400
968000

968000
CN-198
967600

967600
967200

967200
CIB-269
CN-192
966800

966800
CIB-254
966400

966400
CNX-24 CN-195
966000

966000
965600

965600
CIB-256 CIB-11E
CIB-7E
CNX-25
965200

965200
CIB-12E
CIB-6E
BCN-6
964800

964800
CIB-8E
CN-123
964400

964400
BCN-4
964000

964000
CIB-9E CN-47
963600

963600
CIB-271
CIB-13E
CIB-10E CN-125
963200

963200
962800

962800
962400

962400
CN-121 CNX-23
962000

962000
961600

961600
497600 498000 498400 498800 499200 499600 500000 500400 500800 501200 501600 502000 502400 502800 503200 503600 504000 504400 504800 505200 505600 506000 506400 506800 507200

Mapa Base 0 500 1000 1500 2000 2500m


Area Ultima Fecha de Modificación
M-19. Extrapesado Morichal Agosto 2006
Campo Elaborado por:
Cerro Negro Estudios Integrados XP Morichal 1:20000
Escala Observaciones
1:20000

3
CN-193 CES-2-O

4
5
6
NERITICO-PRESENCIA DE CONCHAS

TRANSICIONAL-BIOTURBACIONES

FLUVIAL
FLUVIAL

? ? ?
BASAMENTO
7
STRATIGRAPHIC SECTION REGIONAL FPO

8
MARINO

TRANSICIONAL

FLUVIAL

9
10
11
SAGD SCREENNING

12
NET PAY MAP

BOYACA JUNIN AYACUCHO CARABOBO


POES
489 557 87 227
MMM Bls
POES
CONTACTADO IAV / 25% 30% 10% 31%
ICV
POES
CONTACTADO 55% 50% 5% 54%
SAGD
POES
CONTACTADO 20% 20% 85% 15%
FRIO/CHOPS

13
SD/CSS SCREANNING

14
FAJA´S SUITABLE TECHNOLOGIES

15
RECOVERY FACTOR

16
SISMIC SECTION

17
POZO CH0714
Wellhead DIAGRAMA DE COMPLETACION
DEL POZO CH0714
Adapter Spool
3-1/8” X 5-1/8” C Section S/N: 89882-20
B Section S/N: 84699-02 PCP Model 98
13 3/8”, 54.5# A Section S/N: 75898-33
J-55 BTC Casing @ Tubing Hanger (BTC Thds)
497’ X-over, 5-½” BTC pin (top) X 5-½" LTC pin (btm) @ 31’
TEC Line to surface 40’ PR, 10’ pony of 1-¼" HS, 8’ pony of 1-¼"
1’ pony of 1-¼" HS rotor (SN 36284), 97 Grade 125 Rods,
(SENSOR Nro 6662 & 4330R / 4130C ,8’ pony of 1-¼" HS rotor (SN 36284)
Carrier @ 3078,39’MD 3043,76’ of 5-1/2”, 15.5# J55Tubing, LTC ( 93 Joints)
[2567’ TVD]
S/N: M-61200-9

5 1/2”PIN x PIN Pup Joint Ltc@ 3080,59’


5-½” Drain Nipple,
1Jt 15.5 5-½", #, J-55 LTC Range 2 Tbg, top @ 3083,99’
top @ 3116,91’
1Jt 5-½", 15.5#, J-55 LTC Range 2 Tbg, top @ 3117,93’
5½”solation 2 jts 5 1/2”, 15.5#, J-55 LTC Tubing, top @ 3151,82’
Nipple, top @
3150,75’ X-over, 4 1/2" EUE 8rd BOX x 5 1/2" LTC box, to@3217,21’
PCP Griffin Pump Orbiting Tube
(SN 316) @ 3218,18’ Rotor (SN 36284)
Tag Bar Sub, top 4 ft Pup Joint 4-½", 12.75#, J-55 8rd EUE, top @ 3252,81’
@ 3251,25’ Excalibre No-Turn Torque Anchor; top @ 3256,96’
30 ft Perforated Joint 4 1/2", J-55, EUE 8rd, 180 x 0.5” holes
top @ 3258,71’ MD
4-½” Catcher w/ Bull Plug, BTM @ 3288.71’ MD

Tangent Section:
3153’- 3306’ MD Liner Hanger Packer @ 4745’
2593’-2645’TVD Liner: 7”, 23#, J-55, BTC @ 7010 ’

(0.030" x 1.8", 144 slots/ft)


9-5/8" 36#, J-55 BTC Casing @ 4870 ’ End of Lateral
@ 7168’

18

You might also like