Background
• Recall that Factory Overhead is applied to
production in a rational systematic manner, using
some type of averaging. There are a variety of
methods to accomplish this goal.
• These methods often involve tradeoffs between
simplicity and realism
209.00 x 1.25
Learning
Objective
2
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
Activity Based Costing System
(ABC)
Stage One
Identify significant
activities and assign overhead
costs to each activity in
proportion to resources used.
Activity Based Costing System
(ABC)
ABC systems follow a
two-stage procedure Overhead assigned to
to assign overhead activities are called
“activity cost pools.”
costs to products.
Stage Two
Identify cost drivers
appropriate to each activity
and allocate overhead to
the products.
Learning
Objective
3
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
Overhead Costs
Total budgeted cost = $3,894,000 Identification
Activity
of Activity
must be
done on Activity Cost Pools
each unit Cost
produced. Pools
Product-
Unit Batch Sustaining Facility
Level Level Level Level
Receiving/Inspection
cost pool $200,000
Material-Handling
cost pool $600,000
Quality-Assurance
cost pool $421,000
Packaging/Shipping
cost pool $250,000
Learning
Objective
4
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
STAGE ONE
Various overhead
Maintenance Lubrication
costs related
to machinery Depreciation Electricity
Activity
cost Machinery Cost Pool
pool Total budgeted cost = $1,212,600
STAGE TWO
Calculate Budgeted Machinery Costs = $1,212,600
the pool Budgeted Machine Hours 43,000
rate = $28.20/hour
Assignment
Mode III:
$28.20 per hr.
2 hr. per unit
$56.40 per unit
STAGE ONE
Total budgeted setup cost
Calculation of $20 per hour
total setup cost 10 hr. per setup
$200 cost per setup
15 production runs
$ 3,000 Total
Activity
cost Setup Cost Pool
pool Total budgeted cost = $3,000
STAGE TWO
Calculate Budgeted Setup Costs = $3,000
the pool Planned Production Runs 15 runs
rate = $200 per run
Activity
cost Engineering Cost Pool
pool Total budgeted cost = $700,000
STAGE TWO
Allocate based Engineering Cost Pool
on engineering Total budgeted cost = $700,000
transactions
Activity
cost Facility Cost Pool
pool Total budgeted cost = $507,400
Exh.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
Distorted Product Costs
Both original and ABC target selling prices are
based on (Cost × 125%).
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
Cost Drivers
A characteristic of an event or activity that results
in the incurrence of costs.
Cost Drivers
A characteristic of an event or activity that results
in the incurrence of costs. In selecting a cost
driver, we must consider . . .
Degree of
Correlation
Cost Drivers
A characteristic of an event or activity that results
in the incurrence of costs. In selecting a cost
driver, we must consider . . .
Degree of
Correlation
Cost of
Measurement
Cost Drivers
A characteristic of an event or activity that results
in the incurrence of costs. In selecting a cost
driver, we must consider . . .
Degree of Behavioral
Correlation Effects
Cost of
Measurement
Learning
Objective
7
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
Interviewing and Paper Trails
The information for ABC systems initially comes
from interviews with employees in the support
departments and a review of each department’s
records.
Storyboarding
A procedure used to develop a detailed
process flow chart, which visually represents
activities and the relationships among
activities.
Step These are the steps we
1 follow to build a
Step
memory board.
2
Step
3
Step
4
Direct versus Indirect Costs
Volume-Based Costing Activity-Based Costing
All production costs An effort is made to
except direct account for as many
materials and direct costs as possible as
labor are lumped direct costs of
together in one production.
overhead cost pool.
Indirect
Costs
Indicators of Need for ABC
Direct labor is a Product-line profit
small percentage margins are hard
of total costs to explain
Cost of
inferior
decisions
resulting Design, implementation
from and maintenance costs
inaccurate
information.
Information
Low
System
Low High Accuracy
Optimal
system
Learning
Objective
8
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved.
ABC in the Service Industry
Objectives
End of Chapter 5
This is
my kind of cost
pool!