You are on page 1of 11

GLAM RESIDENCES SHOWROOM

FIT-OUT WORKS
Interior Zone, SM North EDSA, Quezon City

PROGRESS REPORT
March 06 – July 2, 2019
Prepared by:

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
I. Project Information
GRIDLINES MGS CONSTRUCTION &
PROJECT MANAGEMENT INC.
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Page 2
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
PROJECT DESCRIPTION PROJECT LOCATION
Owner SM Development Corporation
Gridlines MGS Construction & Project Management, Inc.
Construction Manager
(GMCPMI)
Glam Residences Showroom
Architect-On-Record
Structural Consultant
Mechanical Consultant
Electrical Consultant
Plumbing/ Sanitary
Consultant
Fire Protection Consultant
Interior Design MCONCEPT
Landscape Design
Contractor SCHEMATICS Construction Development Corporation
Lot Area 133 sq.m
3 (Reception / Sales Area = 1, 1-Bedroom with Balcony Model
TOTAL No. of Space
Unit =1, 1-Bedroom Model Unit = 1)
TOTAL No. Retail Units
TOTAL No. Parking Slots
Project Location & Description | Weekly Report

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 3
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
II. Progress Photos
GRIDLINES MGS CONSTRUCTION &
PROJECT MANAGEMENT INC.

Page 4
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
Sales Area

As of July 2,
2019

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 5
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
Upgraded Model
Unit with Balcony

As of July 02,
2019

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 6
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
Upgraded Model
Unit

As of July 2,
2019

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 7
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
As of July 2,
2019

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 8
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
III. Deliverable Status
GRIDLINES MGS CONSTRUCTION &
PROJECT MANAGEMENT INC.

Page 9
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph
ITEM DESCRIPTION QUANTITY SUPPLIER / CONTRACTOR REMARKS
I. Supply and Delivery of Custom Furniture
1.0 Sales Area A - 3-Sea ter Sofa (Cus tom) 1 pc N/A Ca ncel l ed due to revi s i on on des i gn by MCONCEPT
2.0 Sales Area B - Coffee Ta bl e (Cus tom) 1 pc N/A Ca ncel l ed due to revi s i on on des i gn by MCONCEPT
3.0 Sales Area C - Arm Cha i r (Cus tom) 2 pc N/A Ca ncel l ed due to revi s i on on des i gn by MCONCEPT
4.0 Sales Area D - Di s cus s i on Ta bl e (Cus tom) 2 pc Ra l oha Furni ture Des i gns a nd Ma nufa cturi ng Corp. Already at Site
5.0 Sales Area E - Di s cus s i on Cha i r (Cus tom) 8 pc Infi ni te Qua l i ty Des i gns Center, Inc. Infinite to finish punchlisting
6.0 Sales Area F - Offi ce Cha i r (for Purcha s e) 1 pc Ca s a mi a Furni ture Center Inc. Already at Site
7.0 Sales Area G - Ba r Stool (Cus tom) 5 pc Infi ni te Qua l i ty Des i gns Center, Inc. Infinite to finish punchlisting
8.0 One Bedroom with Balcony A - Ottoma n (Cus tom) 2 pc Ra l oha Furni ture Des i gns a nd Ma nufa cturi ng Corp. Already at Site
9.0 One Bedroom with Balcony B - Di ni ng Ta bl e (Cus tom) 1 pc ABC Furni ture Li ne Already at Site
10.0 One Bedroom with Balcony C - Lounge Sofa (Cus tom) 1 pc Ra l oha Furni ture Des i gns a nd Ma nufa cturi ng Corp. Already at Site
11.0 One Bedroom with Balcony D - Si de Ta bl e (Cus tom) 2 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
12.0 One Bedroom with Balcony E - Queen Si ze Bed (Refurbi s hi ng / Reuphol s ter Onl y) 1 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
13.0 One Bedroom A - Di nni ng Cha i r (Cus tom) 2 pc Infi ni te Qua l i ty Des i gns Center, Inc. Infinite to finish punchlisting
14.0 One Bedroom B - Di ni ng Ta bl e (Cus tom) 1 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
15.0 One Bedroom C - Lounge Sofa (Cus tom) 1 pc Infi ni te Qua l i ty Des i gns Center, Inc.
16.0 One Bedroom D - Si de Ta bl e 1 (Cus tom) 1 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
17.0 One Bedroom E - Ottoma n (Cus tom) 1 pc Infi ni te Qua l i ty Des i gns Center, Inc.
18.0 One Bedroom F - Si de Ta bl e 2 (Cus tom) 1 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
19.0 One Bedroom G - Queen Si ze Bed (Refurbi s hi ng / Reuphol s ter Onl y) w/ Pa dded Hea dboa rd (Cus tom) 1 pc Acqui s i ti ons Indus tri a l Corpora ti on Already at Site
Ca ncel l ed, revi s ed hea dboa rd deta i l s provi ded by
20.0 One Bedroom H - Pa dded Hea dboa rd (Cus tom) 1 pc N/A MCONCEPT no need for ful l hei ght. To be provi ded
by Acqui s i ti ons under i tem 19.0
II. Supply and Delivery of Furniture
21.0 Sales Area 2-Sea ter Sofa (GYPSY from Our Home) 1 pc Already at site
22.0 Sales Area Coffee Ta bl e (EGYPT from Décor) 1 pc Already at site
23.0 Sales Area Si de Ta bl e (EGYPT from Décor) 1 pc Already at site
III. Supply and Install of CCTV and Structured Cabling System
24.0 General Areas CCTV a nd Structured Ca bl i ng 1 lot Phi l i ppi ne Gl oba l Communi ca ti ons Incorpora ted Done
IV. Supply and Delivery of Special Lighting Fixtures
25.0 Sales Area A - Decora ti ve Li ghts - Ova ti on by DÉCOR MANILA 2 pc Already at site
26.0 Sales Area B - Decora ti ve Li ghts - Ba l l er by Décor MANILA 2 pc Already at site
27.0 One Bedroom with Balcony C - Decora ti ve Li ghts - Luna r by LUCENDI 2 pc Already at site
28.0 One Bedroom with Balcony D - Decora ti ve Li ghts - Euro Fa s s e 170mm H by LUMINA CONCEPTS 1pc Already at site
29.0 One Bedroom with Balcony E - Decora ti ve Li ghts - Euro Fa s s e 1300mm H by LUMINA CONCEPTS 1 pc Already at site
V. Supply and Delivery of Toilet and Kitchen Plumbing Fixtures
30.0 Both on Upgraded Units A - Wa ter Cl os et by HCG 2 pc Hocheng Phi l i ppi nes Corpora ti on Installed
31.0 Both on Upgraded Units B - Wa s h Ba s i n by HCG 2 pc Installed
32.0 Both on Upgraded Units C - Shower Set by HCG 2 pc Hocheng Phi l i ppi nes Corpora ti on Installed
33.0 Both on Upgraded Units D - Ba throom Fa ucet by HCG 2 pc Hocheng Phi l i ppi nes Corpora ti on Installed
34.0 Both on Upgraded Units E - Ki tchen Si nk by Lexton - Undermount Si ngl e Bowl 2 pc Installed
35.0 Both on Upgraded Units F - Ki tchen Fa ucet by HCG 2 pc Installed
VI. Supply and Delivery of Fabrics
36.0 Sales Area Fa bri c, NAVY, ST MORITZ by Spectrum 40 yd Spectrum by La rrys Already at Site
37.0 1BR w/ Bal A - Ottoman & 1BR G - Queen Size Bed Fa bri c, CEMENT, GENOVA by Spectrum 17 yd Spectrum by La rrys Already at Site
38.0 1BR w/ Bal C - Lounge Sofa & E - Queen Bed Fa bri c, BUTTERSCOTCH, GENOVA by Spectrum 27 yd Spectrum by La rrys Already at Site
39.0 1BR C - Lounge Sofa & E - Ottoman Fa bri c, TORQUOISE, GENOVA by Spectrum 26 yd Spectrum by La rrys Already at Site
40.0 1BR A - Dining Fa bri c, SAND, OUTLANDER by Townes 3 yd Townes Mercha ndi s i ng Inc. Already at Site
41.0 Sales Area Fa bri c, STUCCO, ST MORITZ by Spectrum 12.5 yd Spectrum by La rrys Already at Site
VII. Supply and Delivery of Loose Accessories (BY MCONCEPT)
42.0 General Areas 1 lot Awating releasing documents by SMCA
VIII. Supply and Delivery of Artworks (BY MCONCEPT)
43.0 General Areas 1 pc Already at Site
IX. Supply and Delivery of Special Lighting and Furnitures (BY MCONCEPT - Décor Manila, Lumina, Lucendi Brands)
44.0 General Areas 1 lot Already at Site
X. Other Deliverables
45.0 Punchlist by MCONCEPT Punchl i s t upda ted l a s t June 17, 2019 Schema ti cs Cons tructi on a nd Devel opment Corp. Rectified, for inspection by MCONCEPT
46.0 Punchlist by SCMC Ma nhol e cover rel oca ti on on bothe Upgra ded Uni ts Schema ti cs Cons tructi on a nd Devel opment Corp. Rectified, for inspection by MCONCEPT
47.0 Punchlist by SCMC Si gna ge s wi tch on a l l ey porta l Schema ti cs Cons tructi on a nd Devel opment Corp. Installed
Schema ti cs Cons tructi on a nd Devel opment Corp. /
48.0 Punchlist by SCMC Smoke Detector Devi ces Ins ta l l a ti on a nd Synchroni za ti on 8 pc Ma l l Engi neeri ng Installed
49.0 Requirements by GMCPMI As -bui l t Dra wi ng Schema ti cs Cons tructi on a nd Devel opment Corp. Architectural done, electrical on going
50.0 Requirements by SCMC Permi ts Schema ti cs Cons tructi on a nd Devel opment Corp. On going
Repaired temporarily, awaiting SCMC official
51.0 Maintenance Ai rcon l ea k repa i r 1 pc ACRE
repair schedule
Remaining punchlist from IQDCI, IQDCI to
52.0 Requirements by GMCPMI Punchl i s t of a l l Cus tom Furni tures MCONCEPT complete deliverable
53.0 Requirements by SCMC Copy of CGL a nd Fi re Ins ura nce for the Showroom GMCPMI Done
GRIDLINES MGS CONSTRUCTION &
PROJECT MANAGEMENT INC.
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph 10
- END -

GRIDLINES MGS CONSTRUCTION &


PROJECT MANAGEMENT INC.

Page 11
#2 Mustang Street, Village East Executive Homes, Cainta, Rizal
Tel No.: +63 (2) 470 6494  www.gridlinesmgs.com.ph

You might also like