PERFORMANCE
LPH 1
Condensate T - 61.05 T - 47.18 Condensate
to GC 2 F - 480106 F - 480106 from GC 1
T-100.86, F-480106
LPH 2
Condensate T - 101.52 T - 68.10 Condensate
to LPH 3 F - 555281 F - 480106 from GC 2
T - 105.78 Drain to
Drip Pump F - 75175 Condensate line
(hd2)
480106(100.86-68.10)*100
Effy of LPH 2 = 25369(678.41-105.78)+49806(130.26-105.78) = 99.8%
LPH 3 Condensate
Condensate T - 125.27 T - 101.52
from LPH2 &
to LPH 4 F - 555281 F - 555281
Drip Pump
T - 130.26
Drain to LPH 2
F - 49806 (hd3)
F- Flow in Kg/Hr
555281(125.27-101.52)*100
Effy of LPH 3 = 21033(715.68-130.26)+28773(161.73-130.26) = 99.8%
LPH 4
Condensate T - 156.52 T - 125.27 Condensate
to Deairator F - 555281 F - 555281 from LPH3
T - 161.73
Drain to LPH 3
F - 28773 (hd4)
F- Flow in Kg/Hr
555281(156.52-125.27)*100
Effy of LPH 4 = 23838(762.69-161.73)+4395(782.31-161.73) = 99.7%
T - 166.71
to HPH5 F - 652000
(555281(166.71-156.52)+4830(820.28-659.83))*100
Deaerator Effy =2300(820.28-166.71)+93256(181.51-166.71)+5984(802.92-166.71)= 96.8%
T=173.12 T=166.71
Flow= 652000
HPH 5
Feed Water T - 189.69 T - 173.12 Feed water
to HPH 6 F - 652000 F - 652000 from BFP
Discharge
T - 181.51
Drain to Deaeator (hd5)
F - 93256
652000(189.69-173.12)*100
Effy of HPH 5 = 16640(802.92-181.51)+76616(198.05-181.51) = 93.7%
HPH 6
Feed Water T – 228.80 T – 189.69 Feed water
to HPH 7 F - 652000 F - 652000 from HPH 5
652000(228.80-189.69)*100
Effy of HPH 6 =
40391(732.99-198.05)+31844(238.65-198.05)+9381(806.50-198.05)
= 99.7%
Feed Water to
Economiser T – 253.94 HPH 7
T – 228.80 Feed water
F - 652000 F - 652000 from HPH 6
T – 238.65
Drain to HPH 6 (hd7)
F - 31844
652000(253.94-228.80)*100
Effy of HPH 7 = 31844(755.97-238.65)
= 99.5%
652000(819.94-253.94)+566369(845.83-732.99)
Heat Rate =
211902
3. R& M CO-ORDINATION