Project Experience

Seoul Metro and Korail


Contents
• Seoul Metro: Conventional Design
• Cost Quotation Sample (no values include
d)
• Project Experience: Seoul Metro &Korail
Product/Design Proposa
l
Seoul Metro: Conventional Design

Heigh
Transparent PMMA Panel TL: 30db t

Width

Design Specifications
1 SPAN (W:2m X H:4.5m) = 2*A + 4*B + 1*C

A. Transparent PMMA Panel 1960 x 1000 x 95T


B. Gallery Panel 1960 x 500 x 95T
Gallery Panel NRC : 0.8 ~ 0.9 C. Noise barrier support: 4.5 meter
Design Styles : Combinable Pan
els
Shinsung Control’s noise barrier panels types are combinable to create various designs to suit various
conditions. Panel sizes are uniform and stack and lock on top of each other for durability and minimal
sound leakage.

Absorptive &
Transparent
Transparent
Only Absorptive
Only
Cost Quotatio
n
Panel Types & Pricing

Panel Type CIF Pricing to Panel Type CIF Pricing to

Gallery Type Panel No Color : Punching Type Panel No Color :

Color : Color :

NRC: 0.75 NRC: 0.8

PMMA/PC Panel PMMA : Ribbed Shell Panel No Color :

PC : Color :

TL 30db NRC: 0.83

•Absorptive panels are inclusive of 32K Polyester absorbing material to


achieve the average indicated NRC values. All
Sample Pricing for 1 Span with Combinatio
n
2 meters
CIF pricing for 1 Span
Product Quantity Total
Price
PMMA Transparent 2
Panel
Gallery Type Panel 4
(no color)
4.5 meters

Noise Barrier Support 4.5 m

Total

•All necessary fasteners and accessories required


for installation of panels are inclusive in the price
of the noise barrier support. Typical Seoul Metro Design
Client: Korea Railway Network Authority
Project: Kyunbu Highspeed Railway
Section
Date: October 29, 2012
Amount: 745,114,590 KRW
Item: Highway Speed Noise Barrier
(CEN10)
Client: Korea Railway Network Authority
Project: Kyunbu Line (Jinwee-Songtan)
Date: October 29, 2012
Amount: 745,114,590 KRW
Item: Highway Speed Noise Barrier
(CEN10)
Client: Land and Housing Authority
Project:
Date: April 20, 2014
Amount: 390,997,800 KRW
Item: Absorptive Noise Barrier
Client: Seoul Metro
Project: Line 2, Shindorim-Daerim
Date: May 26, 2014
Amount: 1,092,094,080 KRW
Item: Absorptive Noise Barrier
Client: Korea Railway Network Authority
Project: Kyunbu Line (Cheonan-Sojungri)
Date: April 3, 2015
Amount: 130,031,820 KRW
Item: Absorptive Noise Barrier
Client: Korea Railway Network Authority
Project: Deagu Line (Dongdeagu-
Youngchon)
Date: April 27, 2015
Amount: 87,472,200 KRW
Item: Absorptive Noise Barrier
Client: JAO
Project: Line 1 Daerim-Shindorim
Date: August 22, 2014
Amount: 1,463,000,00 KRW
Item: Beams
Client: KSOL
Project: Line 1 Daerim-Shindorim
Date: October 13, 2014
Amount: 955,789,040 KRW
Item: Absorptive Noise Barrier