CFT comprises of
1. CME – Lead role
2. Design (Respective System in charge)
3. CDMM (Respective System STA)
4. STYLING
Input part tolerances in parametric Supplier Feedback for the Optimize the Revise PLP /
excel sheet / 3D model Part level Tolerances and Tolerance after Assembly Process
Checking Fixture Concept discussion with
as per PLP Definition Supplier
2nd 1st
Compare
result with
target If all iterations not yielded targeted Visualize the
If not within 3rd tolerances, then Back to Styling team for
If styling not Gap/Flush in
agreeing for proto vehicle
If within Target limit changing the Nominal values / Tolerance & Plan for Tool
change of
Target limit For Example: 4.0 ± 0.7 4.5 ± 1.0 tolerance or correction
(CDMM)
Finalize the Gap and Panel level nominal value
tolerances after Styling team review
Process
Optimization
Part Level Tolerances and Checking
Fixture Concept CFT Sign off Sign off by STA, Design & CME Tolerance
Optimization
Part level Checking Fixture measuring Styling
methodology at Supplier end
Review
3
Benchmarking & S101 Nominal Gap
& Flush Target Setting
- Minimum Gap - Maximum Gap
Rear Door Front Door Rear Door Rear Door Front Door Front Door
to Side to Fender to Front to Front to Side to Side
Outer Door Door Panel Panel
(below ( above ( above ( below
OEM Models Remark
waist line ) waist line) waist line) waist line )
Maruti Wagon R 4.5 4.5 4.5 4.5 4.5 5.5 Full Door
Chevrolet
GM 4 4 4 4 4 6
Beats
S101
Mahindra 3.5 3.5 3.5 4 4.5 4.5 Sash Door
Proposed
4
BIW Panels PLP Scheme
5
Definition of Datum scheme for
Exterior parts
X Z
X
X X Z X
Y X
X X
Y Y
Y
Y X
Y X Y
Y
X
X
X X
X
X
6
Process Flow definition
7
Hanging scheme definition
8
BIW Product Design Feedback
for process feasibility
9
General BIW Process and Panel
Tolerance Aggrement
10
Exterior part Supplier feedback for
considered Tolerance
11
Stack Up Analysis for each gap and flush
( with general agreed tolernaces )
12
If Calculated Tol. < Targeted Tol.
Go for Styling Review
13
If Calculated Tol. > Targeted Tol.
Step 1- Process Change / Datum
Change / Design Changes
14
If Calculated Tol. > Targeted Tol.
Optimizing tolerances after discussing
with supplier
15
Styling Review
If Calculated Tol. < Targeted Tol.
16
Styling Review
If Calculated Tol. > Targeted Tol.
On the basis of the Team confidence with fine tuning ,irrespective of the
calculated Tolerance is more than the targeted tolerance
( up to 10-20 % ) and targeted tolerance confirmed by styling, still the
Gap status can be made yellow and will continue with the same
Targeted Tolerance 17
Styling Review
If Calculated Tol. > Targeted Tol.
18
Tolerance change - Example
19
Nominal Change - Example
20
Checking Fixture Concept and
Tolerance Sign off
- After all the Gap and Flush status made Green / Yellow , CFT will do the
Part/ Panel Level Tolerance sign off and Global Checking Fixture Strategy
- Signed of Panel Level Tolerances will be implemented in Design Data.
21
22