Construction of Bridge
Preparation for the construction of Access Road, Drainage with walkway and Retaining Wall for
Access Road
OTHER MATTERS
EARTHWORKS: ₱537,000.00
ROADWORKS: ₱3,918,976.80
SIDEWALK ₱234,000.00
₱0.00
EARTHWORKS: ₱133,742.00
RCP ₱595,950.00
OUTFALL ₱8,500.00
EARTHWORKS: ₱45,275.00
Time:
Maragondon River (Upstream) Time: 10:30AM Maragondon River (Downstream) 9:05AM
239.98 MLD
Time:
Maragondon River (Upstream) Time: 10:50AM Maragondon River (Downstream) 8:45AM
238.63 MLD
RIVER FLOW TEST RIVER FLOW TEST
Time:
Maragondon River (Upstream) Time: 4:05PM Maragondon River (Downstream) 3:10PM
Cumulati
Cumulative ve
Distance Depth 1 Depth 2 A (m²) V (m/s) Q Distance Depth 1 Depth 2 A (m²) V (m/s) Q
Distance (m) Distance
(m)
2.7 1 0.17 0.42 0.295 0.3 0.0885 2.7 1 1.57 1.85 1.71 0 0
3.7 1 0.42 0.67 0.545 0.2 0.109 3.7 1 1.85 1.22 1.535 0 0
4.7 1 0.67 0.7 0.685 0.4 0.274 4.7 1 1.22 2.6 1.91 0.1 0.191
5.7 1 0.7 0.67 0.685 0.3 0.2055 5.7 1 2.6 2.63 2.615 0 0
6.7 1 0.67 0.59 0.63 0.1 0.063 6.7 1 2.63 2.6 2.615 0 0
Upstream 0 0 -1.50
1 20 -1.55
RIVER PROFILE
2 40 -4.20
DIST (m)
3 60 -8.50
0.00
Bridge 4 67 -10.10 0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320
5 87 -8.30 -2.00
6 107 -5.70
-4.00
7 127 -3.40
DEPTH (m)
-6.00
8 147 -3.80
10 187 -3.95
-10.00
11 207 -3.20
-12.00
12 227 -3.50
13 247 -2.60
14 267 -2.20
Inclam
UES
Ion Exchange
Rehabilitation of MWD pipeline that will be
affected by DPWH Road widening.