ORGANISASI INDUSTRI
GALANGAN KAPAL
Negosiate contract
Finalise detailed Finalise building
design design
Start construction
Monitor cost Monitor work Monitor materials
against estimate against plan delivery against plan
Complete ship
Steel treatment
Production
Lofting
Steel preparation and drawing
P.P.C
Sub-assembly
Production
Engineering
Block assembly
Erection
Quality control
Launching
Erection/ Berth
Trades
• Loftman, blaster, painter, burner, welder, labourer, crane
operator, machinist, electrician, carpenter, insulator and AC
equipment mechanics, pipe fitter, joiner, etc.
Where:
Qt = physical output rate
Lt = rate of use of labour at time t
Et = the efficiency effects of changes
to require output
Kt = rate of use of capital at time t
Et = the effects of :
- incomplete or missing plan
- disruption of worker or support service
- worker morale
Ya = a / X b
Where:
Ya = the average cost of X unit produced
X = number of identical unit
a = the cost of first unit produced
b = an exponent that varies with the
complexity of the ship