Training Syllabus
• Foresight Introduction
• SSV Work Flow
• User Privilege
• WO Assignment
• Upload DT Route
• DT NV Script
• Foresight Option and Menu
• QSSV Report
• Full SSV Report

• Net Velocity Drive Testing


• UE System Minimum
• Unlock Bootloader
• Net Velocity Installer
• DT Method and Script
• Upload logfile
• DT Tip and Trick

• Net Velocity Analysis


• System Requirement
• Calculate DT KPI, Show Event and Defined re-DT Route
• Select logfile and upload manually

2
QSSV WORK FLOW

QSSV work flow on foresight :


1. Create route
2. Submission route
3. Assigment DT QSSV
4. Perform DT QSSV
5. Review QSSV report online
6. Approval QSSV report

3
FSSV WORK FLOW

FSSV work flow on foresight :


1. Perform DT FSSV
2. Review FSSV report online
3. Approval FSSV report

4
User Previlege

• Field Engineer (Drivetest)


1. Drivetest using Netvelocity

• Project Manager Vendor role :


1. Create and submit route
2. Assign work order to field engineer
3. Review QSSV and FSSV report
4. Download QSSV and FSSV report

• NV admin
1. Create work order
2. Assign work order
3. Analisyst Post processing drivetest
4. Verify report RF manager

5
Work Order Assigment

• Log in on web foresight as Vendor Project Manager (https://foresight.smartfren.com/)

6
Work Order Assigment

• Klik Option and choose Work Order

7
Work Order Assigment

• Look on “New” Menu


• Choose work order, for example klik (WO-SFSSVQUICK-242019-ZJKT_4079-2300-2)

8
Work Order Assigment

• Choose action and klik create route

9
Work Order Assigment

• Klik menu upload

10
Work Order Assigment

• Find route.KML on computer drive and klik Open

11
Work Order Assigment

• Klik save

12
Work Order Assigment

• After route show, klik save

13
Work Order Assigment

• Input Route name, for example “create route test” and save

14
Work Order Assigment

• Klik on route name “create route test” and then submit

15
Work Order Assigment

• Now the work order is pending, waiting approval RF Optimization Manager

16
Work Order Assigment

• After DT route aleady approve by RF Optimization vendor, so PM vendor assign to field engineer

17
Work Order Assigment

• Choose field engineer who will assign for Drivetest, and the klik assign

18
Work Order Assigment

• If DT complete and logfile already upload and generate to server, PM vendor have 3 menu, view
report for review Report, Approve and reject Report if found KPI failed

19
Work Order Assigment

• If RF Optimization manager approve, Work order status complete

20
Foresight Menu and option

• Menu Work order is list of task new work oder, on going and complete

21
Foresight Menu and option

• New task is work order that need to assign to field engineer

22
Foresight Menu and option

• In progress is mean, the work order un complete SSV, example : on going drivetest or waiting
approval report from RF optimization manager

23
Create Work Order

• Log in as NV admin

24
Create Work Order

• Choose netvelocity

25
Create Work Order

• Klik add work order icon

26
Create Work Order

• Assign to users and clik SSVT

27
Create Work Order

• Please fill work order name, description, Remark and Test schedule and then click next

28
Create Work Order

• For example site ZJKT_4079 data select as below :


 Network region : Jabodetabek
 City : Jakarta
 Kabupaten : Kota Tangerang Selatan
 Kecamatan : Serpong Kota Tangerang
 Site : ZJKT_4079
 Band : FDD5

29
Create Work Order

• Select to user who will to assign, and next

30
Create Work Order

• Klik on user field engineer and click route name and the next

31
Create Work Order

• Please select script which to do the test and klik add

32
Create Work Order

• Set RSRP threshold, PCI and loop and click Next

33
Create Work Order

• And the last step is click assign

34
Net Velocity Drive Testing

35
Net Velocity Drive Testing
• UE System Minimum

- Chipshet Qualcom, Snapdragon.


- Platform Android higher than 4.1 (KitKat)

• Xiaomi Root Processing


- For Xiaomi Phone, need sign up account. And active at least 3 days.
- Than request Unlock Bootloader ( usually Xiaomi will give 168 Hours)
- Install Custom recovery TWRP
- Root UE

36
Net Velocity Drive Testing
• Net Velocity Installer

- Net Velocity application : Version 1.53.9_Engg


- NV Drive application Link: Drive – Version 1.2.7

37
Net Velocity Drive Testing
• Net Velocity Installer
- After all driver install, “ Campaign “ menu and “ Account ”would not appear yet.
1. tab “ More “
2. tab “ Help & Feedback ”

38
Net Velocity Drive Testing
• Net Velocity Installer
3. tab “ About “

39
Net Velocity Drive Testing
• Net Velocity Installer
3. Tab “ About “
4. Tab continuously on “ About “ screen, until “ Campaign Credentials already Visible “
show up.
5. before that will show “ 2 step “ than “ 1 step “.

40
Net Velocity Drive Testing
• Net Velocity Installer
6. Login account.

41
Net Velocity Drive Testing
• Lock Band
1. Before do Drive test choose which band will be test.
2. Lock Band (band 5 FDD / Band 40 TDD)
3. Tab icon “ + ”
4. Tab “ Force lock/Unlock activity ”
5. Tab “ LTE Band Lock “
6. Select band which will be test
7. Restart UE, then check symbol Lock at Band Information

42
Net Velocity Drive Testing
• DT Method and Script
1. Start drive test tab “Campaign”
2. Select “ Drive ” for do Drive Test
3. Tab “ Start “ icon
4. Select “ Work Order Drive “

43
Net Velocity Drive Testing
• DT Method and Script
5. After select the site Work Order, select “ SSVT “ for SSV
6. Choose which methode will test, “ RRC, DL, VolTE or Static test “
7. Route will be load after tab Drive test methode.
8. We can start test by tab “ Start “ icon.
9. For VoLTE test, save phone number target first at “ contact “ (+62…).

44
Net Velocity Drive Testing
• DT Method and Script
10. For Swap Logfile, tab “ Stop “ select Yes.
11. Than choose upload to server or not.
12. If want to continue test tab back and tab the script again.

45
Net Velocity Analysis
Login Page

Login with valid user credential


Home Page of Foresight

Click on Grid
menu on top
right corner
Grid Menu icon to Open Netvelocity Module

Click On
NetVelocity
Option
Search Particular Work Order

Enter executed
Work order id
and click on
search icon.
Open Netvelocity visualization

Double click on Work Order row to see


drive path of the particular work order id
Default view of Drive Post Processing

Drive path
showing on
map of
particular drive.

Show or Hide KPI


/ Event Option to
display KPI and
Event values

Recipe and Operator details showing Event Details showing with captured
below workorder name time
Chart View

Click on Dropdown menu under chart


Click on Chart View, By default RSRP option to display SINR, DL Throughput,
chart will open UL Throughput graph
Serving cell connectivity of drive point

Foresight show Serving cell connectivity with serving cell KPI details with
click on any drive bin point on map.
Play Drive

Click on
Play to start
Drive
Pause Drive

Click on Pause
icon to pause
drive.
Stop Drive

Click on Stop
Click on
icon to Stop
Advance
drive.
Mode
Default Advance View

By default RSRP
Map, Table and
Chart show after
open Advance
View
Serving cell KPI details

Foresight show Neighbour cell


connectivity Line when click on any drive
bin point on map.

Foresight show serving cell connectivity Line


Foresight show serving cell KPI details when click on when click on any drive bin point on map.
any drive bin point on map.
Neighbour cell KPI details

Foresight show Neighbour cell KPI details when click


on any drive bin point on map.
Plot RF Predictive Coverage
Click on Coverage Plot icon to plot RF
Predictive Coverage of RSRP, SINR, DL
and UL Throughput
Draw KPI on Map, Table, Chart and Line Graph

Click on any
particular KPI to
add KPI on Map,
Table, Chart and
Line Graph
Draw Event on Map, Table, Chart and Line Graph

Click on Event
menu to show
Captured Event list
Draw Event on Map, Table, Chart and Line Graph

Click on Event
menu to show
Captured Event list

Click on any
particular Event to
add Event on
Map, Table and
Graph
MOS

Click on any
particular Event to
add Event on
Map, Table and
Graph
MOS with Call Event

Click on Call
Event to add
Event on Map,
Table and
Graph and Line
Chart Call
Event should
plot on MOS
Plot.
Serving KPI plot for particular PCI

Under
operator
Serving and
Neighbour
List should
show.
Serving KPI plot for particular PCI
Clicking on
"Serving" option,
list of serving KPI
should show.
After clicking on
particular
Under serving KPI, List
‘Serving’ of serving PCI
option List of should show
with kebab
serving KPI menu icon. By
should show. Clicking on
particular PCI,
Particular KPI
should plot on
the map, chart,
Table and line
graph.
Neighbour KPI plot for particular PCI
Clicking on
“Neighbour Cell"
option(i.e. –
Neighbour 1),
option, list of
Neighbour KPI
should show.
Under After clicking on
‘Neighbour particular
cell ’ Neighbour KPI,
list of Neighbour
option(i.e. – KPI should show
Neighbour 1), with kebab
List of menu icon. By
Neighbour KPI Clicking on
(RSRP, SINR, particular PCI,
RSSI) should Particular
show. Neighbour KPI
should plot on
the map, chart,
Table.
Neighbour cell KPI data

Clicking on By Clicking on
the any
particular neighbour KP
"Neighbour" I (e.g. - RSRP,
list (e.g. RSRQ, RSSI,
Neighbour PCI),
1) below KPI particular
should neighbour
show. KPI should
• RSRP plot on the
• RSRQ map, chart,
• RSSI Table and line
• PCI graph.
Add and Save Presets

Click on
Presets menu
to save / open
Click on “Add preset
Current
Window to Enter Preset
Preset” to name and
Click on Save
save current
window Click on “Set
preset default for
this work
order” check
box to open
saved Preset
in default
Drive Information

Click on Drive
Info to see Drive
details
Device Information

Click on Play
icon to Start
Drive
Click on Device
Info to see Device
details
Play Drive on Advance Mode

Click on
Pause icon to
Foresight show Pause Drive
Neighbour cell
connectivity
Line during play Click on Stop
drive icon to Stop
Drive

Foresight show
serving cell
connectivity Line
during play drive.
Layer 3 Message Table

Click on Layer 3
icon to see all
layer 3
messages.
Raw details of a particular Layer 3 message

Click on any
particular Layer3
message to see
raw details of
layer 3 message

Click on cross
icon to close raw
detail of
particular Layer3
message

Click on copy
icon to copy raw
detail of
particular Layer3
message
Download Layer 3 Dump Data

Click on
Download option
to download
Dump Data of
layer 3

Click on Close to
close layer 3 table
Download / Print Chart and Graph Data

Download /
Print
option
shows on
every
added
Chart and
Graph
Download Table Data

Click on
Download option
to download
Table data
MAP KML File Download

Click on
Download option
under map to
download data
KML file

Click on SAVE
option to export
KML File
Legends and Filters

Click on
Legends
and Filters
icon to
view
particular
KPI /
Event
legends.
Draw Boundary Tool

Click on Draw
Boundary
Tool icon to
draw polygon
on map
Polygon data Filter

Created
polygon data
should filter
and
accordingly
data should
be updated
on Table,
Map and
Graph
Base Map

Click on
Base Map
icon to
change
Base Map
Upload KML/TAB File

Upload
Particular Click on
KML and Upload icon
Tab file and to upload
Click on Route KML
save to and TAB File
Upload
KML/TAB
Manage Sites, Bin/Event Size and Line Thickness

Click on
Sites icon
to open
Manage
Sites popup
Download Logfiles / CSV file
(export)
Click on
Sites icon
to open
Manage
Sites
popup

Find Work Order row, then click view on


the right side menu

© ZTE Corporation. All rights reserved


87
Download Logfiles / CSV file (export)
Click on
Sites icon to
open
Manage
Sites popup

Find Recipe row, then click on the right side menu to see
detail Recipe and to download logfiles / CSV (export)

© ZTE Corporation. All rights reserved


88
Define KPI failed

Icon event
show on
the Map

Click Event to find which KPI is failed

© ZTE Corporation. All rights reserved


89
Define KPI failed (Layer 3 Message)

Click layer
3 layer,
than
double
click event.
L3
messages
will
highlight

© ZTE Corporation. All rights reserved


90
Define re-DT route (KPI failed)

Find KPI failed events by Find and Replace, then find


Timestamp (all events were exported by column).

© ZTE Corporation. All rights reserved


91
Define re-DT route (KPI failed)

Each logfiles names contain Timestamp start-


end. Choose which logfile that have event KPI
failed (based on Timestamp) and than export
CSV files into Mapinfo (TAB)

© ZTE Corporation. All rights reserved