You are on page 1of 27

DA RFO XI UPDATE REPORT

ON THE RECENT EARTHQUAKE OCCURENCE

JOEDEL R. LELIZA
DRR ALTERNATE FOCAL/ AGRI II
DA RFO XI
Magsaysay
Bansalan
Digos City
Sta Cruz
Matanao
DA PROJECTS DAMAGED
BY RECENT EARTHQUAKES

Estimated total damaged:


P17,900,000.00
DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

MALITOPOS DAM
Recipient: Malitopos Rice
Farmers Association

Location: Brgy. Rizal Bansalan


Davao del Sur
Status: Apron at pond area, damaged
spillway, riprap for rehab, and canal
100m and 200m for new construction
Estimated Cost of Damaged:
P5,500,000.00
MALITOPOS DAM DAMAGE

Damaged Line Canal Damaged Pond Area

Damaged Spillway Damaged Riprap at Retaining Wall


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

SPRING DEVELOPMENT
Recipient: BUFAWA

Location: Brgy. Bacungan,


Magsaysay, Davao del Sur
Status: Totally damaged Intake Box,
reservoir and pipes based on LGU
validation. For validation by DA XI.
Estimated Cost of Damaged:
P650,000.00
DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

MINI COFFEE STORAGE


Recipient: Balutakay Coffee
Farmers Association
Location: Brgy. Balutakay,
Bansalan, Davao del Sur

Status: Totally damaged Column, roofbeam,


walls, flooring, ceiling and cladding. Not
safe to use and for total demolition.

Estimated Cost of Damaged:


P2,000,000.00
MINI COFFEE STORAGE DAMAGE

Damaged Column, Roof Beam and Wall


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

AGRICULTURE TRAMLINE SYSTEM

Recipient: Balutakay Coffee


Farmers Association
Location: Brgy. Balutakay,
Bansalan, Davao del Sur
Status: Visible major cracks on the
foundation of structure, not safe to
use.
Estimated Cost of Damaged:
P2,700,000.00
DAMAGE ON AGRICULTURE TRAMLIME

Major Earth Cracks on the Foundation Tower A


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

COFFEE ROASTING FACILITY

Recipient: BACOFA

Location: Brgy. Poblacion,


Bansalan, Davao del Sur
Status: Visible major cracks
oncolumn, roof beam, ceiling and
walls.
Estimated Cost of Damaged:
P1,250,000.00
DAMAGE ON COFFEE ROASTING FACILITY

Cracks on the Ceiling Cracks on Column and Roof Beam

Visible Wall Crack Cracks on Column and Roof Beam


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

SUPPLEMENTARY DAM

Recipient: Badagoy Irrigators


Association, Inc.
Location: Brgy. Poblacion,
Magsaysay, Davao del Sur
Status: Steel gate not operational due
to damaged of tower. Damaged riprap
at downstream of structure
Estimated Cost of Damaged:
P1,500,000.00
DAMAGE ON SUPPLEMENTARY DAM

Damaged Tower

Damaged Downstream Riprap


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

CANAL LINING, 12C

Recipient: Badagoy Irrigators


Association, Inc.
Location: Brgy. Murcia,
Matanao, Davao del Sur

Status: 100m canal lining totally


collapsed

Estimated Cost of Damaged:


P2,500,000.00
DAMAGE ON CANAL LINING 12C

Canal Lining Totally Collapsed


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

CANAL LINING (Dist.9)

Recipient: Badagoy Irrigators


Association, Inc.
Location: Brgy. Poblacion,
Magsaysay, Davao del Sur

Status: 50m Canal lining totally


collapsed

Estimated Cost of Damaged:


P1,250,000.00
DAMAGE ON CANAL LINING Dist.9

Canal Lining Totally Collapsed


DA PROJECTS DAMAGED BY RECENT EARTHQUAKES

NARBASA FLUME

Recipient: Badagoy Irrigators


Association, Inc.
Location: Brgy. Dalawinon,
Magsaysay, Davao del Sur
Status: Visible major cracks at least 40m
of canal flume, preventive demolition and
construction of new flume is advised

Estimated Cost of Damaged:


P1,250,000.00
DAMAGE ON NARBASA FUME

Visible Cracks
ACTIONS TAKEN
ACTIONS TAKEN
• Rehabilitation and recovery plans are
already prepared by the region
• Distribution of 572 bags special rice
(5kg/bag), 248 Bags premium rice
(5kg/bag), 27 water jugs (20L/jug) and 13
water jugs (10L/jug).
• Distribution of 40 laminated sacks and
food items.
• DA RFO XI Director Ricardo Onate Jr
spearheaded the milling and repacking of
60 sacks at 50kgs each of low-germination
seeds, in partnership with RPC-KOICA.
• Deployed teams during the conduct of
rapid damage assessment and needs
analysis (RDANA) to affected areas.
• Physical inspection of affected areas to
estimate cost of damages and losses to
agriculture
• Provision of ACPC special credit window
for displaced farmers.
• DA RFO XI in coordination with DSWD
and LGU crafting a long term livelihood
program for affected farmers.
DA RFO XI
REHABILITATION PLAN

Estimated total budget


requirement:
P10,550,000.00
REHABILITATION PLAN
PROGRAM/PROJECTS/ CONTRACT REHABILITATION NAME OF BUDGETARY
LOCATION TARGET
ACTIVITIES AMOUNT PLAN ASSOC REQUIREMENT
GRAND TOTAL
10,550,000.00
I. PRODUCTION SUPPORT
FACILITY 500,000.00
Sitio Balutakay,
Provision of
Reconstruction of Mini Brgy. Managa,
P1,844,178.29 customized 40 footer BACOFA 2 units
Storage Bansalan, Davao 500,000.00
Dry Container Van
del Sur
II. IRRIGATION NETWORK
SERVICES (INS) 10,050,000.00
Reconstruction of Malitopos
Brgy. Rizal,
Reconstruction of New check dam and Rice
No Available Data Bansalan, Davao 1 unit
Clarin Diversion Dam concreting of line Farmers 5,550,000.00
del Sur
canal Assoc
Reconstruction of
Brgy. Poblacion,
Rehabilitation of towers and BADAGOY
No Available Data Magsaysay, 1 unit
Supplementary Dam rehabilitation of steel IA, INC. 1,500,000.00
Davao del Sur
gates
Concreting of main Brgy. Murcia,
Rehabilitation of 12C Canal BADAGOY
No Available Data canal (70m) and Matanao, Davao 1 unit
Lining IA, INC. 2,000,000.00
construction of flumes del Sur
Brgy. Poblacion,
Rehabilitation of District 9 Concreting of main BADAGOY
No Available Data Magsaysay, 1 unit
Canal Lining canal IA, INC. 1,000,000.00
Davao del Sur
THANK YOU.