Yield Rate Guide

▣ Yield Rate : effectiveness of production regarding input working hour

Yield Man Hour Production Result Qty X ST


Yield rate = × 100 = × 100
Total Man Hour Total Man Number1) x Total Working Hour

1) Total Man = direct man + indirect man

▣ Yield Rate Guide

 Total Man Hour : the operator (worker) in Manufacturing Team

Explanation)
1) the exclusion man of Total man in manufacturing team : outgoing member, PM member (Maintenance), supervisor…

2) the inclusion man of Total man in the other team :


- Line inspector who has standard time work. : direct man

 divide the direct man and indirect man according to the ST (Standard Time)

1) The direct time


- The worker who has standard time work.

2) The indirect time


- The worker who doesn’t have standard time work and lead/support the direct worker.