U N D E R S TA N D I N G O F G E N E R A L S P E C I F I C A T IO N S
A N D C L A U S E S T H AT M A J O R L Y I M P A C T T H E
P R E PA R AT I O N O F D O C U M E N T S
O V E R V IE W O F
GENERAL
S P E C IF IC A T IO N S
Part 2- Employer’s Requirements, VI-1
Broad
Description of Item 2
Major Structural
Elements Other Items
Scope Structures
Meteorological
Information Topographical
Hydrological Information Information
- Temperature Geological Information
- Name, location and flow - Type of Terrain
- Rainfall pattern of Rivers, Stream - Geo Investigation Report
etc. Viz. Coastal areas, plain
- Wind
areas, hilly areas etc.
- Humidity
03000- Information & Communication Management
Document Control Procedure, Contractor’s Submission Procedure, Engineer’s Response, Project Management Information
System etc.
28 Days after issue of LOA Contractor shall submit first digital video with commentary about the progress of the works.
Similarly, before the issue of Taking Over Certificate Contractor shall submit 60 minutes digital audio-video presentation for
the whole works. Also, photographs shall be taken on regular basis and submitted in MPR by the Contractor.
Building Information Modelling, CAD resource libraries, File naming & Conventions, CAD Quality Management etc.
04000- Works Administration
Works • Project’s Plan
Management • Interface Management Plan & Works Quality Management Plan
• Design/Procurement & Manufacturing Plans etc.
Planning
• Kick Off Meetings
Meetings • Regular Meetings
• Monthly Progress Meeting, Co-ordination Meetings etc.
• Contractors shall provide & maintain Site Offices for the use of
Employer’s/Engineer’s personnel.
Facilities • Specifications for sub site offices, site huts shall be provided
Supply of Spare • Specification for list of Spare parts, Consumables, Special tools and
test equipment’s supplied by Contractor for operation of plant, MEP
Parts, Special Tools services etc. shall be provided.
etc.
• Static Inspection (Phase 2)
Test after • Dynamic Inspection (integrated inspection)
completion • CRS Inspection
Shop
Inception Design & Drawings & Contractor’s
Shop
Drawings &
Report
Drawings Co-ordination Drawing Drawings Co-ordination
Drawings Drawings
As-Built As-Built
Records and Records and
Documents Documents
Packaging,
Damage and Hydrological Roads, Vehicle,
Storage, Shipping
Interference Survey Utilities etc. & Delivery
07000- Quality Administration
• Specification for plant, materials and
workmanship shall be provided
SQMP
• Contractor’s Submissions Relating to Approval
1 for Plant and Materials
• First aid kit, disinfectant, nurses etc. shall be provided in accordance with
SHE Facilities and Gujarat & Maharashtra latest BOCW act.
Equipment • PPE/Safety gears etc. shall be provided by Contractor.
• Contractor shall hire and provide facilities for staff and labour as per the
specifications
Staff & Labour • Claims on account of violation of labour laws
• Contractor must comply with JICA’s guidelines for environment and social
consideration, 2010
Environment • Contractor shall provide, implement and monitor CEMP.
• Contractor shall resolve claim raised due to dispute through GRM set by
Publicity & Public the Employer
Relations • Contractor shall set up 24 hr hotline to provide enquiry services to public