4.8 m
1.25 m
Live load = 184.73
SIDL = 13.52
0.15 m 0.15 m
0.75 m Height of Ballast wall
0.15 0.15
0.22
Output Data
Reaction on Girder Ra
Due to dead load of slab = 15.25 KN
Due to SIDL = 30.42 KN
Due to live load = 100.4 KN
This load will be applied as a point load with 100 mm eccentricity from the center line of Girder
4.9 m
1.275 m
Live load = 155.7
SIDL = 13.52
0.15 m 0.15 m
0.75 m Height of Ballast wall
0.15
0.32
Output Data
Reaction on Girder Ra
Due to dead load of slab = 26.867 KN
Due to SIDL = 45.16 KN
Due to live load = 93.12 KN
This load will be applied as a point load with 100 mm eccentricity from the center line of Girder
0.95
Footpath SIDL
Kerb portion = 25 x 0.75 x 0.15 2.81 0.875 2.46
Parapet = 25 x 1 x 0.1 2.5 0.875 2.19
slab = 25 x 0.9 x 0.1 2.25 0.4375 0.98
Total 7.56 5.63
Reaction on Girder Ra
For point load For moment Total
Dead load 3.56 x 3.625 / 2.35 = 5.49 KN 1.69 / 2.35 = 0.72 KN 6.21
Effective span = 18 m
Due to Diaphragm
Length = 4.05
Width = 0.4
Height = 1.275
Weight of Diaphragm = 25 x 4.05 x 0.4 x 1.275 = 51.64 KN
Weight of Diaphragm on one Girder = 0.5 x 51.64 = 25.82 KN
14.06 KN
8.64 KN
Analysis of 12.2 m PSC Girder as per RDSO/B-10258/1
5.45 m
1.35 m
Live load = 184.73
SIDL = 13.52
0.15 m 0.15 m
0.75 m Height of Ballast wall
0.22
Output Data
Reaction on Girder Ra
Due to dead load of slab = 27.11 KN
Due to SIDL = 47.86 KN
Due to live load = 108.58 KN
This load will be applied as a point load with 100 mm eccentricity from the center line of Girder
0.1
Height of Kerb wall 0.58 m Extended deck slab portion
0.95
Footpath SIDL
Kerb portion = 25 x 0.58 x 0.15 2.18 0.875 1.91
Parapet = 25 x 1 x 0.1 2.5 0.875 2.19
slab = 25 x 0.9 x 0.1 2.25 0.4375 0.98
Total 6.93 5.08
Reaction on Girder Ra
For point load For moment Total
Dead load 5.23 x 3.975 / 2.5 = 8.32 KN 2.48 / 2.5 = 0.99 KN 9.31
13.05 KN
8.83 KN
H
0 F
G
E E
D (Both sides)
C
900 X
150
150
150 5 A
130
Sectional properties of Girder
Igirder
width Height Area,A x Ax MI about C.G r=(x1-x) (in m4)
Section Nos (in m) (in m) (in m2) (in m) (in m3) (in m4) (in m) r2 A.r2 (MI + Ar2)
Girder portion
A 1 0.5 0.175 0.0875 0.0875 0.0076563 0.000223307292 0.6897386 0.4757393 0.0416272 0.0418504996
B 2 0.085 0.15 0.01275 0.225 0.0028688 0.0000159375 0.5522386 0.3049675 0.0038883 0.0039042728
C 1 0.33 1.125 0.37125 0.7375 0.2737969 0.039155273438 0.0397386 0.0015792 0.0005863 0.0397415353
D 2 0.21 0.05 0.0105 1.2833333 0.013475 1.458333333E-06 -0.506095 0.2561319 0.0026894 0.002690843
E 1 0.75 0.15 0.1125 1.375 0.1546875 0.0002109375 -0.597761 0.3573187 0.0401984 0.0404092898
Sheating
a 0.085 0.0056745 0.13 0.0007377 2.562392188E-06 0.6472386 0.4189178 0.0023771 0.0023797122
b 0.085 0.0056745 0.28 0.0015889 2.562392188E-06 0.4972386 0.2472462 0.001403 0.0014055615
c 0.085 0.0056745 0.43 0.00244 2.562392188E-06 0.3472386 0.1205746 0.0006842 0.0006867634
d 0.085 0.0056745 0.58 0.0032912 2.562392188E-06 0.1972386 0.0389031 0.0002208 0.0002233179
Total 0.571802 0.4444266
Igirder
width Height Area,A x Ax MI about C.G r=(x2-x) (in m4)
Section Nos (in m) (in m) (in m2) (in m) (in m3) (in m4) (in m) r2 A.r2 (MI + Ar2)
Girder 1 0.572 0.777 0.4444266 0.124 0.367 0.1345139 0.0769153 0.2008164142
F 1 1.525 0.22 0.3355 1.56 0.52338 0.001353183333 -0.416 0.173056 0.0580603 0.0594134713
G 1 0.875 0.07 0.030625 1.4966667 0.0458354 8.336805556E-06 -0.353 0.1243738 0.0038089 0.0038172838
H 1 0.875 0.15 0.13125 1.595 0.2093438 0.00024609375 -0.451 0.203401 0.0266964 0.026942475
1.069 1.2229857
Section
modulus at
Bending moment Section modulus at top of Girder
Description (KN-m) top of Slab (m3) (m3)
Self Weight of Diaphragm and Slab 335.96 0.184
SIDL 623.56 0.553 0.951
Live Load 1886.54 0.553 0.951
Section
modulus at
Bending moment Section modulus at top of Girder
Description (KN-m) top of Slab (m3) (m3)
Self Weight of Diaphragm and Slab 1204.3 0.184
Increase in stress
Section
modulus at
Bending moment Section modulus at top of Girder
Description (KN-m) top of Slab (m3) (m3)
Self Weight of Diaphragm and Slab 538.55 0.184
Increase in stress
of deck width
of deck width
Mid span Mid span Mid span Mid span Mid span
Sl.
Sl. No. Description
Description
No.
Top of Top of bottom of Top of Top of bottom Top of bottom of Top of bottom of Top of bottom of
slab girder girder slab girder of girder Top of slab girder girder Top of slab girder girder Top of slab girder girder
4 Ballast and track 1.188 0.72 -2.362 2.841 1.652 -6.186 4.029 2.372 -8.548 4 Ballast and track 4.029 2.372 -8.548
Net stress 0.359 2.519 12.537 2.841 6.371 -11.647 3.2 8.89 0.89 Net stress -0.010 0.040 0.373 3.19 8.93 1.263
Differential
Differential Shrinkage Shrinkage with
5 with long term losses 0.365 -0.059 -2.857 0.365 -0.059 -2.857 5 long term losses -0.008 0.032 0.298 0.357 -0.027 -2.5586
Net stress 0.724 2.46 9.68 0.724 2.46 9.68 Net stress -0.008 0.032 0.298 0.716 2.492 9.9784
6 Live Load 3.41 3.991 -8.463 4.091 2.378 -8.905 7.501 6.369 -17.368 6 Live Load 7.501 6.369 -17.368
Net stress 4.134 6.451 1.217 6.932 8.749 -20.552 11.066 15.2 -19.335 Net stress -0.008 0.032 0.298 11.058 15.232 -19.0366
Effect of Introducting Extra TWO number of strands in cable 4 of in PSC Girder for 12.2 m span (RDSO/B-10258)
Cumulative stress sheet including
Additional effect due to effect of additional width of deck
Stress sheet for existing PSC Girder increase in width of deck slab Cumulative Stress sheet Stress sheet due to Introducing one strand in cable 4 slab
Mid span Mid span Mid span Mid span Mid span
Sl.
Sl. No. Description
Description
No.
Top of Top of bottom of Top of Top of bottom Top of bottom of Top of bottom of Top of bottom of
slab girder girder slab girder of girder Top of slab girder girder Top of slab girder girder Top of slab girder girder
4 Ballast and track 1.188 0.72 -2.362 2.841 1.652 -6.186 4.029 2.372 -8.548 4 Ballast and track 4.029 2.372 -8.548
Net stress 0.359 2.519 12.537 2.841 6.371 -11.647 3.2 8.89 0.89 Net stress -0.020 0.080 0.746 3.18 8.97 1.636
Differential
Differential Shrinkage Shrinkage with
5 with long term losses 0.365 -0.059 -2.857 0.365 -0.059 -2.857 5 long term losses -0.016 0.064 0.597 0.349 0.005 -2.2602
Net stress 0.724 2.46 9.68 0.724 2.46 9.68 Net stress -0.016 0.064 0.597 0.708 2.524 10.2768
6 Live Load 3.41 3.991 -8.463 4.091 2.378 -8.905 7.501 6.369 -17.368 6 Live Load 7.501 6.369 -17.368
Net stress 4.134 6.451 1.217 6.932 8.749 -20.552 11.066 15.2 -19.335 Net stress -0.016 0.064 0.597 11.05 15.264 -18.7382
Effect of Introducting Extra THREE number of strands in cable 4 of in PSC Girder for 12.2 m span (RDSO/B-10258)
Additional effect due to Cumulative stress sheet including
increase in width of deck slab effect of additional width of deck
Stress sheet for existing PSC Girder and C-C DISTANCE Cumulative Stress sheet Stress sheet due to Introducing one strand in cable 4 slab
Mid span Mid span Mid span Mid span Mid span
Sl.
Sl. No. Description
Description
No.
Top of Top of bottom of Top of Top of bottom Top of bottom of Top of bottom of Top of bottom of
slab girder girder slab girder of girder Top of slab girder girder Top of slab girder girder Top of slab girder girder
4 Ballast and track 1.188 0.72 -2.362 0.646 0.376 -1.407 1.834 1.096 -3.769 4 Ballast and track 1.834 1.096 -3.769
Net stress 0.359 2.519 12.537 0.646 1.477 -2.681 1.005 3.996 9.856 Net stress -0.020 0.080 0.746 0.985 4.076 10.602
Differential
Differential Shrinkage Shrinkage with
5 with long term losses 0.365 -0.059 -2.857 0.365 -0.059 -2.857 5 long term losses -0.016 0.064 0.597 0.349 0.005 -2.2602
Net stress 0.724 2.46 9.68 0.724 2.46 9.68 Net stress -0.016 0.064 0.597 0.708 2.524 10.2768
6 Live Load 3.41 3.991 -8.463 0.278 0.161 -0.606 3.688 4.152 -9.069 6 Live Load 3.688 4.152 -9.069
Net stress 4.134 6.451 1.217 0.924 1.638 -3.287 5.058 8.089 -2.07 Net stress -0.016 0.064 0.597 5.042 8.153 -1.4732