You are on page 1of 23

ºÉiªÉ¨Éä´É VɪÉiÉä

GOVERNMENT OF MAHARASHTRA

PUBLIC WORKS REGION,PUNE

PUBLIC WORKS CIRCLE, SOLAPUR

PUBLIC WORKS DIVISION , PANDHARPUR

DETAILED SURVEY DATA

PUBLIC WORKS SUDIVISION, PANDHARPUR


Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

INDEX
Sr.No. Particulars Pages
From To
1 General Report 3

2 Hydralic data sheet. 4 5

3 Calculation of Hydrulic Gradient 6

4 Discharge by various impirical formulas 7

5 Mannings Discharge at HFL RL 8 9

6 Discharge Calculation at HFL RL 10 11

7 Mannings Discharge at OFL RL 12

8 Discharge Calculation at OFL RL 13 14

9 Calculation of LInear water way at HFL RL 15

10 Calculation of LInear water way at OFL RL 15

11 Bridge proposal 16

12 Scour depth calculation 16

14 Calculation of foundation level 16

15 Design of Abutment 17

16 Design of Pier 17

17 Raft foundation 17

18 Percentage Obstruction 18 19

19 Afflux Calclulation 20

DRAWINGS
Sr.No. Particulars Pages
From To

1 Catchment area plan 22

2 L- section of nallaha 23

3 Define cross section of Nallah 24 25

4 Existing cross section of Nallah 26

5 Proposed cross section of Nallah 27

6 Nallaha Plan 29

7 Key map 30

8 Taluka map 31

GENERAL REPORT

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

Authority :-
Neccessity :-

Selection of site :- The site for new proposed bridge has been selected on Existing
Road crossing itself , where nallah bed width is minimum. The Site
is selected on existing road crossing itself because due to thick forest
zone their is no other sutaible site is available.

Existingstructure:- There is a Existing RCW of 800 mm Dia 6 Rows. Which is submerged


Complete Blockage of traffic during rainy season.This new proposed bridge
is on Existing W.B.M. Road .There is no any other Existing Structure on this
crossing.

Approches :- As far as possible the proposed bridge approches are straight easy
for traffic and easily approcheble.

Prepared By :-

Checked By :-

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division Public Works Division
Pandharpur Pandharpur

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

H Y D R A U L I C D A T A SHEET

1 Catchment Area 10.714 Sq Miles


Location of Defined Cross - Section

2 Bed width @ existing 50.00 Mt

3 Bed width @ defined 25.00 Mt


4 Bank width @ existing 80.00 Mt

5 Bank width @ defined 95.00 Mt

6 Lowest bed level @ defined 437.89

7 Lowest bed level @ proposed 437.84

8 O.F.L.(tallied) @ defind 440.90

9 O.F.L.(tallied) @ proposed 440.85

10 H.F.L.(tallied) @ defind

11 H.F.L.(tallied) @ proposed 2.10

12 H.F.L.(obsered) @ defind 453.20

13 H.F.L.(obsered) @ proposed 455.30

14 Hydraulic gradient 1 in 317.69

15 Nature of crossing Skew 6

16 Nature of bed Sandy having some Pabbels

17 Silt factor 3.5

18 Rugosity coefficient
Comp I n-1 = 0.031
Comp II n-2 = 0.045
Comp III n-3 = 0.031

19 Discharge by Inglish formula 553.628 cum/sec

20 Discharge by Modified Inglish formula 316.359 cum/sec

21 Discharge by Dickens formula --

22 Mannings discharge @ H.F.L. 542.567 cum/sec

23 Mannings discharge @ O.F.L. 161.420 cum/sec

24 Difference in HFL & LBL 5.01 mtrs

25 Difference in OFL & LBL 3.01 mtrs

26 Linear Waterway at HFL 23.23 mtrs

27 Linear Waterway at OFL 16.52 mtrs

28 Proposed spanning

29 Proposed RTL 443.06 m


30 Scour Depth d= .= 2.54 m
D= 2xd = 5.07 m

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

DISCHARGE CALCULATIONS BY VARIOUS FORMULA

A] Discharge by Inglis formula

Q = C X A / ( A+4 )0.5

Q= 7000 X 10.714 A = Catchment area in sq. miles


( 125.67+ 4 )^0.5 10.714 sq. miles
C = Co. Eff. For catch. Area < 20 Sq.mile
Q = 19551.6902 cusec Value of C For CA 0.75= 4000
Value of C For CA 1.00= 4000
Q = 19551.6902 So Value of C For CA 1.00 = 7000
35.3156
Q = 553.62758 cum/sec

Say = 553.63 cum/sec

B] Discharge by Modified Inglis formula

Q = C X A / ( A+4 )0.5

Q= 4000 X 10.714 A = Catchment area in sq. miles


( 125.67+ 4 )^0.5 10.714 sq. miles
C = Co. Eff. For catch. Area
Q = 11172.3944 cusec 4000

Q = 11172.3944
35.3156

Q = 316.358617 cum/sec

Say = 316.36 cum/sec

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

CALCULATION OF HYDROULIC GRADIENT "S"

Sr.No chainage U/S RL chainage D/S RL diff. In RL length Slope Average

1 100 438.272 0.00 437.985 0.287 100 0.00287


2 90 438.244 10.00 437.890 0.354 100 0.00354
3 80 438.215 20.00 437.869 0.346 100 0.00346
4 70 438.186 30.00 437.848 0.338 100 0.00338 0.03554
5 60 438.156 40.00 437.827 0.329 100 0.00329 11
6 50 438.128 50.00 437.802 0.326 100 0.00326
7 40 438.099 60.00 437.777 0.322 100 0.00322
8 30 438.071 70.00 437.752 0.319 100 0.00319
9 20 438.042 80.00 437.727 0.315 100 0.00315
10 10 438.014 90.00 437.702 0.311 100 0.00311
11 0 437.985 100.00 437.677 0.308 100 0.00308
0.03554 0.00323

Gradient = 0.003230 .i.e.= 1 : 309.55

ie. S =1 in 317.69
S^O.5 = 0.003230 )^O.5

S^O.5 = 0.057

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

Manning discharge at H.F.L

Compartment No. I Gopalpur Side HFL= 442.900

Chainage H.F.L G.L Depth Mean D Length Area Diff GL wett.P

40 442.900 443.800 0.000 0.000 0.00 0.000 0.000 0.000


50 442.900 443.710 -0.810 -0.405 10.00 0.000 0.090 0.000
61.7 442.900 442.900 0.000 0.000 0.00 0.000 0.000 0.000
70 442.900 440.225 2.675 1.337 8.30 11.101 2.675 8.720
75 442.900 439.580 3.320 2.997 5.00 14.987 0.645 5.041
80 442.000 438.225 3.775 3.547 5.00 17.738 1.355 5.180
43.826 18.942

Compartment No. II H.F.L. = 442.900

Chainage H.F.L. G.L Depth Mean D Length Area Diff GL wett.P

80 442.900 438.225 4.675 0.000 0.00 0.000 0.000 0.000


85 442.900 437.890 5.010 4.842 5.00 24.212 0.335 5.011
90 442.900 437.895 5.005 5.008 5.00 25.038 0.005 5.000
95 442.900 438.085 4.815 4.910 5.00 24.550 0.190 5.004
73.800 15.015
Comparment No. III Mundhewadi Side HFL= 442.900

Chainage H.F.L G.L Depth Mean D Length Area Diff GL wett.P

95 442.900 438.085 4.82 0.000 0.00 0.000 0.000 0.000


100 442.900 440.035 2.865 3.840 5.00 19.200 1.950 5.367
110 442.900 442.000 0.900 1.882 10.00 18.825 1.965 3.700
114.5 442.900 442.900 0.000 0.450 4.50 2.025 0.900 4.700
120 442.900 443.310 -0.410 -0.205 5.50 0.410
130 442.900 443.500 -0.600 -0.505 10.00 0.190
140 442.900 443.600 -0.700 -0.650 10.00 0.100
40.050 13.767

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

DISCHARGE CALCULATION AT H.F.L.

1] Compartment No. I

Wetted Area. = A1 = 43.826 Sqm.


Wetted Perimetre = P1 = 18.942 m.
Hydraulic mean depth = (R) = A1 / P1= 2.314 2.314

Co. Efficient of rugosity = n1 = = 0.031

Hydraulic gradient = S = = 0.0032

Velocity in Comp. I = V1 = 1/n1 X ( R )2/3 X ( S ) 1/2

= 1/0.040 x ( 0.649 )2/3 x ( 0.0019 ) 1/2

= 3.21 mt / sec

Discharge through Comp. I = Q1= A1 X V1

= 43.83 X 3.21

= 140.56 Cum. / Sec.

2] Compartment No. II

Wetted Area. = A2 = 73.800 Sqm.


Wetted Perimetre = P2 = 15.015 m.
Hydraulic mean depth = (R) = A2 / P2 = 4.915 4.915 m.
Co. Efficient of rugosity = n2 = = 0.045

Hydraulic gradient = S = = 0.0032

Velocity in Comp. II = V2 = 1/n2 X ( R ) 2/3 X ( S ) 1/2

= 1/0.0285 x ( 2.184 )2/3 x ( 0.0019 ) 1/2

= 3.65 mt / sec

Discharge through Comp. II = Q2 = A2 X V2

= 73.80 X 3.65

= 269.46 Cum. / Sec.

3] Compartment No. III

Wetted Area. = A3 = 40.050 Sqm.


Wetted Perimetre = P3 = 13.767 m.
Hydraulic mean depth = (R) = A3 / P3 = 2.909 2.909 m.

Co. Efficient of rugosity = n3 = = 0.035

Hydraulic gradient = S = = 0.0032

Velocity in Comp. III = V3 = 1/n3 X ( R ) 2/3 X ( S ) 1/2

= 1/0.040 x ( 0.495 )2/3 x ( 0.0019) 1/2

= 3.31 mt / sec

Discharge through Comp. III = Q3 = A3 X V3

= 40.05 X 3.31

= 132.54 Cum. / Sec.


Total Discharge through all three components = Q1 + Q2+Q3

= 140.56 269.46 132.54

= 542.57 Cum. / Sec.

Discharge by English Formula. = 553.63 at H.F.L.

Discharge by Modifid English Formula. = 316.36 at H.F.L.

Discharg by Manning's Formula. = 542.57 at H.F.L.

Total manning's discharge at H.F.L. = 542.57 cum/s which is fairly tallied


with Ingli's Discharge .I .e = + 2%
S.D.O. / S.D.E. Executive Engineer
Public Works Sub Division , Public Works Division
Pandharpur Pandharpur

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

Manning discharge at O.F.L

Compartment No. I Gopalpur Side OFL= 440.900

Chainage O.F.L G.L Depth Mean D Length Area Diff GL wett.P

67.3 440.900 440.900 0.000 0.000 0.00 0.000 0.000 0.000


70 440.900 440.225 0.675 0.337 2.70 0.911 0.675 2.783
75 440.900 439.580 1.320 0.997 5.00 4.987 0.645 5.041
80 440.900 438.225 2.675 1.997 5.00 9.987 1.355 5.180
15.886 13.005

Comparment No. II O.F.L. = 440.900

Chainage O.F.L. G.L Depth Mean D Length Area Diff GL wett.P

80 440.900 438.225 2.675 0.000 0.00 0.000 0.000 0.000


85 440.900 437.890 3.010 2.842 5.00 14.212 0.335 5.011
90 440.900 437.895 3.005 3.008 5.00 15.038 0.005 5.000
95 440.900 438.085 2.815 2.910 5.00 14.550 0.190 5.004
43.800 15.015

Comparment No. III Mundhewadi Side OFL= 440.900

Chainage O.F.L G.L Depth Mean D Length Area Diff GL wett.P

95 440.900 438.085 2.815 0.000 0.00 0.000 0.000 0.000


100 440.900 440.035 0.865 1.840 5.00 9.200 1.950 5.367
103.5 440.900 440.900 0.000 0.432 3.50 1.514 0.865 3.605
114.5 440.900 442.900 -2.000 -1.000 11.00 0.000 2.000 0.000
9.200 8.972

DISCHARGE CALCULATION AT O.F.L.

1] Compartment No. I

Wetted Area. = A1 = 15.886 Sqm.


Wetted Perimetre = P1 = 13.005 m.
Hydraulic mean depth = (R) = A1 / P1 = 1.222 1.222 m.

Co. Efficient of rugosity = n1 = = 0.031

Hydraulic gradient = S = = 0.0032

Velocity in Comp. I = V1 = 1/n1 X ( R )2/3 X ( S ) 1/2

= 1/0.040 x ( 0.483 )2/3 x ( 0.0019 ) 1/2

= 2.10 mt / sec

Discharge through Comp. I = Q1 = A1 X V1

= 15.89 X 2.10

= 33.28 Cum. / Sec.

2] Compartment No. II

Wetted Area. = A2 = 43.800 Sqm.


Wetted Perimetre = P2 = 15.015 m.
Hydraulic mean depth = (R) = A1 / P1 = 2.917 2.917 m.

Co. Efficient of rugosity = n2 = = 0.045

Hydraulic gradient = S = = 0.0032

Velocity in Comp. II = V2 = 1/n2 X ( R )2/3 X ( S ) 1/2

= 1/0.0285 x ( 1.144 )2/3 x ( 0.0019 ) 1/2

= 2.58 mt / sec

Discharge through Comp.II = Q2 = A2 X V2

= 43.80 X 2.58

= 112.94 Cum. / Sec.

3] Compartment No. III

Wetted Area. = A3 = 9.200 Sqm.


Wetted Perimetre = P3 = 8.97 m.
Hydraulic mean depth = (R) = A1 / P1 = 1.025 1.025 m.

Co. Efficient of rugosity = n3 = = 0.035

Hydraulic gradient = S = = 0.0032

Velocity in Comp. III = V3 = 1/n3 X ( R )2/3 X ( S ) 1/2

= 1/0.040 x ( 0.534)2/3 x ( 0.0019 ) 1/2

= 1.65 mt / sec
Discharge through Comp.III = Q1 = A3 X V3

= 9.200 X 1.65

= 15.192 Cum. / Sec.


Total Discharge through all three components = Q1 + Q2+Q3

= 33.28 112.94 15.19

= 161.42 Cum. / Sec.

Discharge by Mannings Formula. = 542.567 at HFL

Discharge by Manning's Formula. = 161.420 at OFL

O.F.L. Discharge
X 100
H.F.L. Discharge i. e. = 29.75 % < 30 % hence O.K.

Total Mannings Discharge at O.F.L. R.L. Which Works to 30% H.F.L. Discharge

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur
Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur

CALCULATION OF LINEAR WATERWAY AT HFL

H.F.L. = 442.900 LBL= 437.890 A1= 43.826 Sqm.


A2= 73.800 Sqm.
AT HFL = L = A/D A3= 40.050 Sqm.
Q1= 140.564 Cum./Sec.
A= A2 + A1 ( Q1/Q2 ) +A3(Q3/Q2) Q2= 269.463 Cum./Sec.
Q3= 132.540 Cum./Sec.
A= 116.36

D= H.F.L. - L.B.L.

D= 5.01 mt

L= 23.23 mt

Linear Waterway Required = A/D


Flood Depth = H.F.L - L.B.L.
= 5.010
Linear Waterway Required = 31.47
Avg Waterway Requred = 27.35

CALCULATION OF LINEAR WATERWAY AT OFL

O.F.L. = 440.900 LBL= 437.890 A1= 15.886 Sqm.


A2= 43.800 Sqm.
AT OFL = L = A/D A3= 9.200 Sqm.
Q1= 33.284 Cum./Sec.
A= A2 + A1 ( Q1/Q2 ) +A3(Q3/Q2) Q2= 112.944 Cum./Sec.
Q3= 15.192 Cum./Sec.
A= 49.72

D= O.F.L. - L.B.L.

D= 3.01 mt

L= 16.52 mt

Linear Waterway Required = A/D


Flood Depth = O.F.L - L.B.L.
= 3.010
Linear Waterway Required = 22.89
Avg Waterway Requred = 19.70
Provide 4 spans of 9 m each

Name of Work :- Construction Of Minor Bridge on Gopalpur Mundhewadi Chale Ambe Sarkoli
Road M.D.R. 112 @ Km 2/300 Tal. Pandharpur Dist Solapur
SCOUR DEPTH CALCULATION
For Highlevel Submerssible Bridge :

1) d= 0.473 X (Q/f)^1/3 Q = Manning discharge at H.F.L.


Q = 542.57 cum/sec
d= 2.54 mt f = Silt Factor
f = 3.50 [silt factor assum]
D1= 2Xd
Q/f = 155.02
Max. dep. D1= 5.07 mt

RL of max.scour = 437.83

BRIDGE PROPOSAL
For Submerssible Bridge (At Defined) (At Proposed)

O.F.L, 440.90 440.93

Affux (Assumed) 0.300 0.300

Slab Thickness 0.775 0.775

Vertical Clearance 0.98 0.975

Wearing Coat 0.080 0.080

R.T.L. 443.030 443.062

CALCULATION OF FOUNDATION LEVEL

FOR FOUNDATION
= L.B.L. -- -2.2
( At Defined C/S )
= 437.89 2.20

= 435.69 Hence O.K. Because Lowest.

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur
PERCENTAGE OBSTRUCTION (Before Silt removel)
At H.F.L. R.L.

Compartment No. I

Chainage H.F.L. G.L Depth Mean D Length Area Diff GL wett.P


a1
60.4 442.930 442.930 0.000 0.000 0.00 0.000 0.000 0.000
66.6 442.930 441.320 1.61 0.805 6.20 4.991 1.610 6.406
4.991 6.406

A/L @ 1.24+ 0.90 2.000 a= 1.900 Sq. m.


2
P1 1.025 2.950 3.024
Add or Slab Thickness 13.00 0.775 10.075

Total Area = a1 + a2 = A1'= 19.990 Sq. m.

Compartment No. II
P2 1.05 4.36 4.578
P3 1.04 3.41 3.529
Add or Slab Thickness 15.00 0.775 11.625

Total Area = A2 = 19.732 Sq. m.

Comparment No. III

Chainage H.F.L. G.L Depth Mean D Length Area Diff GL wett.P


a1

103.4 442.930 441.180 1.75


110 442.930 442.930 0.00 0.875 6.60 5.775 1.750 6.828
110 442.930 442.930 0.00 0.000 0.00 0.000 0.000 0.000
5.775 6.828

A/L @ 0 0.81+1.63 1.950 a= 2.223 Sq. m.


2
Total Area = a1 + a2 = A3= 7.998 Sq. m.

CALCLULATIONS :-

Compartment No. I
1] Discharge through Compartment.- I = Q1 = A 1 X V1

= 19.990 X 3.21

= 64.11 Cum. / Sec.

2] Compartment No. II
Discharge through Compartment.- II = Q2 = A2 X V2

= 19.73 X 3.65

= 72.05 Cum. / Sec.

Compartment No. III


3] Discharge through Compartment.- III = Q3 = A3 X V3
= 8.00 X 3.31

= 26.47 Cum. / Sec.

Total Discharge through all =Q = Q1 + Q2 + Q3


three Compartments
= 64.11 72.05 26.47

162.63 Cum. / Sec.

Discharge by Manning Formula at H.F.L = 542.57 Cum. / Sec.

Obstracted Discharge. = 162.63 Cum. / Sec.

% Obstruction = 162.63
542.57

Obstracted Discharge. i. e. = 29.97 % < 30 % Hence Safe


X 100
Mannings Discharge at OFL

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur

AFFLUX CALCULATION BY MOLESWORTH'S FORMULA

Afflux M= ( V^2/17.86 + 0.0153 ) ( (Q/Q1)^2 -1 ) Q= Mannings Discharge


Q= 542.57
V= Manning Discharge / Total Area

V= 542.57 157.676

V= 3.441 mt/sec.

Q1= Unobstructed Discharge

Q1= 542.57 162.63


Q1= 379.94 Cusec

M= ( ( 1.482 ) ^ 2 / 17.86 + 0.0153 ) X ( ( 39.49 / 28.93 )^2 - 1 )

M= 0.28700 mt.

M= 28.7000 cm . < 30 cm. Hence Safe

S.D.O. / S.D.E. Executive Engineer


Public Works Sub Division , Public Works Division
Pandharpur Pandharpur
157.676
1.74932
0.056837
25 2.485657
387.5393

1.997834
1.614
3.766

0.47075
5.775
1.155
2.19
3.75

You might also like