The purpose of this procedure is to eliminate the following

hazards commonly related to Utility Hoses.


 Use of wrong hose for the required service
 Rupture of hoses or Use of damaged hoses
 Disconnection of hose couplings
 Interchange of hoses & couplings at the utility station
SPECIFICATION :
Color : RED
Coupling Size : 1” Threaded Interlocking Coupling
End Connections : Whip Check Safety Cable
Pressure & Temperature : Pr-250 psi, Temp – 4500F
SPECIFICATION :
Color : YELLOW WITH RED STRIPE
Coupling Size : 1/2” Chicago Coupling
End Connections : Safety Clips to prevent disconnection of Chicago
Couplings
Pressure & Temperature : Pr-150 psi, Temp – 40 to 100 0C
SPECIFICATION :
Color : BLACK WITH RED STRIPE
Coupling Size : 1” Cam & Groove Coupling
End Connections : Cam & Groove Coupling with Self Lock Lever
Pressure & Temperature : Pr-150 psi
SPECIFICATION :
Color : RED WITH BLACK STRIPE
Coupling Size : 1” Threaded Interlocking Coupling
End Connections : Interlocking Threaded Coupling with Boss Clamp
Pressure & Temperature : Pr-200 psi
AIR WATER STEAM HYDROCARBON
Color

Black with Red


Yellow with Red Stripe Red Red with Black Stripe
Stripe
Coupling

1”&Threaded interlocking
1”& CAM & 1” & Threaded inter
Size/

½”& Chicago coupling coupling


Groove Coupling locking coupling
Pressure&
T emp.

Pr-150psi,Temp-40 to Pressure of 150 Pr – 250 psi, Temp –


Pressure 200 psi
100 C psi 450 F
End Conn. Spl

WHIP CHECK safety


Attachment

Safety Clips to prevent


Cam & groove is cable to prevent INTERLOCKING THREADED
disconnection of
equipped with a disconnection of COUPLING WITH BOSS
Chicago Universal
self lock lever interlock threaded CLAMP
couplings
couplings
1” MALE ADAPTER 1” FPT SOCKET
 Utility Hoses should be hydrostatically tested at 150% of the
recommended working pressure of hoses for 5 minis.
 Frequency of testing is once in 6 months
 Utility Hoses in units should be tested by respective
Supervisors. Testing should be carried out in the
Presence of CTR Supervisor.
 Proper Aluminum Tagging with punched holes should b
be provided for the hoses
 Damaged hoses should be cut in pieces so as to avoid
their use
 Prior to next due date for testing if the hose get damaged the
same should be replaced by CTR
 New hoses should be tested at CTR
 Tagging should specify Unit No., Service of the hose and Next
Due Date for Testing. The sample tag is as shown below

UNIT # 56 STEAM
NEXT DATE : 15/12/11