You are on page 1of 37

INTRODUCTION

 Mumbai has seen test maches played at different grouds.

 The bombay gymkhana ground hosted ever test . in india,in 1933-34 against england.

 THE CRICKET CLUB OF INDIA ltd’s BRABOURNE STADIUM- SECOND GROUND OF THE CITY.
 Wankhede stadium was built after the dispute between the M.C.A. And C.C.I.
 S. K. Wankhede, a politician ,m.C.A. Built a new stadium in south mumbai near the churchgate station.
 It
. was built approx. Six months and opened in time for the final test match between india and west
indies in 1975.

.Since then the wankhede stadium over brabourne stadium as the main cricketing venue of city.
INTRODUCTION

Project Title: 40000


35000
30000
‘Wankhede Stadium’ at Mumbai 25000
20000
15000 PREVIOUS
Locaton: Established : 10000
5000
SEATING
CAPACITY
0
Mumbai, India 1974
REVISED SEATING

GARWARE…

STANDTOTAL
STAND NORTH

STAND WEST
PAVILLION SOUTH
CAPACITY

Architect :

STAND
MCA)
DIVECHA

EAST
MCA
AR. Shashi prabhu & associates, P.K. das & associates

( OLD
 Project Details:-
LOAD
Stadium Statistcs:- GATE 1 MCA PAVILLION PLAYERS & VIPS
GATE 2 GARWARE,PART OF WEST & ALL BOXES PUBLIC
Approx. Area : 35,000 Sqm. GATE 3 EXIT FOR WEST & PART OF NORTH PUBLIC

Proposed seating : 32,000


GATE 4 NORTH STAND PRESS
GATE 5 NORTH STAND PUBLIC
Height of the Stand : GATE 6 EAST, DIVECHA PUBLIC
29 m from ground level
Ground radius : GATE 7 OLD MCA & BOXES PUBLIC
68.50 m GATE 7 OLD MCA & BOXES TOTAL
No of Flood Light : 1%

Seating capacity : 4 14% 6% 1%


50%
13%
33,000(earlier) 12%

Seating capacity : 37,000(present)


In each stands 3%
2000 spectators
LOCATION

MUMBAI
(MARINE LINE)

INDIA

MAHARASHTRA
Wankhede stadium at Night & with Flood
Lights on.

Wankhede stadium
view from the stand.

Newly refurbished,
Existing East
STADIUM DEVELOPMENT

 I.C.C.I. World cup cricket 2011 was to be hosted by india, bangkadesh, sri lanka.

 Mumbai was selected to host the final,it was decided to Redevelop the wankhed to suit the
mordern facilities and Comfert.
 While, redeveloping the wankhede stadium,the north end And the south end changes with better
facilities in terms Of bucket seating.
 One of the hight light of stadium is suspended cantilever Roofs.
 The teflon fabric roof is used as covering.
 The stadium has 20 elevators for north and south stand.
CHALLANGES
REMOVAL OF TEMPORARY TRESTLETS:-

1.Tempopary trestlets were provided to suports the 20 m cantilever of The truss.

TUBULAR STRUCTURAL WORK:-


2.The truss was supported to the truss throuth splindle jack Arrangement.

1.The stadium roof tubular structure was supported by 45 trusses connected by 45 inner
compressive
rings and Outer Compressive rings.
For the Mumbai Cricket Association (MCA), redeveloping the Wankhede Stadium up to
international standards
2.The total scope was a approx
of the roofing non-negotiable
4300mt of aspect. It Pipe
the tubular had structure
to be since
with I had
tensiledecided
plat
to host the 2011 World Cup Final there.
and
• 3.gutter
The illumination requirement
plate. 3.The 45 was finalised
truss was connected to the to galvanized
concrete column polygonal stadiumplates
Through connecting mast
with highly efficient 2 kW sports floodlight luminaire, which would ensure high-
4.and insert plate.
quality floodlighting and make it suitable for HDTV transmission.
• With such a major upgrade in such a tight deadline, MCA turned to the masters in
the illumination business, Bajaj Electricals Ltd., for a game-changing assist.
• BEL brought in a specialised project execution team for this task. The entire project
was further segregated into two major blocks to simplify the complexity of the task
CHALLANGES
 Lighting Design:
•Huge canopy obstructions over the spectator’s stand, which were a part of the
renovation, led to an enormous shadow being cast on the field of play (FOP) area
•Acute space constraint at the site led to asymmetrical location of all four masts.
BEL had to adhere to requirements of vertical illuminance level w.r.t. all camera
locations, balancing between vertical and horizontal illuminance level as well as
providing proper uniformity level on the playing arena
•Also, Bajaj had to restrict light spillage as there were residential properties nearby.
Light pollution was another aspect that had to be taken into consideration while
executing the project
 Project Execution:
•Acute space constraint for handling the erection of masts at designated locations
•No space for movement of crane for installing masts
•Near proximity of western railway high tension line to the masts. Several objections
from railway division for the same!
•No space for storing the material at site, resulting in unnecessary back and forth
and the timelines getting affected several times
PLUS POINTS
• Wankhede stadium is among worlds’ greatest 5 Cricket Stadiums.
• Whole roof is supported on large cantilever pipe trusses covered with teflon sheets.

• Stadium have biggest dressing room than any other Stadiums.

• There is special arrangement for broadcasting screens.

• Special arrangement for cameras, broadcasting units and press box.


• Creating of such a high class stadium in India shall provide an uninterrupted Opportunity to our Cricket Hero’s and

Budding
Stadium Cricketers to excel
serves food at their
everyskill in this
level of segment of Sport in further.
each stand.
• Column free stadium is an International concept, now followed in India in construction of Wankhede Stadium. The 360
• degree view during
It provides a match
separate give immense
staircase pleasure
for players, to theand
viewers viewers
vips.is an USP of Wankhede Stadium.
• Construction
Only stadiumof in
more similar
india kindelevators.
with of Stadiums in India would help in development of the immensely loved and popular
Game of Cricket, increasing passion towards it in our Country.
• Aesthetically appealing roof cover out of textile fabric has given an opening to new industries manufacturing Textile
fabric thereby helping in economical growth of India.
• The new concept of auctioning of spectators box, modern corporate lounges to the various businesses has begun and
there is long way for further improvisation from revenue generation point of view in India.
Entry gate to the stadium

Different stands

Google Earth image with entry points to the Wankhede stadium


The stadium has these stands

•Sunil Gavaskar Stand


•North Stand
•Vijay Merchant Stand
•Tendulkar Stand
•MCA Stand
•Vitthal Divecha Stand
•Garware Stand
•Grand Stand
SALIENT FEATURES
• North and South stands are newly constructed. The structure rests on piles and on footing in few
areas.
• The RCC elements comprises of raft, retaining walls, pile caps, footings, columns, inclined deck
beam and slabs etc.
• In case of East and West stands, area admeasures approx. 3500 sq mtrs. Existing foundations and
supporting columns were strengthened for chair seating arrangement without any alteration in the
seating capacity and stadium profile in view of its close vicinity to the Western Railway track.
• The strengthening was done using fiber reinforced Kevlar by introducing composite columns.
ŸDesign of foundation for a 70 meter high mast, four in numbers, resting over pile foundation for
lightening the ground during nights.
• The stadium is covered with aesthetically appealing and elegantly spaced structural steel roofing.
• The challenge was to design a 22 meter cantilever and its supporting system using bent tubular hollow
steel sections fabricated out of plates of different thicknesses and of varied diameters.
• The steel roofing comprises of 45 trusses connected by compression rings.
• The total tonnage of structural steel consumed was approx. 4000 MT. Handling of these massive steel
columns and cantilevers were an uphill task. Thus, the complex and intricate design involved
detailing, bending, fabricating, transporting, lifting and erection of steel components of various sizes
to provide intended look to the roofing.
• ŸDue to the space constraint, the steel truss members were fabricated out of Mumbai, transported to
site and then erected using high capacity crawler mounted cranes with varying (125-250T) booms
lengths.
SALIENT FEATURES
• In totality, there were 370 such truss members. A series of 90 compression rings fabricated
using 350mm dia tubular hollow sections are connected to the roof trusses, with outer radius of the
rings being approx. 80 meters.
• Construction of a stadium with huge quantum of concrete was just impossible in a relatively short
duration, without sizable quantities of shuttering, scaffolding, staging material for RCC works and
massive temporary supporting arrangements for holding the trusses till the compression ring was
complete.
• The structural design is carried out taking into account the composite action of the columns for
earthquake resistance.
• The entire structural steel roofing was covered with PTFE coated glass tensile fabric. A special team
was flown to Sri Lanka for testing the fabric material and approving its quality.
• ŸHeavy columns sections extending beyond the top edge of the stadium and each unit weighing in
tonnes were fabricated out of three tubular hollow pipes in a triangular profile fabricated out of
various diameter MS pipes. Designing of the 22 meter cantilever and its supporting system was a real
challenge.
• Seven entrance gates, twenty staircases, eighteen lifts,and thirty-five emergency exits, ensures faster
movement and high standard of safety. The 25-meter cantilevered roof is the most interesting feature of the
stadium. It completely opens up the stands, as no pillars or supports come in the way of the spectator’s view.
Safety Products
• Fire Alarm system
• Public Address (PA) system
Security Products
• CCTV system
• Access Control system
• Spectator Management system
Building Management System
• EPABX
• UPS
• CATV
• Networking
• Water Level monitoring
• Lift monitoring
• HVAC monitoring
• High mass monitoring and Electrical points
monitoring
Stages in the evolution of the human stampede risk reduction framework.
Inclusive framework for Human Stampede Risk Reduction Framework for Mass Gathering Occurrences.
The Structure
• The structure basically has four areas identified as ‘The Stands’ viz. North, South, East and West Stands.
• The East Stand abuts the Western Railway line, whereas the West Stand is towards the sea front.
• As per the new construction, North and South Stands have five levels of seating whereas the East and West Stands have
three levels.
Exposure Condition
• Exposure conditions considered in the designing of structural elements was assigned as severe as stipulated in the Code.
• The cover to reinforcement was proposed accordingly. To avoid any atmospheric action on the structural steel elements
since the stadium is on the coast, an anti-corrosive paint coating of appropriate thickness is applied to the exposed
structural steel portion.
Controlling the Field Work
• Larsen & Toubro was entrusted the contract for the entire stadium reconstruction.
• Their major scope of work for the stadium reconstruction included the following:
ŸAll Civil, RCC, structural and allied works for the reconstruction south basement and superstructure of North & South
stands and refurbishment of East and West Stand
ŸStrengthening of East & West stand by means of jacketing/fiber wrapping, epoxy treatment, polymer treatment including

reconstruction of toilet boxes and its plumbing systems


ŸEngineering, supply, fabrication, assembly and erection of high strength M.S. Tubular steel structure with its associated

roofing system made of composite textile membrane and its supporting structures for all the four stands
ŸWaterproofing system treatment to basement, underground structure and toilets, balconies, chajja etc.

ŸPublic health engineering services covering plumbing with its U.G. Tank and O.H. Tanks and its distribution network and

its sanitary system with its drainage network for all the stands besides storm water and field drainage system
Fire protection system complete with pumping and distribution network
ŸElectrical distribution system with H.T. & L.T. sub-stations and its network as specified and the lighting

system for common areas


ŸExterior finishes with dry cladding and structural glazing and painting complete asper architectural design

Tubular Structural Works


• Building the structure with its unique shape involving bending of pipes, profile cutting, cantilever with 20
meter involved several challenges and engineering expertise.
• TheNstadium roof tubular structure consists of 45 trusses connected with 45 inner compression rings and
45 outer compressions rings.
The total scope of the roofing structure was approx 4300MT of the tubular pipe structure with the tensile
plate and the gutter plates. The 45 truss was connected to the concrete columns through connecting plates and
insert plates.
• The scope of the work was complete detailing, bending, fabrication and erection of the fabricated
components. Design of the connections of the trusses and the connecting members was proposed in such a way
so as to increase the speed of erection.
Ra
ilw
ay
WANKHEDE STADIUM
SEA

lin
e
GAREWARE CLUB HOUSE HOCKEY
STADIUM

MAIN ENTRANCE
ROAD

BCCI CRICKET CENTRE


North Stand
Any and every discussion on the Wankhede is incomplete without a mention of the
iconic North Stand. Offering a 75-degree view, long-offish (fine-legish if the bowler is
running into you), so to speak and home to the ‘North Stand Gang’, its occupants have
been the most knowledgeable. So much so that they can call a slower ball from up
above
Sunil Gavaskar Pavilion
To the left of North Stand is what used to be officially called ‘East Stand’. That’s how it’s
known colloquially, even today. Named after one of the greatest opening batsmen of all
time, it is the ‘common’ man’s enclosure. This stand gives you the best entertainment
at pocket-friendly prices. And, yes, it doesn’t have a roof, so you’re bound to fight the
sun. This enclosure abuts the Western Railway tracks. It is a delight to be here on an MI
match day, because many a six lands here. For the record, Gavaskar would first
acknowledge the cheers from the East Stand upon reaching a milestone.

jay Merchant Pavilion


Sunil Gavaskar Stand, and named after the founder of the Bombay School of Batsmanship, the Vijay Merchant Pavilion is also known
as the ‘West Stand’. Some of the seats here are reserved for the members of the three original gymkhanas of Mumbai: PJ Hindu,
Islam and Parsi
MCA Pavilion
It pays to find a seat at the MCA Pavilion. Thronged by youngsters who spend more time watching who’s walking up and down the
dressing room stairs, this enclosure is a selfie-seeker’s delight. Who knows, Rohit Sharma could be in the mood to oblige you!
That’s not all. The MCA Pavilion offers a fantastic view and is usually occupied by ‘cricket people’.

Grand Stand
Right above the bowler’s arm: that’s how simply one can explain the view from the top tier of the Grandstand. Situated on top
of the dressing rooms, it is where you want to be. Watch out for the straight hits over the sight screen
Garware Pavilion
was being built in 1974, the Garware Group of Industries had contributed a whopping Rs 12 lakh to the cause. And the Mumbai
Cricket Association rightly honoured its benefactors. It is arguably the most high-profile pavilion at the Wankhede, replete with a
grand entrance. The Wankhede also houses the Garware Club House, a recreational facility to the who’s who of the city. If you ever
meet the gift fairy, ask her for a ticket to the Garware Pavilion. You’ll love the experience
Vijay Merchant Pavilion
Sunil Gavaskar Stand, and named after the founder of the Bombay School of Batsmanship, the Vijay Merchant Pavilion is also known
as the ‘West Stand’. Some of the seats here are reserved for the members of the three original gymkhanas of Mumbai: PJ Hindu,
Islam and Parsi
achin Tendulkar Stand
circle! Named after you know who, this is the largest enclosure at the Wankhede, accounting for nearly one-third of the seats.

The proposal to honour Tendulkar after he became the first batsman to score 10,000 runs in one-day
cricket
Ground Radius: 68.50 meters

Each stand has a seating capacity of more than 2000 spectators.


MCA PAVILION PLANS
MCA PAVILION
-4.55 LVL
MCA PAVILION
-4.55 LVL
MCA PAVILION
+6.50 LVL

MCA PAVILION
+10.95 LVL
Section
Typical Sectional View
Elevation From Inner
Side
Section Private Box

PLAN PRIVATE BOX SECTION PRIVATE


@ +5..60 LVL BOX
@ +5..60 LVL
MCA Pavilion
Section
To Ensures faster movement
and high standard of safety.

Seven entrance gates


 twenty staircases
 eighteen lifts
 thirty-five emergency exits
All public areas are monitored for
security purposes through the
installation of one hundred and ninety
cameras,  networked and connected to
a central monitoring room.
 All the services such as water supply
and distribution, air-conditioning in
specific areas, smoke detectors, fire-
alarm systems and power supply are
monitored at a central BMS room.
All the basic amenities and design
standards have been in conformity
with ICC norms and guidelines.

You might also like