A PROJECT ON

CASE STUDY OF BHARAT RATNA SHRI ATAL BIHARI


VAJPAYEE EKANA CRICKET STADIUM
In Partial Fulfilment of The Requirement For The Award of

3 Years Diploma in Civil Engineering


Submitted By

Govind Pal.....................................................(E1771432200032)
Navneet Tiwari..............................................(E1771432200033)
Sandeep Kumar Patel....................................(E1771432200036)
Saurabh Raj (L.).............................................(E18271437500004)
Mohammad Anas (L.)...................................(E18271437500005)

Supervisor Submitted To

Mr. ANKUR KUMAR SAHU Mr. ANKUR KUMAR SAHU


(HOD Civil Engineering) (HOD Civil Engineering)

R.R.I.M.P
R.R. INSTITUTE OF MODERN POLYTECHNIC, LUCKNOW
MAY – 2020

i
BOARD OF TECHNICAL EDUCATION UTTARPRADESH
INDIA - 2020
ALL RIGHT RESERVED

ii
DEDICATED TO MR. ANKUR SAHU (HEAD
OF DEPARTMENT)

iii
R R INSTITUTE OF MODERN POLYTECHNIC
LUCKNOW, UTTAR PRADESH
CANDIDATE’S DECLARATION
I here certify that the work embodied in this project entitled "Case Study of Bharat Ratna
Shri Atal Bihari Bajpai Ekana Cricket Stadium " by GOVIND PAL, Roll No.-
E1771432200032, in the partial fulfillment of the requirements for the award of 3 years
Diploma in Civil Engineering submitted to the R.R Institute of Modern Polytechnic
Lucknow, Uttar Pradesh, is an authentic record of my own work carried out under the
Supervision of Mr. Ankur Kumar Sahu. The matter presented in this project has not been
submitted by me in any other university/Institute for the award of any other degree or
diploma. The responsibility for any plagiarism related issue stands solely with me.

(GOVIND PAL)
E1771432200032
This is to certify that the above statement made by the candidate is correct the best of my
knowledge and belief, however, responsibility for any plagiarism related issue solely stands
with the student.

Mr. Ankur Kumar Sahu


(Supervisor)
H.O.D Civil Department
R.R Institute of Modern Polytechnic
Date:-

The viva-voice of GOVIND PAL has been held on …………………………

(Signature of External Examiner)

iv
R R INSTITUTE OF MODERN POLYTECHNIC
LUCKNOW, UTTAR PRADESH
ACKNOWLEDGEMNET
Time has provided me the cherished opportunity to express my heartfelt gratitude to my
supervisor Mr. Ankur Kumar Sahu ,H.O.D Civil Department RR Institute of Modern
Polytechnic, Lucknow, Uttar Pradesh, who permitted me to carry out project work under his
able guidance. I shall ever remain indebted to them for the meticulous guidance, constructive
criticism, clear thinking, keen interest constant encouragement and forbearance right from the
beginning of this project to its completion.

I am also thankful to all faculty and staff members of Civil Engineering Department for their
full cooperation and help.

I would like to special thank to Mr. SHAILENDRA MANI TRIPATHI Vice Principal, R.R
Institute of Modern Polytechnic I would like to pay my sincere thanks to Mr. Anuj Rathore
(Coordinator).

The cheerful support of my friend MD.ANAS and colleagues is sincerely appreciated.


Special words of appreciation go to laboratory staff members, who helped me in my
experimental work.

Above all, I thank my parents, younger brother RAHUL SINGH, whose love and
affectionate blessing have been a constant source of inspiration in making this manuscript a
reality.

I render my gratitude to the almighty who bestowed self-confidence, ability ands strength in
me to complete this work.

(GOVIND PAL)
E1771432200032

v
ABSTRACT

The Ekana Cricket Stadium with world class facilities is aimed to give boost to sports in Uttar
Pradesh. Also the objective is to provide state of art facilities to the sports men/women
towards enhancing their performance at National and International level. This Ekana cricket
stadium of 50,000 seating capacity, with facilities for Day/ Night matches, will be among the
most advanced stadiums. It would be equipped with next generation facilities for players,
officials, VIP's, spectators and the media. The design of this one of its kind stadium follows
the guidelines and specifications laid out by ICC and BCCI for hosting international cricket
matches.

The highlights of the stadium will be :


32 Corporate boxes
4 Platinum boxes & 4 Director lawns
VVIP and VIP lounge with dining hall, conference hall and rest room
Rehabilitation center
Media gallery
Commentary box
Umpire lounge
Audio visual room
Players pavilion with all facilities
Dispensary
Dope test lab
Physiotherapy area
Gymnasium
Guest house
Sports academy
stadiums stadiums
International Indoor Multi Sports Stadium
The international indoor multi-sport stadium at Ekana Sportz City is being designed with
state of art facilities.
stadiums
Lawn Tennis Courts
World class tennis court and academy is being developed at Ekana Sportz City. The objective
of this Tennis Stadium and Academy is to have the world class facilities in the state for
organizing tennis events at National and International levels, and also facilitate training to the
upcoming tennis players and students.

There will be eight practice courts and two courts exclusively for national and international
level matches. The playing surface will be of synthetic material meeting the specification of
International Tennis Federation (ITF).

vi
TABLE OF CONTENT

vii
S.No TITLE Pg.No

viii
1 FRONT PAGE
COPY RIGHT PAGE
DEDICATED PAGE
CANDIDATE DECLARATION
ACKNOWLEDGEMENT
ABSTRACT
TABLE OF CONTENT
2 CHAPTER-1 1-2
(INTRODUCTION)
(a)Background of Lucknow 1
(b)Lucknow development authority 2
3 CHAPTER -2 (NEED OF A CRICKET 3-6
STADIUM)
3
(a) Improving the performance in sports
(b) Hub for national and international level 3
sports events
(c) Regional analysis 3
(d) Development Of Sports Hub 6
4 CHAPTER -3 (LUCKNOW EKANA 7-9
CRICKET STADIUM FACT SHEET)

` CHAPTER -4 (PROJECT COSTING AND 10-12


PHASING)

6 CHAPTER -5 ( SCOPE OF THE 13-20


PROJECT)

(a) Minimum Development Obligations 13


(b) Completion of Project 14-16
(c) Specifications 16

(d) Components of stadium 17-20

7 CHAPTER -6 (RESULT & DISCUSSION) 21

ix
8 CHAPTER -7 ( CONCLUSION ) 22

9 CHAPTER -8 (FUTURE SCOPE) 23

10 CHAPTER -9 (REFERENCE) 24

11 CHAPTER -10 (WORKING GALLERY) 25-29