INTRODUCTION OF TALKATORA STADIUM

•LOCATION:New Delhi, in India


PROJECT : M/S Raja Aderi Consultant pvt. Ltd.
•Total area of the complex: 12.13 acres
•Total built up area : 3.7 acres
•Capacity - 3035 people
•The stadium was a venue for the 2010
Commonwealth Games for the event of boxing.
•Three entries to site: vehicular , pedestrian and
players
•Cost of construction 25 lakh
PARKING
• Two parkings: public and vip
SERVICES
• Basement Plan It houses air-conditioning plants,
hydro pneumatic water supply system,
emergency generating sets, fire fighting pumps
and an underground water tank.
• Main sewer along Park Street.
• Covered drains for storm water run off
throughout the side
• 2 underground water tanks for rain water
harvesting.
• Circulation services .
FACILITIES
• one competition ring and four warm-up area
• Boxers will reach the ring from an underground
tunnel (30.5 feet) inside the players facility
centre,walking a total of 60 steps.
• sports lighting , 184 CCTV cameras, a media
centre with computers, anti-doping centre,
• gym , separate rooms for boxers with a bed, a
cupboard and a rack.
LIGHTING
• 60 solar energy lights in the compound
• These lights are made of Light Emission Diode
chip which consumes minimum energy.
• Used LED lamps.
ENERGY EFFICIENT
•  A number of environment-friendly material
and energy-efficient devices have been used in
this block to make it a green building.
• The venue has been redesigned and oriented
in such a way so as to take advantage of solar
angles and wind direction.
• The roof of the stadium will also have solar
energy panels.
GROUND FLOOR PLAN
SEATING PLAN
UPPER FLOOR PLAN
SECTION DETAILS
SECTION
FACILITY CETRE