DATA TEKNIS
Pd = 25 + L + 25
= 25 + 200 + 25
= 250 m
catt :
direncanakan 1 buah kapal yang bersandar
Perhitungan kedalaman dermaga
Draf : 9,2 m
Kedalaman Dermaga = Draf + 0,1 x Draf
= 9,2 + 0,1 x 9,2
= 10,12 m
= 11 m
Hasil
No Elevasi Acuan Penaksiran LWS : -0,52
(m) HWS : 0,67
Highest High Water
1 HHWL
Level 0,82
Mean High Water Beda Timggi air pasang surut :
2 MHWS
Spring 0,67
Mean High Water t = 0,67 – (-0,52)
3 MHWL
Level 0,33 = 1,19 m
4 MSL Mean Sea Level 0,00
Mean Low Water
= 1,20 m
5 MLWL
Level -0,35
Mean Low Water
6 MLWS
Spring -0,52
Lowest Low Water
7 LLWL
Level -0,66
Elevasi Dermaga : t + ½ ( 1,2 )+Fb
: 1,2 +0,6+ 1,5
: 3,3 m
Denah
Potongan A - A
Potongan B - B
POTONGAN B - B
Perencanaan Plat Lantai Dermaga
Clx 21 8,988
Cly 21 8,988
1
Ctx 52 -22,256
Cty 52 -22,256
Clx 63 1,07856
Cly 13 5,564
5
Ctx 125 -2,14
Cty 79 -33,812
Clx 28 0,47936
Cly 28 0,47936
1
Ctx 68 -1,16416
Cty 68 -1,16416
d efektif = h – (selimut beton + ½ D tul.pokok + D tul. Bagi)
= 250 – 89
= 161 mm
n
TIPE PLAT ± 0,001*qu*^2l*C (N/mm) Mn Rn m ρ min ρ perlu ρ maax As As perlu tul dipasang
tulangan
8988000 11235000 0,43343235 15,686275 0,0035 0,00109 0,640641 563,50 113,04 4,985 D12 - 200
8988000 11235000 0,43343235 15,686275 0,0035 0,00109 0,640641 563,50 113,04 4,985 D12 - 200
-22256000 -27820000 -1,0732611 15,686275 0,0035 -0,00263 0,640641 563,50 113,04 4,985 D12 - 200
-22256000 -27820000 -1,0732611 15,686275 0,0035 -0,00263 0,640641 563,50 113,04 4,985 D12 - 200
1078560 1348200 0,05201188 15,686275 0,0035 0,00013 0,640641 563,50 113,04 4,985 D12 - 200
5564000 6955000 0,26831527 15,686275 0,0035 0,00067 0,640641 563,50 113,04 4,985 D12 - 200
-2140000 -2675000 -0,1031982 15,686275 0,0035 -0,00026 0,640641 563,50 113,04 4,985 D12 - 200
-33812000 -42265000 -1,6305312 15,686275 0,0035 -0,00395 0,640641 636,55 113,04 5,631 D12 - 150
479360 599200 0,02311639 15,686275 0,0035 0,00006 0,640641 563,50 113,04 4,985 D12 - 200
479360 599200 0,02311639 15,686275 0,0035 0,00006 0,640641 563,50 113,04 4,985 D12 - 200
-1164160 -1455200 -0,0561398 15,686275 0,0035 -0,00014 0,640641 563,50 113,04 4,985 D12 - 200
-1164160 -1455200 -0,0561398 15,686275 0,0035 -0,00014 0,640641 563,50 113,04 4,985 D12 - 200
PERENCANAAN BALK DERMAGA
Balok memanjang
yang direncanakan
PEMBEBANAN
BEBAN MATI PLAT
uraian KN/m2 Leq KN/m
Berat Plat sendiri 6 1,67 10,02
Berat finising lantai 1,1 1,67 1,837
Berat air hujan 0,5 1,67 0,835
qDL 12,692
BEBAN SENDIRI BALOK 7,02
BEBAN HIDUP 5 1,67 8,35
q Ult = 1,2 (DL) + 1,6 (LL) 37,0144