Professional Documents
Culture Documents
Sap
Sap
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
Klang also known as royal city because there was the palace
and a royal town located in Klang. Klang also had been known
as former capital state of Selangor from 1875-1880 than it
moves to Kuala Lumpur.Klang gain a status of the royal city
under the conference of the ruler (Majlis Raja-Raja or
DURBAR). The council comprise of nine ruler of Malay state.
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
VISION
To enhance South Klang as a well known heritage
and cultural attraction area in Selangor while
preserving the image of Royal Town by 2025.
MISSION
• Improving the city image of South Klang as
Royal Town
• Preserving the assets or royal, heritage,
and cultural in South Klang
• Improving the quality of local economy
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
DEVELOPMENT THRUST
Thriving Development
Develop Klang City Centre as an organized town centre with
magnificent and strong urban image
Sustainable Environment
To sustain the environment in order to achieve a balance between
built and natural environment
Self-sufficient Township
The town itself is well supplied and adequate of public facilities
and infrastructure to the community
Livable Community
Community active participate in the surrounding activity
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
ACTION ZONE
ACTION ZONE 1
TOWN REJUVENATION
ACTION ZONE 2
NATURE ENCLAVE
ACTION ZONE 3
ECONOMIC HUSTLE
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
CONCEPTUAL DEVELOPMENT
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
PHASE 2
PHASE 3
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
PHASE 1
TOWN REJUVENATE
2015-2018
AWANG MIMPI
Consultancy
SITE PROFILE DRAFT SPECIAL AREA PLAN – KLANG SELATAN
LOCATION : JALAN TENGKU
KELANA DEVELOPMENT PROPOSAL- BUILDING FACADE
AREA : LITTLE INDIA
DEVELOPMENT THRUST RATING
CURRENT ACTIVITY : COMMERCIAL
PROJECT IMPLEMENTATION THRIVING DEVELOPMENT
PROJECT DURATION :3 YEARS
PHASE :1(TOWN REJUVENATION) SUSTAINABLE ENVIRONMENT
AGENCIES :MPK SELF-SUFFICIENT TOWNSHIP
DEVELOPMENT MECHANISM
• REFURBISH BUILDING FAÇADE LIVEABLE COMMUNITY
• STANDARDISED BUILDING
BEFORE AFTER
COLOUR
JUSTIFICATION
• TO APPRECIATE THE OLD
BUILDING FAÇADE
• TO ATTRACT MORE VISITORS
• TO CREATE HARMONIOUS
ENVIRONMENT
• TO PRESERVE THE VALUE OF
HERITAGE IN LITTLE INDIA
AWANG MIMPI
Consultancy
SITE PROFILE DRAFT SPECIAL AREA PLAN – KLANG SELATAN
LOCATION : JALAN TENGKU
KELANA DEVELOPMENT PROPOSAL - BACK ALLEY
AREA : LITTLE INDIA
DEVELOPMENT THRUST RATING
CURRENT ACTIVITY : COMMERCIAL
PROJECT IMPLEMENTATION THRIVING DEVELOPMENT
PROJECT DURATION :3 YEARS
PHASE :1(TOWN REJUVENATION) SUSTAINABLE ENVIRONMENT
AGENCIES :KLANG MUNICIPAL SELF-SUFFICIENT TOWNSHIP
COUNCIL
DEVELOPMENT MECHANISM LIVEABLE COMMUNITY
• PROPOSE DOUBLE FAÇADE
BEFORE AFTER
JUSTIFICATION
• TO OPTIMIZE SPACE IN THE
BACK ALLEY
• ENCOURAGE SAFETY DUE TO
COMMERCIAL ACTIVITY
• AS A WAY TO RELOCATE
ILLEGAL STALL IN LITTLE
INDIA
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL -
DEVELOPMENT THRUST RATING
VACANT BUILDING
THRIVING DEVELOPMENT
SITE PROFILE
LOCATION : Jalan Raya Timur SUSTAINABLE ENVIRONMENT
AREA :Pre War Shop Lots
JUSTIFICATION SELF-SUFFICIENT TOWNSHIP
CURRENT ACTIVITY :-Commercial are
-19 Vacant buildings LIVEABLE COMMUNITY
1. THERE ARE 19 VACANT UNITS AT PRE WAR
LAND OWNERSHIP :Private ownership
SHOP LOTS.
2. UTILIZED ALL THE PRE WAR SHOP LOTS AFTER
BEFORE
PROJECT IMPLEMENTATION
3. STANDARDIZING THE COLOUR, BUILDING
PROJECT DURATION :3years
FAÇADE AND BUILDING HEIGHT.
PHASE :PHASE 1
4. PROVIDE PAVEMENT AREA ALONG THE SHOP
AGENCIES :Klang Municipal Council (MPK) 1
LOTS.
DEVELOPMENT MECHANISM
VACANT BUILDING RENOVATING
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL-SIGNAGE
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION : JALAN TENGKU KELANA THRIVING DEVELOPMENT
AREA : SHOPLOTS ALONG JALAN TENGKU
SUSTAINABLE ENVIRONMENT
KELANA(LITTLE INDIA)
CURRENT ACTIVITY :COMMERCIAL SELF-SUFFICIENT TOWNSHIP
PROJECT IMPLEMENTATION
PROJECT DURATION :3YEARS LIVEABLE COMMUNITY
PHASE : 1-TOWN REJUVENATION
AGENCIES :KLANG MUNICIPAL COUNCIL(MPK)
DEVELOPMENT MECHANISM
BEFORE AFTER
• BUILDING SIGNAGE STANDARDIZATION
JUSTIFICATION
• SIGNBOARDS SHOULD NOT BLOCK THE WINDOW ON THE
FACADE WALL
• SIGNBOARDS SHOULD NOT BLOCK THE DECORATIVE
AND DETAILS OF ARCHITECTURE
• SETBACK OF VERTICAL SIGNAGE MUST NOT EXCEED
MORE THAN 0.6METRE
• HEIGHT OF VERTICAL SIGNBOARD SHOULD NOT
EXCEED 0.5METRES FROM HEIGHT OF UPPER STOREY
• HORIZONTAL SIGNBOARD MUST FOLLOW THE PANEL
UNDER UPPER WINDOW LINE
• SIGNBOARD SHOULD BE PATTERN BY TRADITIONAL
CHARACTER.
• SIGNBOARD MADE FROM METAL ARE ALLOWED AND
MUST BE PAINTED IN ACCORDANCE WITH COLORS OF
DESIGN
• REAR LIGHTING OF SIGNBOARD (BACKLIGHTING) BY AWANG MIMPI
USING LEDs LIGHT IS ENCOURAGED
Consultancy
HERITAGE & CONSERVATION AREA DRAFT SPECIAL AREA PLAN – KLANG SELATAN
Not to scale
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN
Legend
one way street
two way street
Plot proposal
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN
Alan persisiran pantai (76 spaces) Royal Club Selangor (152 spaces)
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
PHASE 2
NATURE ENCLAVE
2018-2022
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN-KLANG SELATAN
PHASE 2
NATURE ENCLAVE
Project 1:
Introducing river
cruise
Project 2 :
Water taxi service
Project 3 :
Floating restaurant
Project 4 :
Lookout point
PROJECT 1: INTRODUCING RIVER CRUISE DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION :Klang river THRIVING DEVELOPMENT
ACREAGE : 0.4 acre(2 units)
CURRENT ACTIVITY : Undeveloped area SUSTAINABLE ENVIRONMENT
JUSTIFICATION
The river has a potential to be
developed as it offers a great view
overlooking the mosque and park
along the way
AWANG MIMPI
Consultancy
PROJECT 1: INTRODUCING RIVER CRUISE DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DESIGN ASPECTS
DEVELOPMENT THRUST RATING
DETAILS :
-Connects Taman Pengkalan Kampar and THRIVING DEVELOPMENT
Taman Pengkalan Batu
SUSTAINABLE ENVIRONMENT
-Stops for river cruise service.
SELF-SUFFICIENT TOWNSHIP
-Place for enjoying the view offered
by surrounding. LIVEABLE COMMUNITY
-Gazebos for people to rest and
enjoy the view
-Wooden railing
AWANG MIMPI
Consultancy
PROJECT 2: WATER TAXI SERVICES DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION :Klang river THRIVING DEVELOPMENT
ACREAGE :-
CURRENT ACTIVITY :Undeveloped Area SUSTAINABLE ENVIRONMENT
PROJECT IMPLEMENTATION SELF-SUFFICIENT TOWNSHIP
PROJECT DURATION :4 years
PHASE :2nd LIVEABLE COMMUNITY
AGENCIES :MPK
BEFORE AFTER
DEVELOPMENT MECHANISM
Providing a water taxi service for the
visitors to go to the floating restaurant.
JUSTIFICATION
As a new mean to transport people in the study
area serving the two points which are the
jetty and floating restaurant to ease the
mobility the tourists
AWANG MIMPI
Consultancy
PROJECT 3: FLOATING RESTAURANT DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION :Taman nearby Klang river THRIVING DEVELOPMENT
ACREAGE : 0.7 acre
CURRENT ACTIVITY :undeveloped area SUSTAINABLE ENVIRONMENT
DEVELOPMENT MECHANISM
Implementing a floating restaurant by facing
the river
JUSTIFICATION
To attracts tourists and give them a different
dining experience, overlooking a beautiful
scenery
AWANG MIMPI
Consultancy
PROJECT 4: LOOK OUT TOWER DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION :Klang river THRIVING DEVELOPMENT
ACREAGE :30 x 25 ft
CURRENT ACTIVITY :undeveloped area SUSTAINABLE ENVIRONMENT
DEVELOPMENT MECHANISM
Build an observation deck at the centre of the
park to view the surrounding scenery
JUSTIFICATION
Overlooking its surrounding including mosque,
jetty, bridge and park,to give the visitors
peaceful and comfort
AWANG MIMPI
Consultancy
PROJECT 5 : ART PARK DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION :Taman Bandar Diraja THRIVING DEVELOPMENT
ACREAGE :16 acres
CURRENT ACTIVITY :workout equipment area SUSTAINABLE ENVIRONMENT
DEVELOPMENT MECHANISM
Providing an art space to utilize the area
JUSTIFICATION
To offer a platform for the art enthusiasts to
express their talent and as an activity center
and for the visitors to enjoy the art
including the hardscape and softscape
AWANG MIMPI
Consultancy
PROJECT 6: look out tower DRAFT SPECIAL AREA PLAN – KLANG SELATAN
DEVELOPMENT PROPOSAL
DEVELOPMENT THRUST RATING
SITE PROFILE
LOCATION : Taman Bandar Diraja THRIVING DEVELOPMENT
ACREAGE :16 acre
CURRENT ACTIVITY : vacant park SUSTAINABLE ENVIRONMENT
DEVELOPMENT MECHANISM
Build an observation deck to view the
surrounding scenery
JUSTIFICATION
Overlooking Istana Alam Shah, to give the
visitors a viewing experience of the castle as
it is not a public visiting area
AWANG MIMPI
Consultancy
DRAFT SPECIAL AREA PLAN – KLANG SELATAN (BP4)
PHASE 3
ECONOMIC HUSTLE
2022-2025
AWANG MIMPI
Consultancy
PHASE 3 : ECONOMIC HUSTLE
PROJECT IMPLEMENTATION
SELF-SUFFICIENT
PROJECT DURATION :3 YEAR TOWNSHIP
PHASE :3-ECONOMIC HUSTLE
LIVEABLE COMMUNITY
AGENCIES :KLANG MUNICIPAL COUNCIL(MPK)
JUSTIFICATION
• To make the stadium become more interesting and
attractive
• Survey result found out that the demand of
futsal is highed in term of facilities.
• Can be serve as attraction and provide safety
provision.
AWANG MIMPI
Consultancy
PROJECT 2: NIGHT MARKET DRAFT SPECIAL AREA PLAN – KLANG SELATAN
PROJECT IMPLEMENTATION
SELF-SUFFICIENT
PROJECT DURATION :3 YEAR TOWNSHIP
PHASE :3-ECONOMIC HUSTLE
LIVEABLE COMMUNITY
AGENCIES :KLANG MUNICIPAL COUNCIL(MPK)
DEVELOPMENT MECHANISM
• Night market will be propose out side the stadium
BEFORE AFTER
in the parking space
• The night market is impermanent which is just
open at night.
• The size of night market is about 0.00034 acre
JUSTIFICATION
• To make the place lively at the night.
• To enhance the economy at the place
• To attract people to fully utilize the area
• To decrease crime at the place especially at
night
AWANG MIMPI
Consultancy
PROJECT 3: BUS LAYBY DRAFT SPECIAL AREA PLAN – KLANG SELATAN
PROJECT IMPLEMENTATION
SELF-SUFFICIENT
PROJECT DURATION :1/2 YEAR TOWNSHIP
PHASE :3-ECONOMIC HUSTLE
LIVEABLE COMMUNITY
AGENCIES :KLANG MUNICIPAL COUNCIL(MPK)
DEVELOPMENT MECHANISM
• Bus lay-by will be propose in front of the SK.
BEFORE AFTER
Klang
• Propose to replace the existing bus stop that
located across the road of SK. Klang
• The dimension of bus lay-by is (6m x 45m)
JUSTIFICATION
• To solve traffic jam in front of the school
• Ease the student to take a bus because the
existing one they need to cross the road.
• To produce a safety pLace for the student.
AWANG MIMPI
Consultancy
PROJECT 4: BRIDGE RESTAURANT DRAFT SPECIAL AREA PLAN – KLANG SELATAN
PROJECT IMPLEMENTATION
SELF-SUFFICIENT
PROJECT DURATION :3 YEAR TOWNSHIP
PHASE :3-ECONOMIC HUSTLE
LIVEABLE COMMUNITY
AGENCIES :KLANG MUNICIPAL COUNCIL(MPK)
DEVELOPMENT MECHANISM
• Pedestrian bridge will be propose at the road in
BEFORE AFTER
front of MPK
• The size of the pedestrian bridge is about 0.25
acre
• Propose with the restaurant in the bridge (bridge
restaurant)
JUSTIFICATION
• To create economy income while connecting land
uses
• Make people tend to walk to city center
• Create restaurant on the bridge to in order to
revitalize the area at days and night time.
• To decrease crime at the place especially at
night
AWANG MIMPI
Consultancy