You are on page 1of 16

Presentation

DATABASE & TRAFFIC


MEASUERMENTS
Magdy Elmasry
AGENDA

• EXPERAIANCE
• SKILLS
• ACHIVEMENTS
• VISION
EXPERIENCE

• MANGER OF THE SECOND ADMINISTRATION OF


GHARBIA 2017.
• MEMBER OF IP CORE TEAM
• HEAD OF DEPARTMENT OF TDM & NGN ENGINEER
2011 2017.
• FIELD NETWORK ENGINEER 2004 2009.
SKILLS

• Work under pressure


• Team working
• Best use of resources
• Crises management and finding up normal solutions
• Flexibility and accept the others opinions
• Deep analysis and finding root cause of problems
• Achievement of shared goals
ACHIVEMENTS

• SERIOUS & URGANT


• TECHNICAL SUPPORT
• LACK SPARE PARTS & OPERATION
PROBLEM
SERIOUS & URGANT

 ABO KIBEER SITE OUT OF SERVICE 50K (ENG\


M.MOSLEH) 2015.
 SHIBEN ELKOM SITE 10K SUBSCRIBER OUT OF
SERVICE( ENG\ M.MOSLEH & ENG\ SAMIER).
 ABOKEEBIER 6 SUBSCRIBER UNIT ISOLATED MORE
THAN 20K (REWARDED FORM CHIEF SECTOR) 2010
TECHNICAL SUPPORT

 NUMBERING CHANGE FOR DAKAHLIA (ENG\ M.MOSLEH & ENG\


SAMIER)
 EL HOWAMDIA SITE ONE BRANCH OUT OF SERVICE (ENG\ SAMIER ).
 AWAYID1 SITE SERVICE INTRUPTION.
 MATROUH REMOTE SITE ISOLATION.
 MANSOURA WEST SITE ACCESS UINT PROBLEM.
 SHIBEN ELKNATR SITE MATRIX AND ALARM BUS.
 ELECTRICTY COMPANY DIGITAL SUBSCRIBER OUT OF SERVICE.
 ZIFTA SUPERVISION STATION PROBLEM.
 TANTA1 SITE ALARM BUS PROBLEM.
 NUMBERING CHANGE IN GHARBIYA REGION.
 NUMBR PORTABILITY.
LACK OF SPARE PARTS & OPERATIONS
PROBLEMS

 EL BATANON SITE MIGRATION


 3 LUCENT EXCHANGE (VCDX) MIGRATION
 PARTIAL MIGRATION ON ANOTHER TDM
UNITS(5 CSN)
Grateful Letters
‫‪Data base Administration‬‬

‫اداره البيانات و‬
‫قياسات الحركه بوسط‬
‫الدلتا‬

‫مركز المعلومات و‬ ‫مركز جوده الخدمه و‬ ‫مركز تحليل البيانات‬ ‫مدير مركز تشغيل‬
‫دعم اتخاذ القرار‬ ‫قياسات االحمال‬ ‫و المعلومات‬ ‫البيانات‬
‫”“‬ ‫”“‬ ‫”“‬ ‫”___“‬
VISION

• GOOD DATABASE RIGHT DECISION


• DATABASE & ARCHIVING SYSTEM
IDEL DATABASE PREFECT
DECISION
 GENERAL HUMAN RESOURECS STUDY
1- How to face shortage and needs
2- Analysis of each person capabilities
3- Needed training courses
 IMPROVE REPORTING SYSTEM
1- unified report modeling
2- unified periodic reports
 HARDWARE STUDY
1- Service stability
2- Reduce problems cause & corrective time
3- Improve network utilization
4- Follow up corrective maintenance
5- Crises plan
 IMPROVE GENERAL ADMINISTRATION PERFORMANCE
1- Analysis of each administration performance (KPI)
2- Ticketing review with suppliers
3-studing and auditing contract
DATA BASE & ARCHIVING SYSTEM
VISION
• AUTOMATE ALL GENERAL ADMINISTRATION
AFFAIRS
• CREATE DATABASE FOR
1-Administartive business
2-Technical
3-Spare parts
4-Preventive maintenance
5-Technical support report problems
• PROVIDING INFORMATION SERVICES
Appendix
Database Program for MSAN
THANKS

You might also like