Professional Documents
Culture Documents
www.huawei.com
BSC6900 Deployment
Common Faults
Software version
License
Network design
RF database
MML configuration
Acceptance test document
Abis A
Ater
SGSN
Gb
1. Abis interface
How many BTS? => How many Abis interface board (EIUa/OIUa) t
o install? => How many BM subrack to install?
2. Ater interface
How many Ater resources to support?
=> How many Ater interface board to install?
How many Ater Signaling to support?
3. A interface
How many A resources (CICs) to support?
=> How many A interface board to install?
How many A Signaling to support?
Which A Signaling type will be used? 64K C7 or 2M HSL?
4. Gb interface
Gb over FR => Which board will support? (PEUa)
Gb over IP => Which board will support? (FG2a)
1. CS Control plane : manage the user plane resources, control plane reso
urces, transmission resources and process service on control plane of the
system. Supporting 270 TRXs, 270 cells, 270 BTSs, and
Processing capability of the main
492,000 Max equivalent BHCAs (Busy Hour
control XPUa board
Call Attempts)
Supporting 360 TRXs, 360 cells, 360 BTSs, and
Processing capability of the non-
656,000 Max equivalent BHCAs
main control XPUa board
2. CS User Plane: processes GSM voice services and GSM data services.
Supporting 960 TCH/Fs; supporting 3,740 IWF
Processing capability
flow numbers
BSC6900 Deployment
Common Faults
BSC6900 Deployment
Common Faults
2. Root cause: Frame structures are not matched with peer device
2. Root cause: There are some optical ports have TX power, but
don’t have RX power or vice versa.