Professional Documents
Culture Documents
IATMI 18-095 Revolusiner Best Practice Infill Placement Strategy in High Water Cut Production Area To Recover More Reserve Case Study of Mature Fields, WK PHE
IATMI 18-095 Revolusiner Best Practice Infill Placement Strategy in High Water Cut Production Area To Recover More Reserve Case Study of Mature Fields, WK PHE
phe.pertamina.com
Phe.pertamina.com
phe.pertamina.com Padang, 1-3 October 2018
Presentation Outline
Overview
Currently Mature Field Issues (WK PHE)
Revolusioner Best Practice: Infill Placement Strategy
Case Study of PHE Field: ZAMZAM Field
Conclusion
phe.pertamina.com
Phe.pertamina.com
Overview
MAP, 2016
Recover more
Reserve (RF)
Production
Achieve
Reduce Water
Target
tegy
c ement Stra
fill Pl a
Cut
In
phe.pertamina.com
Phe.pertamina.com PHE Program for 2019
Currently Mature Field Issues (WK PHE)
phe.pertamina.com
Phe.pertamina.com
Revolusioner Best Practice: Infill Placement
Strategy
SURVEILLANCE
1. Re-organize database
2. Fluid character checking
3. Production plotting in depth map
4. Iso-water cut mapping
5. Fluid performance investigation
6. Well history analysis
7. M-Bal vs In-Place balancing
We are here
9. Production juxtaposition / cross section analysis
RE-MAPPING
Pepi Sahal M, 2018
phe.pertamina.com
Phe.pertamina.com
CASE STUDY OF PHE MATURE FIELDS
- ZAMZAM Field: High water cut paradigm to low water cut un-drain
phe.pertamina.com
Phe.pertamina.com
ZAMZAM Field: Inventory the issues
phe.pertamina.com
Phe.pertamina.com
ZAMZAM Field: Well Placement Strategy
• Big OOIP from in-house study and confirmed by static and reservoir simulation
• As heavy oil field and have high viscosity oil character
• Zonation in carbonate ZAMZAM is divided into 5 zone. Zone 1 (upper part) as good oil pay and much remaining reserve
• The reservoir heterogeneities in carbonate ZAMZAM was divided into 8 RRT (reservoir rock typing). Good RRT is RRT-1 until RRT-4
• Proven than water source come from bottom through vuggy connectivity, RRT-5 until RRT-6 and edge water. No Fracture issue!
• There are un-drain area in between high water cut existing wells (5 proven and 48 infill wells candidate opportunity)
phe.pertamina.com
Phe.pertamina.com
ZAMZAM Field Drilling Result
Proven!
phe.pertamina.com
Phe.pertamina.com - Any un-drain area in between high water cut existing wells
- Get zero WC and many infill wells candidate (48 wells)
Conclusion
Currently mature field issues in WK PHE are high water cut, commingle multi-zone, recovery factor
(remaining reserve area) and production below target
The revolusioner best practices before extra effort to recommend survaillance dan re-mapping are:
1. Re-organize database
2. Fluid character checking
3. Production Plotting in Depth Map
4. Iso-water cut mapping - Art of engineer creativity
5. Fluid performance investigation - Journey of experience
phe.pertamina.com
Phe.pertamina.com
ACKNOWLEDGEMENTS
The authors wish to thank the respective management of Director Development (Mr.
Afif Saifudin) dan VP Subsurface Development (Mr. Rahmat Wijaya) for permission to
publish this work and Subsurface Development Team – PHE Holding for your support.
Acknowledgments are also given to the AP PHE for their data to the outcome.
phe.pertamina.com
Phe.pertamina.com