SETTLEMENT OF SHALLOW
FOUNDATION
SHALLOW FOUNDATION
Topic:
• General
• Immediate Settlement
• Consolidation Settlement
GENERAL
This course will focus at immediate and primary consolidation settlement only.
IMMEDIATE SETTLEMENT
IMMEDIATE SETTLEMENT
– Average Se
B.q o
Es
1 s2 av
1 1 m 2 m 1 m 2 1 L
ln m. ln
; m ; H=
1 m 2 m 1 m 2 1
B
• Rigid Foundation
Se
B.q o
Es
1 s2 r
Es = Modulus of elasticity of soil
B = Foundation width L = Foundation length
IMMEDIATE SETTLEMENT
IMMEDIATE SETTLEMENT
Se
B.qo
2 1 s F1 1 s 2 s F2
1 s
2 2
(corner of rigid foundation)
Es 2
Se
B.qo
Es
1 s2 1 s2 F1 1 s 2 s2 F2 (corner of flexible foundation)
The variations of F1 and F2 with H/B are given in the graphs of next slide
IMMEDIATE SETTLEMENT
IMMEDIATE SETTLEMENT
EXAMPLE
Problem:
A foundation is 1 m x 2 m in plan and carries
a net load per unit area, qo = 150 kN/m2.
Given, for the soil, Es = 10,000 kN/m2, s 0.3.
Assuming the foundation to be flexible,
estimate the elastic settlement at the center
of the foundation for the following conditions:
a. Df = 0 and H =
b. Df = 0 and H = 5 m
EXAMPLE
Solution:
Part a.
Se
B.q o
Es
1 s2
Se
(1)(150)
10,000
1 0.32 (1.53) 0.0209m 20.9mm
Part b.
Se
B '.qo
Es
1 s2 1 s2 F1 1 s 2 s2 F2
Se
(0.5)(150)
10,000
1 0.32 1 0.32 (0.638) 1 0.3 2(0.3) 2 (0.033) x 4 0.0163m 16.3mm
IMMEDIATE SETTLEMENT
1
1 M2 1 M2 N2
M M2 1 1 N2 H
F1 M . ln
M 1 M N 1
2 2
ln
M M N 1
2 2
N
B'
L B
At the center of Foundation L' B' and F1 time by 4
2 2
At the corner of Foundation L' L B' B and F1 time by 1
IMMEDIATE SETTLEMENT
z2
Iz
S e C1 .C 2 q q z
0 Es
where:
– Iz = factor of strain influence
– C1 = correction factor to thickness of embedment
foundation = 1 – 0.5x[q/(q-q)]
– C2 = correction factor due to soil creep
= 1+0,2.log(t/0,1)
– t = time in years
– q = stress caused by external load
– q = . Df
IMMEDIATE SETTLEMENT
Young Modulus
Depth z Es Iz Iz
z
Es
(m) (m) (kN/m2) (average) (m3/kN)
0.0 – 1.0 1.0 8000 0.233 0.291 x 10-4
1.0 – 1.5 0.5 10000 0.433 0.217 x 10-4
1.5 – 4.0 2.5 10000 0.361 0.903 x 10-4
4.0 – 6.0 2.0 16000 0.111 0.139 x 10-4
1.55 x 10-4
q 17.8 x1.5 t 5
C1 1 0.5 1 0.5 0.9 C2 1 0.2. log 1 0.2. log 1.34
q q 160 17.8 x1 .5 0.1 0. 1
2B
Iz
S e C1.C2 . q q .z
0 Es
S e (0.9)(1.34)(160 17.8 x1.5)(1.55 x10 4 )
S e 24.8mm
CONSOLIDATION
SETTLEMENT
CONSOLIDATION SETTLEMENT
• Normal Consolidation
pc po pc Cc p o p
or 1 Sc .H c . log
po 1 eo po
• Over consolidation
p c p o or pc
1
po
po + p < pc Cs p p
Sc .H c . log o
1 eo po
Cs p Cc p p
po < pc < po+p Sc .H c . log c .H c . log o
1 eo p o 1 eo pc
CONSOLIDATION SETTLEMENT
where:
– eo = initial void ratio
– Cc = compression index
– Cs = swelling index
– pc = preconsolidation pressure
– po = average effective pressure on the clay layer before the construction of
the foundation
= ’.z
p = average increase of pressure on the clay layer caused by the
foundation construction and other external load, which can be determine
using method of 2:1, Boussinesq, Westergaard or Newmark.
Alternatively, the average increase of pressure (p) may be approximated
by:
1
p pt 4pm pb
6
pt = the pressure increase at the top of the clay layer
pm = the pressure increase at the middle of the clay layer
pb = the pressure increase at the bottom of the clay layer
CONSOLIDATION SETTLEMENT
EXAMPLE
Cc p o p
Sc .H c . log
1 eo po