• NALCO is a navaratna CPSE under Ministry of Mines, Govt. of India which was
established on 7th jan.1981.
• The company has a 68.25 lakhs TPA bauxite mines band 22.75 lakh TPA alumina
refinery located at Damanjodi in Koraput.
• A 4.60 lakh TPA aluminium smelter and 1200 MW captive power plant at
Angul,Odisha.
• It is the first company in aluminium company in aluminium sector in the country to
venture into International market in London Metal Exchange since May 1989.
CAPTIVE POWER PLANT
• It refers to the generation from a unit set up by the industry for its exclusive from
a unit set up by industry for its exclusive consumption.
• It has a capacity of 1200 MW. It provides electric power requirement of
aluminium smelter. It also feeds approx 35 MW to alumina refinery through state
grid.
• It is located at Angul, with supply of coal from Mahanadi Coal Fields, Talcher and
with the help of 18.5 km captive railway system. The water is drawn FROM RIVER
Brahmani through 75KM long triple circuit pipeline.
SUMMARY OVER THE
INDUSTRIAL TRAINING
• BOILER
• TURBINES
• COAL HANDLING PLANT
• DM AND COOLING PLANT
• SWITCH YARD
BOILER
• This cycle is the main cycle,where the main purpose is to generate steam.
• It starts from Drum to the condenser.
• The water and the coal is supplied to the boiler as a feeder from mills and drums.
• Then, through various heat exchanger the temp along with the pressure of the
water is maintained.
• The powdered coal is thrown into the boiler from different direction at the high rate
• In the end, the steam is produced to run up the turbines.
TURBINES
A. High pressure turbines
B. Intermediate Pressure turbines
C. Low Pressure Turbines
Crusher Conveyer
• The coal which is received arev (100mm) • This is the main part of each and every plant
roughly in size. • In CHP, the first of all its work is to sent off the coal
• The main work of the crusher is to crush it to to the unloading bay from track unloading bay
from track hooper.
the (20)mm in size.
• The coal is shifted to crusher from the • Secondly, it transfers coal from unloading Bay to
the crusher.
unloading bay through conveyer.
• Then, it is sent off to the mills of each unit as per
the requirement.
C. Captive Railway System
A. DM PLANT
• De mineralised plant purpose the work of de mineralising the water from
the river.
• It follows major two steps
i) Pre- treatment Plant
ii) Post – Treatment Plant
Pre treatment plant
• It contains 5 intake pump house with large raw water reservoir.
• A stiling chamber to settle down the water and chlorines for chlorinization.
• Clarificulator process is done for maintain pH (6.8 to 7.8)
• Total pumps
CTMP – 6
ESP – 4
SWP- 3
• Sand filter used filter out tiny impurities
• Then,different bays to take the output to plants and township
Post Treatment Plant
• The main work of the plant is to add and remove cations and anion which all
are required
• Then the water after treatment is stored and will be sent off to the boiler
plant of the plant as per the requirement
• The following diagram shows various stages of the treatment.
Cooling water Plant
Cooling Tower CW Pump
• Each cooling tower has around 4 units under it. • The main purpose of CW pumps in plant is to
condense the extra low pressure steam which
• The main purpose is to cooling down the hot
inturns improves the efficiency of the plant.
water and then recycle it to the plants.
• If incase, it has to dispose it maintains the • CW pumps inject raw water into the tubesof
condenser where hot steam flows outside
temp of water without harming the natural
these tubes.
water
ACW Pump
• The main purpose of the Auxiliary cooling water pump that keeps the circulation of water in the colder side
of the plate heat exchanger.
• It extracts heat from the water dumped into the cooling tower for cooling.
• Fresh water is drawn from the cooling tower basin again through ACW pumps.
• The plant has CWP pumps – 15
ACW pumps- 1 to 6
• Each unit has
1. CW pumps
2. ACW pumps
3. HP pumps
4. Safety pumps
SWITCH YARD
LOAD DISTRIBUTION BREAKER
• At the whole production, CPP provides upto • A circuit breaker is an automatically operated
750MW normally to its smelter plant electrical switch designed to protect an
electrical circuit from damage caused by
• The work of the switch yard is to drop down
excess current from an overload or short
and up the voltage as per the requirement
circuit.
• The rest output is given to the grid and used
• As we know fault current is very high and
for the self purpose
during interruption of huge current. There
would be large arcing inbetween switching
contracts. So as circuit breaker is used
THANK YOU