Professional Documents
Culture Documents
21 September 18
© 2012
2013 Weatherford. All rights reserved. 2
What is a Liner?
Debris Centralizers
barrier
PBR Darts
Packer
actuator
Running Landing
Liner tool collar
-top
packer Cement
pack-off
Joint
system Setting
Float ball
Liner collar
hanger
Ball seat
with pack-off
Float
shoe
Plugs
© 2012
2013 Weatherford. All rights reserved. 4
Liner Hanger Systems – Why Run a Liner?
© 2012
2013 Weatherford. All rights reserved. 5
Liner Hanger Systems - Product Offering
© 2012
2013 Weatherford. All rights reserved. 6
Liner Hanger System – PBR’s and Seal Stems
Unitized body
© 2012
2013 Weatherford. All rights reserved. 8
Liner Hanger Systems – “C” Series
© 2012
2013 Weatherford. All rights reserved. 9
Liner Hanger Systems - “P” Series
© 2012
2013 Weatherford. All rights reserved. 10
Liner Hanger Systems - SwageSet HPHT
© 2012
2013 Weatherford. All rights reserved. 12
Liner Hanger System – Setting Sleeve
Replaces Packer
Same castellation pattern as packer
Same running tool profile as packer
• 300◦F
• 300◦F • 400◦F
• 7,500 psi
• Up to • Up to
• V3 7,500 psi 15,000 psi
• Not • V3 - V0 • V0
rotatable
• Rotatable • Rotatable
• High
circulating
rates
Performance
© 2012
2013 Weatherford. All rights reserved. 14
Liner Hanger System – Hanger Review
• Recessed • High
• Single or slips
tandem pressure
cone • Larger by- • No ports or
• With or pass area cylinder
without • Higher load • Recessed
bearing capacity slips
• Hydraulic or • With or • With or
mechanical without without
• No drill-in bearing bearing
• Rotatable • High load
• Select capacity
sizes rated • Rotatable
to V0
Performance
© 2012
2013 Weatherford. All rights reserved. 15
Liner Hanger Systems - Rental Tools
© 2012
2013 Weatherford. All rights reserved. 16
Running Tools – Debris Protection
“R” “HNG”
“S”
Right-hand
rotation Left-hand
release secondary
release
• Locates in packer
body
External seal to PBR ID • Seals running
tools to liner top
Lock ID and slick
dogs stinger OD
Connects to landing string • Pull release
Releasing sleeve
• Locates in PBR
• Seals service tool OD
to liner top ID Connection
for stationary joints
• Pull release
© 2012
2013 Weatherford. All rights reserved. 19
Running Tools – Jointed System
• Optimized
hydrodynamics
• Welded or non- • Swellable • High side load
welded element seals resistance
• Close tolerance
• High restoring casing clearance microannulus • Designed side
forces improve • High restoring force yield
• Bows recess
stand-off thru restrictions forces • Smooth design
• High loading • High loading reduces
• Sub specs same “sledding” effect
capacity as casing capacity
© 2012
2013 Weatherford. All rights reserved. 25
Liner Hanger Systems – Value Added Support
Eccentric nose
SurgeMod
Drill Shoe
Tungsten
carbide cutting
structure
Nozzle ports
PDC drillable
after cementing
© 2012
2013 Weatherford. All rights reserved. 26
Liner Hanger Systems – Cementing Heads
© 2012
2013 Weatherford. All rights reserved. 28
Liner Hanger Systems - Reliability Improvement
Standardized Procedures:
• Statement of Requirements (SOR)
• Manufacturing quality plans
• Assembly and test work instructions
• Installation work instructions
• Post-job evaluation
© 2012
2013 Weatherford. All rights reserved. 29
Liner Hanger Systems – Global Footprint 2012
ABERDEEN
MOSCOW
CALGARY
GENEVA
HOUSTON
MEXICO CITY
DUBAI
KUALA LUMPUR
2012
2012
-- Over
Over 1000
1000 liner
liner
support locations
support locations
-- 44 Liner
Liner Hanger
Hanger
manufacturing
manufacturing plants
plants Weatherford locations
Regional offices
Corporate headquarters
© 2012
2013 Weatherford. All rights reserved. 31
USA - Huntsville, TX Global Support Center
Manufacturing and
sustaining engineering
Training Center
© 2012
2013 Weatherford. All rights reserved. 32
Huntsville, TX – Manufacturing Facility
Machine Shop
© 2012
2013 Weatherford. All rights reserved. 33
Huntsville, TX - Training Center
© 2012
2013 Weatherford. All rights reserved. 35
Canada – Edmonton Manufacturing Facility
• 52,000 sq ft of
assembly area
• Primarily serves
Canadian
market
• ISO 9001:2000
© 2012
2013 Weatherford. All rights reserved. 36
UAE – Abu Dhabi Service Center
Manufacturing, Technology and Training Center opened in 2010
• 320,000 sq ft manufacturing space
• Regional research, development and engineering support
• State-of-the-art regional training center
© 2012
2013 Weatherford. All rights reserved. 37
UAE – Abu Dhabi Manufacturing (ADM)
• ADM supports EH operations and provides
component parts to other plants
• ISO 9001
• API 5CT, 6A, 7-1 11D1, 14A, 14L
© 2012
2013 Weatherford. All rights reserved. 38
UAE Abu Dhabi Training Center
Provides region personnel with
technical training required by the
global competency assurance Driller
process Console
© 2012
2013 Weatherford. All rights reserved. 40
Liner Hanger Systems – Growth thru Acquisitions
• Nodeco – Norwegian Drilling Equipment Company
– Created as a Brown Oil Tools Agent
– 1984 Formed own Liner Hanger Product Line
– Acquired by Weatherford 1995
• EVI – Acquires Weatherford 1997
– Retains Weatherford name
– Combines Nodeco Hangers with ATI Hanger Product Line
– Brings Nodeco to the GOM
• Weatherford Acquires Cardium 1999
– Cardium Canadian based international completion company founded
in1956
– Worldwide liner hanger market since 1986
• Other acquisitions
– Bestline, Engimac, Midway, SanEloy
© 2012
2013 Weatherford. All rights reserved. 41