Alternatives

Alternative 1;
System delivered in 2 phases

Alternative 2;
System delivered in 1 phase

© 2015 Fjords Processing 08/04/2020 Slide 1


Alternative 1

Delivered in phase 2 when water cut Delivered in phase 1 when feed is


increases oil-continuous

FWKO DEGASSER/CEC TREATER

© 2015 Fjords Processing


Considerations Alternative 1

• Retention time presented is minimum values and are often


much longer
• Internals installation in Degasser/CEC through manway
• Degasser will remove bulk gas upstream CEC in phase 1
• Degasser has no function in phase 2 when FWKO is installed
as FWKO will remove gas

© 2015 Fjords Processing


Alternative 1: Phase 1, Degasser/CEC/Treater
3700 mm

12570

13570
14000
0
5000

3560 mm
0

13500
12510
1500
2000

DEGASSER/CEC TREATER: 3.6 x 14 m


3.7 x 5 m

• Sized on Base case 100,000 BOPD


• Oil retention time > 5 min
• Water retention time > 3 min
© 2015 Fjords Processing
Alternative 1: Phase 2, FWKO

12610

13570
14000
0

2960

3560 mm
13500
12510
1500
2000

FWKO: 3.6 x 14 m

• Sized for Future Case with 142,500 BWPD and 7,500-100,000 BOPD
• Oil retention time > 3.5 min
• Water retention time > 5 min
© 2015 Fjords Processing