DNO RISK ASSESSMENT MATRIX PROBABILITY

Very Unlikely Unlikely Probable Likely Very Likely


EVENTS PER YEAR 10‐5 10‐4 10‐3 10‐2 10‐1 10 Menu +
Instruction
Has happened at the  Has happened or is 
location more than  likely to happen several 
Health & Safety Extremely unlikely but 
Has happened several 
Has happened in the 
once a/o several times  times at the location in 
Environment & Sustainability Asset Reputation has occurred in the 
times in the Industry
Organisation and/or is 
in the organisation a/or  a year a/o is the cause 
People  Industry common in industry
is a common occurrence  of incidents in industry 
in industry multiple times per year

P E A R 1 2 3 4 5
International public concern. Extensive adverse 
Catastrophic

Widespread and permanent ecological damage.  Business ceases to operate or may continue to operate 
attention in the national and international media.  Quarterly risk review 
Multiple fatalities. Permanent  Significant contribution to regional environmental  with substantial damage and disruption leading to 
International /national political concern with  of all risks at this 
5 disabilities and / or irreversible  decline. Significant remediation effort required over  losses > $100m (replacement plus deferred revenue) (or 
restrictive measures and/or impact on grant of  5 8 9 10 11 12
consequence level as 
health effects (>=3). period > 1 month. Sustained commitment to  from civil a/o criminal litigation). Irreparable damage to 
licenses. International mobilization of action 
remedial efforts for ecology and resource recovery. supplier and customer relationships.
groups.
part of MAH process

Severe lasting ecological damage to immediate  Business continues to operate but with major damage  National public awareness and concern. Extensive 


vicinity. Widespread impact with major contribution  and disruption leading to losses of between $10m and  adverse attention in the national media. 
Major
CONSEQUENCE / IMPACT

Fatal injury. Permanent disabilities  to regional environmental decline. Major mitigation  $100m (replacement plus deferred revenue or from civil  Regional/national political concern with 


4 and/or irreversible health effects (<3). effort required over a period of 1 month. Potential  a/o criminal litigation) . Significant damage to supplier  potentially restrictive measures and/or impact on  4 6 7 8 10 11
remediation efforts required to assist natural  and customer relationships which can be overcome over  grant of licenses. National mobilization of action 
ecological recovery. time. groups.

Business continues to operate but with moderate  Regional public awareness and concern. Extensive 
Significant

Significant injury with work absence 
Uncontained or sustained release impacting on the  disruption leading to losses of between $1m and $10m  adverse attention in local media and contact from 
(LTI). Partial permanent disability. 
3 Significant but reversible health 
immediate vicinity. Limited damage which is easily  (replacement plus deferred revenue) (or from civil a/o  pressure groups. Slight national media and/or  3 3 5 6 8 10
remediated over a short term. criminal litigation) . Some damage to supplier and  local/regional political attention. Adverse stance of 
effects with work absence.
customer relationships which is quickly overcome. local government and/or action groups.

Business continues to operate but minor damage short‐ Some local public awareness and concern. Some 
Minor Injury (RWC) or minor / short  Localised minimal impact on ecosystem. Any 
Minor

lived disruption to operation resulting in revenue losses  media and/or local political attention. Some local 
2 term reversible health effect affecting  reduced environmental quality is short lived with no 
between $100k and $1m or negative impact on  government interest. No National Government  2 2 3 4 6 7
work performance. remedial effort required.
relationships. interest.
Minimal

Negligible injury effect (FAC/MTC).  Business continues to operate with negligible  Public awareness may exist, but there is no public 


Little or no known impact on ecosystem. Contained 
1 Negligible health effect not affecting 
locally with no remediation required.
disruption.  Insignificant damage or loss of systems less  concern. Limited local media and pressure group  1 1 2 3 4 6
work or causing disability. than $100k interest. No National or Local government interest.