100% found this document useful (1 vote)
871 views1 page

Process Turtle Diagram - Assignment Engineering

This process turtle diagram outlines the risks, opportunities, resources, personnel, inputs, business process, outputs, suppliers, methods, responsibilities, and measures/controls for a construction workshop. Key risks include heavy rains slowing construction, safety hazards, and poorly written contracts. Resources needed are construction materials, heavy equipment, and labor. The civil engineer and construction health and safety program manager are responsible for ensuring the mini, medium, and large retail outlets are built according to design plans and meet standards. Compliance, cost control, and construction scheduling are used to measure progress.

Uploaded by

Shara Jane Delmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
871 views1 page

Process Turtle Diagram - Assignment Engineering

This process turtle diagram outlines the risks, opportunities, resources, personnel, inputs, business process, outputs, suppliers, methods, responsibilities, and measures/controls for a construction workshop. Key risks include heavy rains slowing construction, safety hazards, and poorly written contracts. Resources needed are construction materials, heavy equipment, and labor. The civil engineer and construction health and safety program manager are responsible for ensuring the mini, medium, and large retail outlets are built according to design plans and meet standards. Compliance, cost control, and construction scheduling are used to measure progress.

Uploaded by

Shara Jane Delmo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPTX, PDF, TXT or read online on Scribd
  • Process Turtle Diagram

Process Turtle Diagram – For Workshop

RISKS & OPPORTUNITIES


Slow construction due to heavy rains,
RESOURCES Safety hazards, Poorly written PERSONNEL
contracts, Increase in material costs,
Construction and Unknown site conditions, Labor Civil Engineer, Construction
Measuring Materials, shortage, Damage to equipment Health and Safety
Heavy Equipment, Program (CHSP) , DOLE
Manpower/Labor Accredited BOSH/COSH Training

INPUTS BUSINESS PROCESS OUTPUTS


Layout/Building Plan, Visual Site BEING AUDITED
Mini Marz, Medium Marz &
Inspection Report, Quotation, Large Marz that conforms to
SUPPLIERS Contracts per Contractors, Permits CUSTOMERS
ENGINEERING Facility Design of a Standard
prior to Construction (ECC), LPP Retail Outlet
Municipal Requirements (Building
DEPARTMENT
FROM Permit) NEXT
ANOTHER
PROCESS
PROCESS

METHODS MEASURES / CONTROLS


Compliance of Facility Quotation Form, Cost Control,
Design with PNS/DOE FS Construction Gantt Chart,
10:2017 & Compliance of RESPONSIBILITIES
Punch-listing, Construction
Construction with ECC Site Engineer, Contractor, Updates, Repairs and
Conditions Boom Truck and Backhoe Maintenance
Operator

RISKS & OPPORTUNITIES
RESOURCES
PERSONNEL
SUPPLIERS
CUSTOMERS
INPUTS
BUSINESS PROCESS
BEING AUDITED
OUTPUTS
METHODS
RESPONSIB

You might also like