B. Management conditions
Equipment conditions and maintenance
practices
Skills of work force and management
Planning, supervision and coordination of
work.
1.25
1.0
0.90
Loose: Vl
Loose cubic yards (LCY)
Density L Lb/LCY
Compacted: Vc
Compacted cubic yards (CCY)
Density C LB/CCY
Loose density
Load factor = Bank density
2’-0”
or more Angle of Repose
Prof Awad S. Hanna
For Sloping Sides of Excavation
ls
oi
eS
s
g
vel
ra
g. ve
De Gra
De or A
)
(63 ular
g.)
(4 pe f
d
an
Solid Rock, Slate or Cemented Sand and Gravel
1 : Sl o
Sa n
g
S
5
rp . )
1/2 d An
a ose
ed
Sh Deg Lo .)
1
d
d
en
d
e
e
:1
ct 33 de eg
act
oun 26 D
m
pa :1 (
m
mp
m ll R (
Co 1 1/2
co
Original We 2:1
Re
Co
Ground Line
(90 Deg.)
78
80
86
88
84
82
82
80
300'
84
l
Fil t
86
Cu
88
A B C D E F
100' 100' 100' 100' 100'
500'
78.5
Sec. A’- A 78
76
82
78
84
80
86
88
90
78.5
78
77
193 x 1.8
76.7 Area = = 173.7
2
76
Section A’- A
80.3
80
79
210 x 1.8
76.7 Area = = 189.0
2
78
Section B’- B
Sect ion Emb (CCY) Exc. (BCY) Exc. x B/C Net Exc. Cum Exc
(CCY) (CCY) (CCY)
A-B 6 72 224 254 - 418 - 418
B-C 56 7 441 49 9 - 68 - 48 6
C-D 215 79 1 8 96 681 19 5
D-E 0 10 31 116 7 116 7 136 2
E-F 0 1222 138 4 138 4 2746
A B C D E F
87.6 88.6 89.4 90.4 91.6 93.2 94.3
G H J K L M
87.4 88.2 89.5 90.6 91.6 92.7 93.5
N O P Q R S
87.2 87.7 89.0 90.4 91.3 92.0 93.1
Notes:
1. Bring the entire site to elevation 90.
No Scale 2. All grids are 50’x 50’ = 2500 sq. ft.
3. Present contours
Need Need
150'
Fill Cut
300'
Quick and Dirty
Assume one grid
90' 91'
Existing 90.50
Proposed 90.00 90.5'
Cut 0.50
Total Cost = 150= x833CY
300 x 0.50
27
Prof Awad S. Hanna
If we choose the grid size to be 50’x50’
= 1.92
cut =
= 177.77 CY
and so on.