TRANSWATER API SDN BHD

PROVISION OF ENGINEERING, PROCUREMENT, INSTALLATION AND


COMMISSIONING OF FACILITIES FOR SAFEGUARDING
INSTRUMENTATION (SAINT)

TEMANA TA
ASMOS0001
PO 3620438536
ABV REPLACEMENT
TEP-A ABV-0032, ABV-0430, ABV-0311
TEP-B ABV-850
TEDP-E ABV-0310
AGENDA

1. SCOPE OF WORK
2. CHALLANGE
3. LESSON LEARNT
4. PHOTO
SCOPE OF WORK

Tag No Valve Size / Location Orientation Actuated


Rating / Valve Type
Flange

ABV-0032 8” / 600# / RF TEP-A / Cellar Deck Horizontal Pneumatic

ABV-0430 6” / 600# / RF TEP-A / Cellar Deck Horizontal Pneumatic

ABV-0311 8” / 600# / RF TEP-A / Cellar Deck Vertical Pneumatic

ABV-0310 6” / 600# / RF TEDP-E / Spyder Deck Vertical Pneumatic

ABV-850 6” / 600# / RF TEP-B / Cellar Deck Horizontal Pneumatic


CHALLANGE

1. Actuated Ball Valve was supplied by others


2. Supplied Actuated Ball Valve control panel is typical. Team have to make
site modification for vertical installation orientation.
3. Supplied Actuated Ball Valve control component size is not commonly use
at site. Team have to make site modification to meet with site requirement.
4. Daily tripping from shore put strain, fatigue and lost of productivity to
Team. Pre planning for tomorrow work at jacket required as Tool Box was
station at mother platform.
LESSON LEARNT

1. Installation team must be provided with accurate details of Actuated Ball


Valve.
2. Valve control panel should be design based on existing panel
3. Material contingency is a must as some gasket was damage during manual
transfer to jacket
4. DPR reporting to TA Team via whatsapp group is a great medium to share
progress and update