Given :
Given :
The lot is a regular inside lot where its longer side is parallel to the
20-meter road. The longer lot line of the property stretches at exactly 42 meters in
length. The sidewalk fronting the lot is considered the zero (0) meters elevation.
NOTE: In the occasion that there is conflict with the numerical value and written
word, the written word prevails.
A Proposed 7-storey GOVERNMENT OFFICE BUILDING Project and on a
Project Site having three Percent (3.0%) slope towards the RROW.
Statement of the problem: