Professional Documents
Culture Documents
timeline
history
services
follow
teams
about
Hello!
DEPARTMENT OF
GEOGRAPHY
About Me
timeline
history
services
follow
teams
I am Ashutosh G Deore
MA/MSC SEMESTER 2ND
Subject: GGDT-130: Geography of Tourism
history
LOCATIO
Official Name :- Narmada Valley
Country :- India
ABOUT
Location :- Navagam, Kevadiya
follow
about
Colony, India.
Construction Begun :- April 1987
Opening Date :- 17 Sep 2017
Construction Cost :- 25 Billion Rupees
Owner(s) :-Gujarat, M.P,
Maharashtra, Rajasthan
Type Of Dam :- Gravity Dam
Impounds :- Narmada River
SPILLWAY
Height :- 138.68m,
DAM &
services
teams
about
163 M(height (Foundation))
Length :- 1210m
Spillway Capacity :-
84949cumec
RESEERVOIR
history
services
follow
teams
about
CAPACITY CATCHMEN MAXIMUM
9.5 CUBIC KM T AREA LENGHT
88000 KM SQ. 214 KM
RESERVO
history
follow
teams
about
IR
MAX. NORMAL
WIDTH
1.77 KM MAX.WATE ELEVATION
R DEPTH
140 M 138 M
01 02 03
03
POWER STATION
OPRATOR COMMISSION INSTALLED
timeline
history
CAPACITY
follow
about
SARDAR SAROVR DATE
NARMADA NIGAM 1450MV
JUNE 2006
GEOLOGICAL
L O C AT I O N
GEOLOGICAL
timeline
history
LOCATION
follow
teams
about
dissected hill tracts culminate in the
mathwar hills, located in alirajpur
district of madhya pradesh. Below
these hills narmada river flows
through a long, terrific gorge. This
gorge extends into gujarat where the
river is tapped by the sardar sarovar
dam
NARMADA CANAL
The dam irrigates 17,920 km2 (6,920 sq mi)
of land spread over 12 districts, 62 talukas,
and 3,393 villages (75% of which is drought-
GEOLOGICAL
prone areas) in gujarat and
LOCATION
follow
REFEREN
E
WIKIPED
CE
IA
T H A N K YO U
FOR
YO U R
AT T E N T I O N