Professional Documents
Culture Documents
By Group 12
Outline
2 By Group 12 06/27/2021
Introduction
An Alumni are the assets of the institution.
Alumni association is an association of graduates.
It may organized around University or College.
It build strong connection between organization and Alumnus.
It simplifies the problem of communication.
It works for the benefit of organization and Alumni.
It may participate on charity and fund raising.
Experience of Alumni may be shared for under graduated students.
3 By Group 12 06/27/2021
Background of the organization
MWU was established in Bale, Robe around 1999 E.C.
It is about 430 km away from Addis Ababa.
It has 46 undergraduate and 28 postgraduate programs.
Deliverology is adopted to this University in 2008 E.C.
It is mainly working on Alumni and capacity building.
Student statistics and record also working on this area.
MWU collect Alumni status by calling to them.
3 By Group 12 06/27/2021
Statement of the problem
Difficult in communication:
More complex:
Data redundancy:
Man power:
Security problem:
Wastage of Resources(economic problem ):
Maintainability problem:
Scalability problem
4 By Group 12 06/27/2021
Objective of the project
1.General objective
To develop Web Based Alumni Association Management System for Madda Walabu
University.
2. Specific objective
To understand the problem in the current system.
To propose alternative solutions.
To collecting data to accomplish the system.
To Document the problems that we are identify.
To design user friendly interface.
To develop a database that will be used by the system
To implement, test, deploy and maintain.
5 By Group 12 06/27/2021
Scope of the project
The boundary of the proposed project is for MWU only.
Admin can manage user accounts, search members, view
events and feedback.
Deliverology can manage events; manage forum; search
members and chatting(messaging) with Alumni; receive
Alumni report; post tracer study form and view Alumni
detail.
College Registrar Coordinator can create account for Alumni;
manage Alumni data; generate Alumni report; search
members and post news.
Alumni can edit profile; view uploaded files, view forum
(tutorial) and events (news); search Alumni and chatting
(messaging) with each other and with Deliverology also.
6 By Group 12 06/27/2021
Limitation of the project
2. Limitation of the project
Applicable only in English language.
It cannot work without internet
7 By Group 12 06/27/2021
Significance of the project
Easily access Alumni information in organized and centralized database.
Avoid Alumni file missing and material wastage.
Ensuring timely and efficient sharing of critical information within the
association.
To minimize from more expenditure.
Time consuming tasks should be reduced.
Avoid the information gap between the university and its Alumni.
8 By Group 12 06/27/2021
Methodology and Tools
1.Data collection methodology
• Interview:
• Practical Observation:
• Documents Analysis:
• Brainstorming:
9 By Group 12 06/27/2021
Methodology and Tools
2. System analysis and design methodology
• System Analysis
• Design methodology:
Because:-
• Prototype model is quickly developed,
• easily modifiable and extendible.
• Technological solutions are identified early.
• It secures the user because of the steady and visible progress.
• There will be reappraise or rethink the design.
• It is relatively simple to eliminate useless features.
10 By Group 12 06/27/2021
System development tools
1.Hardware
. requirement:
we will plan to uses the following hardware tools.
Laptop and desktop
Pen and paper-For drafting of idea
Removal disk.
Processor –Intel core i5.
Printer –For printing document
Hard disk-For storage of data
Mobile phone-For taking photos
11 By Group 12 06/27/2021
System development tools
2. Software requirement
Language: PHP, CSS, HTML, JavaScript.
Operating System: window 10
XAMPP server-Have Apache server and Database server
Sublime Text: For writing code
Microsoft Word 2010:For documentation
Microsoft PowerPoint: For presentation
Data storage: PhpMyAdmin/MySQL
Photoshop: For editing images
Browser: Any latest browsers, i.e. Chrome, Firefox, Opera, IE.
12 By Group 12 06/27/2021
Project Management Technique
1. Project Schedule
13 By Group 12 06/27/2021
Project Management Technique
2. Project budget (cost breakdown estimation)
Items Quantity Unit price(in birr) Total price ( in birr)
Pc 2 12,000 24,000
Total 26,050.00
14 By Group 12 06/27/2021
Project Management Technique
3. Project work break down structure
Process name Responsible person Deliverables/Excepted output
Introduction Jundi Introduction of the project
Background of the organization Tesfu Background of the organization
Objective of the project Mideksa Objective of the project
Statement of the problem Tesfu Statement of the problem
Scope and limitation of the project Abel Scope and limitation of the project
Methodology Tesfu Methodology used for the project
Feasibility study Jundi Feasibility study of the project
Beneficiary Mideksa Beneficiary of the project
Significance of the project Jundi Significance of the project
Phase and deliverable of the project Abel Phase and deliverable of the project
Work break down Jundi Work break down
Gantt chart Jundi Gantt chart
Problem of the current system Abel Problem of the current system By Group 12
Business rule identification Jundi Business rule identification
UML diagrams Jundi UML diagrams
Non-functional requirement Abel Non-functional requirement
15
Functional requirement Mideksa Functional requirement
06/27/2021
Implementation All Software
Project Management Technique
4. Risk analyses, identification, mitigation and monitoring
Risk analysis Degree of impact Risk identification Risk mitigation Risk monitoring
Lack of resources High Necessary resources like time ,pc, Using any resource wisely Use every resource effectively
and etc.
COVD 19 High We fear to gather methodology We can minimize its risk by keeping Doing by minimizing our member
social distance, wear mask etc. when we collect information
Virus Medium Software can be attacked by virus Scan file by using antivirus Use antivirus before attacking by
virus
Loss of data Low Suddenly deletion of data Having backup and restore data Carefully store files.
16 By Group 12 06/27/2021
Feasibility analysis
17 By Group 12 06/27/2021
STUDY OF THE EXISTING SYSTEM
19 By Group 12 06/27/2021
20 Object Oriented Database Systems 06/27/2021