IBM’s statements regarding its plans, directions, and intent are subject to
change or withdrawal without notice at IBM’s sole discretion. Information
regarding potential future products is intended to outline our general product
direction and it should not be relied on in making a purchasing decision.
The information mentioned regarding potential future products is not a
commitment, promise, or legal obligation to deliver any material, code or
functionality. Information about potential future products may not be
incorporated into any contract. The development, release, and timing of any
future features or functionality described for our products remains at our sole
discretion.
Scheduler
Scheduler 7.6.5
7.6.5
•• Add-on
Add-on product
product to
to
Maximo
Maximo EAM,
EAM, code
code
embedded
embedded inin core
core
Maximo
Maximo Scheduler
Scheduler Maximo
Maximo therefore aa single
therefore single
install
install
•• Requires
Requires aa separate
separate
license
license purchase
purchase
•• Includes
Includes integration
integration
adapter
adapter and
and optimization
optimization
engine
engine and
and models
Maximo Asset Management models
Maximo
Maximo
•• 7.6.0.8
7.6.0.8 fix
fix pack
pack level
level
3
Roles We Cater To With Maximo Scheduler
• Receives assignments,
optimized routes and directions
• Reports on progress and work
• Assign scheduled work completion
• Monitor and assign Technician
emergencies
• Build daily crews
• View and adjust crew work Floor
in the field Supervisor/ • Model work steps in
Dispatcher Planner
Job Plans and Routes
• Define PM frequencies
• Forecast long term
work and cost
• Use historical data to
adjust the plan
• Assign WOs of a mobile
asset to a facility
• Assign work within the
repair facility Repair • Create rolling work schedule
Facility Scheduler • Resource level
Manager • Schedule windows
• CPM
• Monitor schedule compliance
4
Role Based Applications in Maximo Scheduler
Application Roles
5
Scheduler Plus
Offers the following in addition to Maximo Scheduler
Appointment booking
• Make customer appointments within a schedule window
• Customer notifications – cancel / reschedule
Dynamic dispatching
• Auto refresh, re-optimization based on real-time progress
• Incorporate real-time traffic conditions
Weather integration
• Incorporate weather data into planning/scheduling and dispatching
• Weather alerts / notifications
6
Scheduler Plus – embedded in Maximo
•• End-to-end
End-to-end work
work
management
management solution
solution built
built
on Maximo Scheduler
on Maximo Scheduler
iLog Required only for
DOC Optimization
•• Code
Code embedded
embedded in
in core
core
Maximo
Maximo therefore
therefore aa single
single
install
install
7.6.6
•• Available
Available On-prem
On-prem and
and via
via
SaaS
Maximo
Maximo Scheduler
Scheduler Plus
Plus 7.6.6
7.6.6 SaaS
(includes
(includes Maximo
Maximo Scheduler)
Scheduler)
•• Requires
Requires aa separate
separate
license
license purchase
purchase (license
(license
includes
includes Maximo
Maximo
Scheduler
Scheduler functionality)
functionality)
Maximo Asset Management
7.6.0.8 •• Includes
Includes the
the optimization
optimization
models
models
7.6.0.8 7
Role Based Applications
Scheduler Plus further enhances the Scheduler applications as well
as offers two new applications
Application Roles
^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus
only 8
7.6 highlights
Pedigree
Scheduler 7.6.5
Scheduler 7.6.3 • Planning buckets
• Complete Java Applet • Optimization
replacement with performance and
new technology enhancements
Scheduler 7.6.1 • RFEs/Usability
Scheduler 7.5.2 • New technology
• Optimization • Repair Facility Mgmt Scheduler Plus 7.6.6
Scheduler 7.6.4
• Scenario Management • • Weather Alerts
PM Costing • Excel Export
• Compliance Dashboards • Usability • • Notifications for Alerts
Scheduler 7.5.1 WO Synonym colors
• Graphical Crew Mgmt • and Appointments
• Graphical Assignment PM Start Time
Scheduler 7.6.2 • Project Scheduling –
• Dispatching
Maximo Scheduler • Graphical Scheduling Scheduler Plus 7.6.4 GS-Large Project, CPM
• Schedule Compliance
7.1.1 Asset/Location types • Weather Forecast backward pass and
• Crews
• PM Forecasts • Mult-tenancy support • Appointment Booking filter, % complete
• Everyplace templates
• Gantt usability • Project Scheduling – • Dynamic Dispatching
• Other Resource
Maximo Scheduler 7.1 Availability dependencies
• Work and between anything
Resources in Gantt
• View Labor Load &
Availability
• Critical Path
Method
^enhanced by Scheduler Plus; *available starting with Scheduler Plus 7.6.5; available with Scheduler Plus
only 11
Content for Release 7.6.x Scheduler Plus Scheduler
Weather
- Alert notifications (SMS)
Project Scheduling (Phase 3)
- Schedule dashboard
Appointment Booking (Phase 3)
- SMS notifications
Usability
- Graphical Assignment – work filtering to the Assignment view, Highlighting related
assignments, Show dependencies between selected assignments, Show all dependencies in
assignment view
- Variable Alternate Availability
- Configurable mouse-over and tool tips
Optimization
- GS – Modified Availability
- GS – Alternate Availability
- GA – Multiple Work Zones
- Performance
Performance Enhancements
- Project flag to not load related or non-persistent fields
- Improved SQL
- Select one or more rows for refresh
- Code profiling (clean up from Applet version)
The information on the new product is intended to outline our general product direction and it should not be relied on in making a purchasing decision. The information on the new product is for
informational purposes only and may not be incorporated into any contract. The information on the new product is not a commitment, promise, or legal obligation to deliver any material, code or
12
functionality. The development, release, and timing of any features or functionality described for our products remains at our sole discretion. .
Scheduler Plus SMS Text Messages
Option for text communication in addition to email
15
Scheduler – Graphical Assignment usability - continued
Work View moved before Assignment View
16
Scheduler – Variable Alternate Availability
Don’t have labor, crews and tools in Maximo? Use Alternate Availability to schedule work
Note we now allow decimal values for partial days
19
Scheduler – New Optimization constraints
Graphical Scheduling Graphical Assignment
Resource Leveling and Capacity Planning applies Labor Assignments and Spatial Assignments now
various resource availability applies various resource availability
• Modified Availability of Labor for vacations and extra • Allow secondary work zone assignments
time • Allow Secondary Craft Assignments
• Alternate Availability • Limit to the number of solutions we resolve to
20
Scheduler – Performance Enhancements
Graphical Scheduling - User controlled performance options
User actions that now refresh only a single row instead of refreshing the full
graphical view
My question is on Graphical Assignment Why did they remove the split screen Gantt View
and replace it with the Assignment View and Work View Tabs. The user now has to jump
between tabs to see the trades whiles before they could see everything on the one tab.
23
Resources
Wiki: https://www.ibm.com/developerworks/community/wikis/home?lang=en#!/wiki/IBM%20Maximo%20Asset%20Management/page/Maximo%20Scheduler
24
Questions
25