You are on page 1of 1

S.

No Limitations with proposed system Option-1: Change over Option-2: Modification


mechanism between of existing SVAB panel
cable and OH line at DP at SHAR MRS panel as 4
structures I/C two O/G
01 Maintenance outage increases (both  
number & time)

02 Low voltage surcharges, since common -- 


feeder for ASMP and Launchpad

03 At a time, DG can be extended to either -- 


ASMP or launch pad

04 Less redundancy -- 

You might also like