Overview of Hydrologic Modeling for Project Studies

Hydrologic Engineering Center 1


Objectives
• Describe the role of hydrologic modeling in
USACE studies
• Describe types of studies where watershed
modeling is generally applied
• Describe typical analysis procedures involving
watershed modeling
• Introduce the Punxsutawney Watershed

Hydrologic Engineering Center 2


Runoff Process – Hydrologic Cycle

Condensation
Snow

Precipitation
Transpiration

Infiltration Surface
runoff
Spring Evaporation

Groundwater flow
Water table

Lake River
Ocean

Groundwater

Hydrologic Engineering Center 3


Runoff Process

Hydrologic Engineering Center 4


USACE Studies Requiring Watershed Modeling
• Flood Risk Management Feasibility Studies
• Floodplain Management
• Environmental Restoration
• Flood Forecasting
• Hydrologic Hazard Curve Development for Dam and Levee Safety
• Development of Probable Maximum Flood or Inflow Design Flood
for Dam Safety
• Determination of Pump Station / Interior Drainage Adequacy for
Levee Safety
• Reservoir Storage Reallocation or Water Control Manual Updates

Hydrologic Engineering Center 5


Typical Flood Risk Management Feasibility Study
Requirements
Evaluate the cost effectiveness of proposed
alternatives regarding the reduction of flood damage
magnitude, duration, and/or frequency

Hydrologic Engineering Center 6


Flow
Flow

Stage 1 Exceedance probability 0


Damage

Damage

Stage 1 Exceedance probability 0


Typical Flood Risk Management Feasibility Study
Procedures
When hydrologic modeling is NOT required to fill in data gaps…
• Define study objectives & information needs
• Obtain available streamflow, GIS, etc data
• Develop discharge- and stage-frequency curves for
gaged locations
• Assist economist in developing Without Project
stage-damage and damage-frequency curves
• Apply With Project conditions
• Determine EAD and BCR for all alternatives

Hydrologic Engineering Center 8


Develop Flow-Frequency Curves

Hydrologic Engineering Center 9


Develop Flow-Frequency Curves

Hydrologic Engineering Center 10


Develop Flow-Frequency Curves

Bulletin 17C Procedures

Hydrologic Engineering Center 11


Utilize Regional Information

Hydrologic Engineering Center 12


Typical Flood Risk Management Feasibility Study
Procedures
When hydrologic modeling IS required to fill in data gaps…
• Define modeling domain
– Entire contributing drainage area or smaller area?
• Choose modeling approaches
– Initial and Constant or Green-Ampt losses?
• Discretize modeling domain
– Create elements (subbasins, routing reaches, etc)
• Parameterize elements using chosen modeling
approaches
• Assemble hydrologic model
Hydrologic Engineering Center 13
Typical Flood Risk Management Feasibility Study
Procedures (continued)
• Calibrate the model using at least two events with observed data
• Validate the model using at least one independent event with
observed data
• Develop Without Project conditions
• Develop hypothetical frequency-based storms and apply to
determine flow-frequency at desired locations for Without Project
conditions
• Develop With Project conditions
• Apply hypothetical storms to determine flow-frequency at desired
locations for With Project conditions
• Assist in the determination of stage-frequency for all alternatives
• Assist economist in the determination of EAD and BCR for all
alternatives
Hydrologic Engineering Center 14
Develop Model Parameters
Elevations Land Uses Soil Types

Example Unit Hydrograph Example Deficit and Constant Loss


Transform Regression Equations Parameters
Hydrologic Engineering Center 15
Calibrate Model Parameters

Hydrologic Engineering Center 16


Calibrate Model Parameters
What is wrong with the model output?
Is this model adequate to
develop flow-frequency relationships?

Hydrologic Engineering Center 17


Calibrate Model Parameters

Hydrologic Engineering Center 18


Flow-Frequency from Event-Based Simulations
NOAA Atlas 14 Precipitation-Frequency

Flow-Frequency

7 ,00 0
1.8 HARLOWTR2_CF RUN:1000YR_EVENT FLOW
BIGHEARTCR_S50 RUN:1000YR_EVENT PRECIP-INC HARLOWTR2_CF RUN:100YR_EVENT FLOW
BIGHEARTCR_S50 RUN:500YR_EVENT PRECIP-INC HARLOWTR2_CF RUN:10YR_EVENT FLOW
BIGHEARTCR_S50 RUN:200YR_EVENT PRECIP-INC

Hyetographs
1.6 6 ,00 0 HARLOWTR2_CF RUN:1YR_EVENT FLOW
BIGHEARTCR_S50 RUN:100YR_EVENT PRECIP-INC HARLOWTR2_CF RUN:200YR_EVENT FLOW
BIGHEARTCR_S50 RUN:50YR_EVENT PRECIP-INC HARLOWTR2_CF RUN:25YR_EVENT FLOW
BIGHEARTCR_S50 RUN:25YR_EVENT PRECIP-INC
1.4 HARLOWTR2_CF RUN:2YR_EVENT FLOW
BIGHEARTCR_S50 RUN:10YR_EVENT PRECIP-INC
HARLOWTR2_CF RUN:50YR_EVENT FLOW
BIGHEARTCR_S50 RUN:5YR_EVENT PRECIP-INC 5 ,00 0
HARLOWTR2_CF RUN:5YR_EVENT FLOW
BIGHEARTCR_S50 RUN:2YR_EVENT PRECIP-INC
1.2
BIGHEARTCR_S50 RUN:1YR_EVENT PRECIP-INC

4 ,00 0
1.0

Runoff
Prec ip (in)

Flow (cfs )

0.8
3 ,00 0

0.6 Hydrographs
2 ,00 0
0.4

0.2 1 ,00 0

0.0
00 :00 06:00 12:00 18:00 00:00
Hydrologic Engineering Center 01 Fe b209 9
0
00 :00 0 6 :00 1 2 :00
0 1 Fe b20 9 9
18 :00 00 :0 0 06 :00 12 :0 0
0 2 Fe b20 9 9
19
Flow-Frequency from Continuous Simulation
60 years of Precipitation
Input to HEC-HMS
Estimate Flow-Frequency

60Extract
years Annual
of Runoff
Computed by Flows
Maximum HEC-HMS

Hydrologic Engineering Center 20


Common Hydrologic Modeling Outputs
• Flow-frequency curves for Without and With
Project conditions
• Hydrographs for environmental analysis (highs,
lows, durations)
• Inflows, pool elevations, and outflows for dam
safety studies
• Forecasted flows and pool elevations
• Hydrographs for hydraulic models
Hydrologic Engineering Center 21
Guidance Documents
• Flood Runoff Analysis (EM 1110-2-1417)
• Hydrologic Engineering Requirements for Flood Damage
Reduction Studies (EM 1110-2-1419)
• Inflow Design Flood for Dams and Reservoirs (ER 1110-8-2)
• Hydrologic Analysis of Interior Areas (EM 1110-2-1413)
• Runoff from Snowmelt (EM 1110-2-1406)
• Hydrologic Frequency Analysis (EM 1110-2-1415)
• Hydrologic Engineering Studies Design (EP 1110-2-9)
• https://www.publications.usace.army.mil/USACE-Publications
/Engineer-Manuals/
Hydrologic Engineering Center 22
Punxsutawney Watershed

Punxsutawney, PA

Philadelphia, PA
Pittsburgh, PA

Hydrologic Engineering Center 23


Punxsutawney Watershed

Hydrologic Engineering Center 24


Punxsutawney Watershed

Hydrologic Engineering Center 25


Punxsutawney Watershed

Hydrologic Engineering Center 26


Review
• Hydrologic models are used in many types of
USACE studies
• Flow-frequency relationships are a key part of
flood risk management studies
• Hydrologic modeling can be used to estimate
flow-frequency
• Punxsutawney watershed will be used for
workshops
Hydrologic Engineering Center 27