Lecturer: Dr. Very Dermawan, ST., MT.

A Hydraulics Structure Assignment:

Model Test of
Karangdoro Weir
Yasnuar Muntaha (176060400111014)
Yusvika Amalia (176060400111020)

MAGISTER OF WATER RESOURCES ENGINEERING


UNIVERSITY OF BRAWIJAYA
2017
INTRODUCTION
Physical Hydraulic Model is a scaled representations of a
hydraulic flow situation. Both the boundary condition (e.g.
channel bed, sidewalls), the upstream flow conditions,
and the flow field must be scaled in an appropriate
manner.

Weir is an impervious barrier constructed across a river


to raise the water level on the upstream side. The water is
raised up to the required height and the water then flows
over the weir. Weirs have traditionally been used to
create mill ponds. They are also used to prevent flooding,
measure discharge, and help render a river navigable.

2
BACKGROUND

Asset Karangdoro
Food Security
Managements Weir

3
Purpose of this hydraulic
modelling is to analyze the
hydraulic characteristics on the
overflow of Karangdoro Weir

Objectives of this study is to


provides suggestions for the
rehabilitations of Karangdoro
Weir.

4
Study Area

► Located in Karangdoro Village, Karangdoro Weir


Blok Agung Village, Tegalsari Location

Sub-district, Banyuwangi
Regency, East Java.
► Was built at 1936 by spanning
Kalibaru River to supply 16,442
Ha of irrigation area.
► At 2007, the irrigation area
decreased to 15,910 Ha.

5
L
A
Y
O
U
T

6
Upstream Of
Karangdoro Weir
Downstream Of
7
Karangdoro Weir
GENERAL INFORMATION
Model of Karangdoro Weir
 Model-1 : Slope in downstream of weir 1 : 1
 Model-2 : Slope in downstream of weir 1 : 0,6

Model - 1 Model - 2
8
Preparation

Secondary Data Collection

Compilation Data and Evaluation


Research Literature

Survey Project Location Modification

Physical Model Planning Physical Modeling


PembuatanModelFisik Implementation of the model Test
•Congruency Criteria •Material collection
No
•Pengumpulanbahan •Calibration and verification
•Scale •Plotting point control
yangdipersyaratkan •Original model and alternative
•Froude Criteria •Construct
•Pemasangantitik-titikprofil model Meet the
•Scour •Instrumental Installation
•Pembuatanbangunan •Model investigation criteria
•Tools •Pemasanganinstrumentasi •Flow Pattern investigantion
•Layout model and instrument •Scouring investigation
placement •Flow Measurement
yes

Conclusion and Recomendation

FLOW CHART Finish


MODELLING PROCESS
The model scale used in this test is Ratio between Model and Prototype
based on the following
considerations: Ratio
No. Parameter Symbol Formula
× The purpose of the test (nh = nL=30)
× Expected accuracy
× Facilities available in the
laboratory (space, 1 Flow Rate u nu = nh½ nu = 5.477
equipment, and pumping
capacity) Flow
× Time and cost available 2 t nt = nh½ nt = 5.477
Duration

Then, the test model is


determined using an undistorted 3 Discharge Q nQ = nh5/2 nQ = 4929.503
model with a scale of 1:30.

10
RESULTS
Flow Velocity Calculation

The result of comparison of the flow velocity at each point is


obtained from point 3 and 4, the Model-1 have higher flow velocity
than the Model-2.

11
Documentation of Basic Dredging Observation

Scouring In Downstream of Spillway


Model-1
Scouring In Downstream of Spillway
Model-2

12
Conclusions

The model is using the undistorted scale 1:30 ,


with 2 design alternatives, Model 1 with a
slope of downstream face 1:1 and Model 2
with a slope of downstream face 1: 0.6.

Model-2 has a lower velocity in downstream of


the spillway, because the energy reduced by
the floor of pond is larger than Model-1, so the
hydraulic jump is shorter and the whirlpool Is
smaller.

13
Suggestions

The elevation of the stilling basin should be lowered to


dissipate the excess energy of water .

To avoid damages of the floor, it should be coated by


concrete material.

The left and right side of the endsill downstream should


be reinforced by gabion to avoid scouring.

Performing riverbank measurements to ascertain the


scouring condition.

River-cliff around the pond is prone to landslides, so it


needs reinforcements.

14
FOR YOUR ATTENTION

15