Importance of Ballast & its Operations
Draft suitable for ship handling – effect of wind
Not too stiff / tender – stability
Minimum draft requirement as per stability
booklet
Propeller immersed
BM and SF within allowable limits
Remains upright
Required trim maintained
Max air draft not exceeded
Max coaming air draft not exceeded
Capt.ABA
Incorrect Ballast Management
Vsl capsized – insufficient ballast , wrong timing
Vsl broken in two – incorrect combination of
cargo/ballast
Grounding at berth
Lighters sunk alongside
Cargo damaged by flooding
Cargo contaminated – wrong valves
opened/shut
Tanks ruptured due to pressure/vacuum
Pumps burnt due to inattention
Undercarriage of cargo due to inability to
deballast fully Capt.ABA
Piping system
Ballast system typically consists of
pipelines from the ballast tanks to the
ballast pumps (Some times Fire & GS
pump in the engine room can be put
into use) which are connected to the
sea chest & overboard discharge. It is
possible to by-pass the ballast pump
and carry out ballasting/deballasting by
‘gravity’ using the level difference of a
tank & sea
Capt.ABA
Pumps
Capt.ABA
Valves
Capt.ABA
Ball Valves
Capt.ABA
Globe valve
Capt.ABA
Gate valve
Capt.ABA
Butterfly valve
Capt.ABA
Non Return valve
Capt.ABA
Capt.ABA
Control System
Capt.ABA
Deballasting problems
Loading of cargo to cope with deballasting
Adjusting rate of loading / deballasting / trim
pumping DB tanks
leaking ballast lines – holes in piping, valve failure
pump tripping
gauge settings
gassing , vacuum pumps
Cracking another valve
Blocked lines
Ballast pollution
Capt.ABA
Attention Note on Ballasting / Deballasting
Minimising the amount of ballast
Ballast Plan
Ships Ballast System – learn the layout ,
piping sounding , air pipes , Tanks and
pipelines , Pumps
Pumping ballast
Speed of ballast
Ballasting responsibility
Centralised controls
Local control
Basic ballast procedures
Monitoring the ballast
Capt.ABA
Attention Note on Ballasting / Deballasting
Hand soundings – daily record ,
Checking air pipes
Checking adjacent holds
Rechecking soundings
Using Gravity
Over-pressurising tanks
Avoiding List
Double hull vessel – FSE
Blocked sounding pipes
Dumping valves
Check overside – cargo , electric connections, barges
Filling topside tanks - leaks
Ballasting Holds
Ballast Book & Daily sounding log
Final remaining ballast Capt.ABA
Ballast water management plan
• BW exchange
• Treatment
• Flow through
Capt.ABA