Provides complete Mechanical, Electrical & Public Health & Safety (MEP) solutions
Among the largest solar EPC contractors in India with a portfolio of > 300 MW
India’s largest Electrical contracting company and third largest HVAC service
provider
Offers Co-generation: Gas based Combined Heat & Power (CHP) turnkey solutions
PAN India Presence
Branch Offices in :
Serves entire portfolio of Engineering, Supply, Civil, Project Management, Erection, Testing,
PAN India Presence
Commissioning & Maintenance of EHV substation & Transmission Lines
Also offers turnkey solution across the cross section of Industrial sectors like Steel,
Aluminum, Copper, Paper, Chemical & Petrochemical, Material handling projects, E.B.O.P of
Central
Organization Govt. of
Railway Manipur
Electrification
RRVPNL
T&D Portfolio
AIS Sub Station GIS Sub Station RE / Transmission Line EBOP Metro
Under the IPTC projects bid by Adani Group, S&W has been awarded the
contract for Engineering, Manufacturing, Supply, Erection, Testing and
Commissioning including Civil works of 1 No. 765kV Line Bay works at
NTPC Sipat.
Extension of other 400 kV & 132 kV Substations involving supply, erection, testing
& commissioning of the various Transformers & Reactors including 500 MVA
Transformers & 125 MVAr Reactors along with other equipment including civil &
structural works.
Bagged this order under stiff competition from Alstom & Siemens
PROJECT SNAPSHOT
Scope - 6 Bays of 400kV
- 12 Bays of 220kV
- CRP, supply of all associated Eqpmnt.
Location Varsana, Gujarat
RRVPNL 400 KV s/s at Ratangarh & Sikar
RRVPNL
Ratangarh 400kV s/s
RRVPNL has entrusted Sterling & Wilson to construct 400kV bays for
termination of its critical 400kV double circuit Ratangarh, Sikar transmission
line.
PROJECT SNAPSHOT
Scope 400kV bays extension at the existing 400kV
Ratangarh and other works at 220 KV Sikar.
Civil works incl Control Room Building
Bagged the order for construction of 1No. 400 kV Bus Reactor Bay at
Amritsar, 1No. 400 kV Bus Reactor Bay at Hisar, 1No. 400 kV Bus Reactor Bay
& 1No. Tie Bay at Jalandhar, 1No. 400 kV Bus Reactor Bay at Nalagarh.
PROJECT SNAPSHOT
Scope 400KV 80 MVAR, 125MVAR Reactor
Bays
Mariani, Imphal , 220 kV green field Sub-station at Mariani Power Grid 2013
Mokokchung, 5 Nos. 132 KV Bay extension Corporation of India
Melriat , India Limited
Amreli, Gujrat, Engineering, Supply, Erection, Testing & INOX WIND Saicon Engineers, 2016
India Commissioning of 220/33kV, 2x100MVA substation Mumbai
including Civil works and construction of Control
Building
Trombay, Mumbai 220KV Switchyard Bays, including integration of Tata Power Tata Consulting 2014
SCADA system with that of existing installation Engineers
Pata, Uttar 220/33 KV, 2x50MVA Outdoor Switchyard including Gas Authority of Engineers India 2013
Pradesh, India supply of Transformer, Civil works and construction of India Limited Limited, Gurgaon
Control Building
PROJECT SNAPSHOT
Scope - 5 Bays of 220kV GIS Double Busbar ( 2 Line, 2 TR, 1 Bus Coupler)
- 16 Nos of 11kV Switchgear Panel
- Supply of 2 No 50MVA Transformer
- CRP, SCADA,PLCC,, Outdoor switchyard Equpts, Civil works, GIS and
Control Room Building
WEST BENGAL STATE ELECTRICITY TRANSMISSION CO. LTD.
220/132 KV GIS Substation at Gazole, West Bengal
Breakthrough order from MSETCL for 220/33 kV GIS Substation at New Timber
Market Panvel, Dist. Raigad under Vashi zone.
Supply, Civil, Erection, Testing & Commissioning of 220kV GIS bays – 7 Nos (4
Line Bays, 2 Transformer bay, 1 No Bus Coupler), 33kV Indoor GIS Panels –
11 Nos, 2No. 50MVA 220/33 kV Transformers, CRP, SCADA, FOTE, PLCC, ABT
Metering & other outdoor equipment
Project :2 - 132KV GIS – 5 Bays (2 Line Bays, 2 Transformer Bays, 1 Bus Coupler Bay) , 33KV Indoor Switchgear (15 No VCB Panels),
EHV Cable, Outdoor Switchyard Equipment and Civil Construction for 132/33kV integrated GIS and Control room building & Dormitory
Cum C-type quarter and outdoor switchyard equipment foundation at Sonakhali. Completion: September 2018
Project :3 - 132KV GIS – 5 Bays ( 2 Line Bays, 2 Transformer Bays, 1 Bus Coupler bay along with Bus duct), 33 KV Indoor
Switchgear (17No VCB Panels), PEB Building and Civil Construction of Control Room, Dormitory and C-Type Quarter at Dinhata. Project
Completed in ‘2018.
Metro Project
Maha Metro Rail Corporation Limited, Nagpur, Maharashtra
Mihan Depot
Break through order from Maha Metro Rail Corporation for complete power supply
system
Design, Supply, Installation, Testing & Commissioning of Electrical Power Supply system
for 38 Nos. Metro Stations having a total span of 38.2 km comprising of 132KV GIS,
33KV AIS Switch Board, 25KV GIS, Main Transformers, Traction Transformers, Cable,
SCADA, LV Equipment, DC system and other electrical auxiliary system
The project is under execution and scheduled for commissioning on Aug 2020 Morris College
• Back to back 2nd Order from MAHA-METRO. We are qualified with our
own credentials.
• Pune Metro has 5 nos. underground stations, which will add up to our
experience.
ROUTE MAP
• First Break through Order from DMRC
• First project with OHE scope (18.59kms), 17 elevated ASS stations with OCC & BCC
The project is under execution and scheduled for commissioning on Aug 2022
OHE
International Projects
First International T&D Project being awarded
2 Jharkhand Bijli Vitran Electricity Infrastructure development in Garhwa Supply,installation,testing & commssioning of the following- 107.38 Successfully completed.
Nigam Ltd Town,Jharkhand,India a. HT overhead line of of 282.5 KMs
b.LT overhead line of 1125 KMs
c. 25 KVA Distribution Transformer of 1162 nos
3 West Bengal State Electrification work of 14 No. unelectrified 59 No. partially Supply, installation, testing & commissioning of 78.34 Successfully completed. This being a
Electricity Distribution electrified the following milestone job as Sundarbans is an
Company Ltd villages in Gosaba, India a.11 KV overhead line of 357 KMs Island. The main challenge was river
b.1.1 KV overhead line of 1016KMs transportation of material.
c. 25/63 KVA Distribution Transformer of 640 No.
d. 7259 No. of service connection
4 Goa Electricity Board Work of conversion of 11 KV overhead Supply, installation, testing & commissioning of 73.51 Besides being a tourist place, GOA is
lines to underground network in the the following- heavily populated .Even after
areas of coastal belt & tourism places at Goa, India. a.11 KV underground cable laying of 157.49 KMs problems of right of way (ROW) the
b.1.1 KV underground cable laying of 47.61 KMs job was successfully commissioned.
c. 282 No. Ring Main Unit
d. 282 No. of Distribution Transformer
5 MAHAVITRAN, Infra Plan Phase II,Distribution network Supply ,installation, testing & commissioning of the following 157.16 Successfully completed.
Maharashtra in Pune ,Maharashtra India a. 6 Nos. Of 5/10 MVA Power Substation
State Electricity Board b.76 KMs of HT Underground cable laying
c. 492 KMs of HT and LT distribution line
d. 2100 No. 320/200/100/63/25 Kva DTR Substation.
LIST OF MAJOR JOBS EXECUTED IN DISTRIBUTION SECTOR
Project Value
Sl no Customer Name of the Project Project Description Status/Remarks
in INR (Cr)
6 Madhya Pradesh Poorv Supply of materials, survey, installation Supply, installation, testing & commissioning of 72.86 Successfully completed.
Khestra Vidyut Vitran testing, commissioning and maintenance the following
Company Ltd contract of High Voltage Distribution a. 11 KV overhead line of 992 KMs
System in Jabalpur,India. b.1.1 KV overhead line of 168 KMs
c. 25 KVA Distribution Transformer of 4238 No.
d. 16 KVA Distribution Transformer of 734 No.
7 Town Electrification Power Grid Corporation of India Ltd Supply ,installation, testing & commissioning of the following- 65.98 Successfully completed.
works in Raibareli a. 33 KV overhead line of 79 KMs
District of Uttar Pradesh b. 11 KV overhead line of 605 KMs
under Rajiv Gandhi c.1.1 KV overhead line of 2328 KMs
Grameen Vidyutikaran d. 25/16 KVA Distribution Transformer of 1858 No.
Yojana (RGGVY)
8 West Bengal State Supply, erection,testing and commissioning of all related Supply, installation, testing & commissioning of 51.53 Successfully completed.
Electricity Distribution equipment on turn-key mode for construction of 3 nos New the following
Company Ltd 33/11 KV Sub-station and assotiated 33 KV & 11 KV lines under a.3 nos 10 MVA 33/11 KV Power substation.
IPDS in urban areas of Burdwan Region of WBSEDCL. b. 33 KV UG cable laying of 68.87 Kms
c. 33 KV overhead line 41.21 Kms
9 West Bengal State Electrification work of Asansol Town Supply, installation, testing & commissioning of 42.11 Succesfully completed. This job was
Electricity Distribution the following done in
Company Ltd a.31 Kms OF 11KV AB cable heavily populated town
b.70 KM Overhead HT Line areas of Asansol. West
c. 654.99 Kms LT distribution line Bengal, India.
d. 183 No. 100Kva DTR Substation.
10 West Bengal State Design, engineering, manufacture, Supply and delivery, Capacity augmentation of 20 nos of 33/11 KV Substations under 40.57 Successfully completed.
Electricity Distribution Installation of Materials for Augmentation of capacity of Midnapore zone of WBSEDCL.
Company Ltd identified 33/11 KV Substations by installation of Higher
Capacity Power Transformers & replacement of old existing 33
KV MOCB & 11 KV OCB panels by SCADA Compatible 33 KV VCB
& 11 KV VCB Panels along with associated equipments at
different 33/11 KV Sub-Stations under Midnapore zone of
WBSEDCL.
LIST OF MAJOR JOBS EXECUTED IN DISTRIBUTION SECTOR
Project Value
Sl no Customer Name of the Project Project Description Status/Remarks
in INR (Cr)
11 Damodar Valley Rural Electrification Work in Dhanbad Supply ,installation, testing & commissioning of the following 36.57 Successfully completed.
Corporation District ,Pkg A,Dhanbad ,India a.11 KV overhead line of 587 KMs
b.1.1 KV overhead line of 516 KMs
c. 25/16/10 KVA Distribution Transformer of 640 Nos
d. 7259 No. of service connection
12 West Bengal State Design, engineering, manufacture, Supply and delivery, Capacity augmentation of 36 nos of 33/11 KV Substations under 36.35 Successfully completed.
Electricity Distribution Installation of Materials for Augmentation of capacity of Kolkata zone of WBSEDCL
Company Ltd identified 33/11 KV Substations by installation of Higher
Capacity Power Transformers & replacement of old existing 33
KV MOCB & 11 KV OCB panels by SCADA Compatible 33 KV VCB
& 11 KV VCB Panels along with associated equipments at
different 33/11 KV Sub-Stations under Kolkata zone of
WBSEDCL.
13 National Projects Construction Of Flood-Lighting Along 1.1 KV underground cable laying of 676.90 KMs 35.71 Successfully completed. This cable
Construction Indo-Bangladesh Border in Shillong laying job was done in hilly areas of
Corporation ,Meghalaya,India Meghalaya, Indo-
Bangladesh Border.
14 100% Electrification of West Bengal State Electricity Distribution Company Ltd Supply,installation,testing & commssioning of the following- 31.33 The job was done in Sagar Island
Sagar Island under ICZM a. 11 KV overhead line of of 384 KMs which is a water logged area.This
Project India b.1.1 KV overhead line of 835 KMs job is one of the challenging job.
c. 25/16 KVA Distribution Transformer of 595 nos
15 National Projects Construction Of Flood-Lighting Along 1.1 KV underground cable laying of 391.96 KMs 25.25 Successfully completed. This cable
Construction Indo-Bangladesh Border in Tura laying job was done in hilly areas of
Corporation ,Meghalaya, India Meghalaya, Indo-
Bangladesh Border.
LIST OF MAJOR JOBS UNDER EXECUTION IN DISTRIBUTION
AWARDED LATEST Value of
SL No. Client Project Description/ Scope Contract Status/Remarks
(Rs. Cr)
1 Orissa Power Design, Engineering, Assembly, Manufacturing, Testing, 198.72 85% COMPLETED
Transmission Company Supply, Loading, Transportation, Unloading, Insurance and
Limited Delivery at site, of all items/ materials required to complete
the Electrification works under IPDS Scheme CESU Circle
2 Orissa Power Design, Engineering, Assembly, Manufacturing, Testing, 214.74 81% COMPLETED
Transmission Company Supply, Loading, Transportation, Unloading, Insurance and
Limited Delivery at site, of all items/ materials required to complete
the Electrification works under IPDS Scheme SOUTHCO Circle
3 Orissa Power Design Engineering and Supply of equipment/ Materials 82.73 90% COMPLETED
Transmission Company (including Mandatory Spares) with complete facilities for
Limited execution of works "erection and commissioning of 33/11KV
(GIS) Sub Stations and Associated Lines in the area of CESU,
SOUTHCO and WESCO PKG V Contract
4 Power Grid Corporation Package ASM DMS 2 associated with NER Power System 69.62 70% COMPLETED
of India Limited, Improvement Project
5 Power Grid Corporation Package ASM DMS 3 associated with NER Power System 73.55 70% COMPLETED
of India Limited, Improvement Project
6 Power Grid Corporation Design,engineering ,assembly,manufacturing supply and 22.42 75% COMPLETED
of India Limited, documentation of all items/material required to execute the
33/11 KV New S/s,Capacity augmentation of existing
s/s,33KV S/C line (Wolf),addition of 1 no.33KV line bay and
installation of OPGW and ADSS F/optic cable etc. Nagaland
DMS 3
LIST OF MAJOR JOBS UNDER EXECUTION IN DISTRIBUTION
AWARDED LATEST Value of
SL No. Client Project Description/ Scope Contract Status/Remarks
(Rs. Cr)
7 Power Grid Corporation Design,engineering ,assembly,manufacturing supply and 19.61 75% COMPLETED
of India Limited, documentation of all items/material required to execute the
33/11 KV New S/s,Capacity augmentation of existing
s/s,33KV S/C line (Wolf),addition of 1 no.33KV line bay and
installation of OPGW and ADSS F/optic cable etc in Nagaland
DMS 4
8 Durgapur Projects Supply of all equipments and materials related to 24.05 80% COMPLETED
Limited construction of 3 nos New 33/11 KV Substation and
associated lines through Turnkey Basis under IPDS Scheme
in Durgapur Town
9 West Bengal State Design , Engineering, Manufacture, supply & delivery of 150.92 65% COMPLETED
Electricity Distribution Materials for Implementation of HVDS by installation of new
Company Limited, DTr and using AB Cable in semi-urban and rural areas of
Habra and Bongaon Divisions under North 24 Parganas
Region
10 West Bengal State Strengthening of existing Sub-transmission & Distribution 41.55 60% COMPLETED
Electricity Distribution network in urban area of Malda Region of WBSEDCL, West
Co Ltd Bengal under Integrated Power Development Scheme (IPDS)-
PACKAGE – I
11 West Bengal State Strengthening of existing Sub-transmission & Distribution 32.57 60% COMPLETED
Electricity Distribution network in urban area of Birbhum Region of WBSEDCL,
Co Ltd West Bengal under Integrated Power Development Scheme
(IPDS)-PACKAGE – II
12 West Bengal State Strengthening of existing Sub-transmission & Distribution 169.00 70% COMPLETED
Electricity Distribution network in urban area of Bidhannagar Region of WBSEDCL,
Co Ltd West Bengal under Integrated Power Development Scheme
(IPDS)-PACKAGE – III
13 Jharkhand Bijli Vitaran Rural Electrification work for Supply & Erection work on 181.52 50% COMPLETED
Nigam Limited Turnkey Basis of Package 3 in Jharkhand State under
Jharkhand Sampurna Bijli Achachhadan Yojana (JASBAY)
Phase II
LIST OF MAJOR JOBS UNDER EXECUTION IN DISTRIBUTION
AWARDED LATEST Value of
SL No. Client Project Description/ Scope Contract Status/Remarks
(Rs. Cr)
14 West Bengal State Strengthening of existing Sub-transmission & Distribution 76.96 90% COMPLETED
Electricity Distribution network in urban area of Howrah Region of WBSEDCL, West
Co Ltd Bengal under Integrated Power Development Scheme
(DDUGJY)
15 South Bihar Power Supply & Erection work of R&M of 11KV and LT Lines by AB 55.02 30% COMPLETED
Distribution Company Cable for reduction of AT & C losses on turnkey basis for
Limited strengthening, improvement & augmentation of distribution
system under special plan (BRGF) scheme in Patna district of
South Bihar.
16 North Bihar Power Turnkey Contract for Providing Service Connections with LT 65.51 Work Started
Distribution Company Line Extension including Agricultural Connection in Purnea
Limited Circle.
17 North Bihar Power Turnkey Contract for Providing Service Connections with LT 36.50 Work Started
Distribution Company Line Extension including Agricultural Connection in
Limited Kishanganj Circle.
18 Bangladesh Power Design, supply, erection, installation, testing & 21.00 90% COMPLETED
Development Board, commissioning of 33/11KV AIS Substations on turnkey basis
under power distribution system development project,
Rajshahi zone (Pkg-03)
19 Bangladesh Power Design, supply, erection, installation, testing & 28.44 90% COMPLETED
Development Board, commissioning of 33/11KV AIS Substations on turnkey basis
under power distribution system development project,
Rajshahi zone (Pkg-05)
20 Compagnie Energie Rural Electrification of 150 Localities in Togo: Lot 2 50.08 65% COMPLETED
Electrique du Togo Construction of MT & BT Networks in Centrale and Plateux
region.
1,614.50
Distribution Business Competencies
Under Ground Over Head Lines Experienced in Experienced in Stood Beside
Cable Laying cross Districts and Working Remote Working Customer in
Towns Locations in the Metropolitan most Difficult
Country Urban Areas Times
LOGISTICS
2 CHALLENGE
Remotest 73
Islands Villages
NO
Power
Till 2016
2 YEARS
2 Lakhs
Villagers
640
Transformers
23000
Service
Connections
600
KM of LINE
Thank You!