Professional Documents
Culture Documents
Operation of V Switchgear: at Punnapra Ss
Operation of V Switchgear: at Punnapra Ss
SWITCHGEAR
AT PUNNAPRA SS
11 k V INCOMERS
PROTECTIVE RELAYS BREAKER RATED CT RATIO
CURRENT & VOLTAGE
INC #1 IDMT OC/EF RELAY – ER MJT314 1250 A 800/5
REF – ER 5B3 11 k V 50 Hz
• SAFETY HELMETS
• SAFETY SHOES
• LT/HT GLOVES
• RUBBER MATS
• FIRE RETARDENT CLOTHES
• Do not operate 11 k V BREAKERS standing straight in front of their panels , instead stand in front of
the panel front door hinges.
• Ensure that the load on each phase is 0 A after ‘switching OFF’ HT panel breakers
• Rack IN / OUT operations shall be done only after ensuring the breaker is in OFF condition.
PROTECTION DURING OPERATION
• Rack IN / OUT operations shall be done only after closing PANEL FRONT DOOR.
• Ensure that the breaker is in OFF condition before operating YARD AB.
• Read the feeder name boards and confirm before operating YARD AB.